6. Project : Riyadh Metro
Company : BACS
Clint : Riyadh Metro(RMTC)
Responsibilities as follows:
Perform material take off, procurement support & Coordinate ordering of material and track the progress /
status of material delivery to site.
Verification of received materials VS ordered material.
Preparation of method statement for electrical installation and update JSA according to scope of work,
Review and verify drawings & relevant documents as per scope of work and Support design review
meetings.
Effectively planned, supervised the execution, monitored and controlled facilities construction projects.
Review the project technical specification and resolve any discrepancy hindering the project advancement.
Onsite supervision and monitoring of installation of all major electrical / instrumentation components within
substations include transformers, HV & LV switchgear, control gear, bus-bars, panels and their associated
wiring.
Determine method of construction, labor needs, material quantities, equipment needs, temporary power
sources, and work schedule for the effective commencement Assist in the reporting of the job’s progress
tothe Project Manager; maintain communication with other departments as required Liaising with the
QA/QCdepartment to ensure that the installation complies with the specified codes and procedures.
Ensure proper preservation of the material in accordance with the approved project specification and
Vendor's recommendations.
Collaborate on establishing plan to achieve goal or schedule set by client.
Meets with Client's technical staff to discuss technical information and feature.
Participate in constructability review meetings with Subcontractor and Client.
Generate inspection and test records or coordinate with quality control Construction administration phase,
process shop drawing, responds to RFIs and perform site visit during the construction phase to ensure
project adhering to specifications and design.
Provided guidance, training, and development of the field electrical and instrumentation personnel and
conduct tool box talk on weekly basis.
Grounding system Installation, and testing of individual and complete ground grid/loop.
Site surveillance to check the construction work and give comments if necessary, according to standard
project specification.
Responsibilities as follows::
Attending weekly Activity completion date (ACD) meeting with the client.
Weekly meeting with construction and client for ongoing issues and non-conformance report.
Discussion on the daily issue and finding their solution as per Saudi ARAMCO and international
standards.
To perform the material receiving upon arrival on the site to compliance in accordance with the
approved material requisition, Project specifications, Factory test Certificates, Client material
specifications, inspection forms & ensure that material received at the site are per project
specifications and are from the approved vendor list of the client.
To verify the latest revision of issued for Construction (IFC) drawings as per the Engineering drawing
register. Verify the controlled copy of the latest project Specifications, approval of the Inspection & Test
Plans (ITP's), Project Quality Plan and Quality system procedures, etc. prior to
startup of the work ARAMCO Standards, National & International Codes & Standard as NEC,
NFPA, IEEE, IEC, ANSI,NEMA, NETA etc.
Reporting both verbally & in writing any non-conformance discovered.
Prepare Non-Conformance Reports for Non-Conformance activities against the approved quality
plans,Inspection test plans & relevant to the client Familiar with Company rules, procedures,
project specification, security and safety levels.
The witness of Instrument cable continuity & IR test.
Preparing the necessary documentation (two weeks look ahead the inspection schedule, RFIs,
Inspection Reports, etc.)
Monitor the Installation of Fire Alarm/Protection System (Addressable).
Monitor the Installation of Intercom Communication System.
Site Inspection for the Electrical Installations, Electrical Equipment, Cables Laying, Cable
termination, Indoor & Outdoor lighting Installation as per the approved inspection & test plan.
Identifying and recording quality problems and opportunities for improvement and initiating or
recommending solutions.
Witness and verify Continuity, Megger for Low Voltage equipment.
Supervise and Monitor Installation of Cable, cable tray, Lighting, Distribution Control Panel,
Electrical Equipment and Grounding System, etc.
Monitoring the inspections & testing and make sure, if it is conducted as per Standard &complying
all the Project specifications.
Conducts material receiving inspections.
Prepares and submits Request for Inspection (RFI) on completed works to clients for their approval.
Review subcontractor or supplier quality document submittals (Quality Plans, Inspection Test
&Plans, procedures), to ensure effective controls are in place in key areas.
Review Material and Service Requisitions bid tabs (including QA evaluation of bids),
Subcontracts and Purchase Orders.
Monitoring and reporting on the status of implementation of the Project Quality
ManagementSystem and its effectiveness.
Check and review construction/installation sketches and/or shop drawings ensure that
thesketches/drawings conform to the project specifications and standards.
Coordinates with the client representatives on matters involving quality assurance and
controlactivities.
Monitor the Installation of CCTV Security Camera Network.
Supervision of MV/LV cable laying.
Installation Inspection and termination of 20,000 meter MV cable.
Installation Inspection and termination of 25,000 meter LV cable.
Responsibilities as follows:
Responsibilities as follows:
EDUCATION PROFILE/CERTIFICATION: