You are on page 1of 4

Shaikh Zahir

B.E MECHANICAL ENGINEER


Headline : Mechanical Engineer having 5 year of Experience in Refinery,
Petrochemicals, Oil & Gas Project for Piping/Pipeline Erection, Maintenance, Pre-
Commissioning & Commissioning Activities.
CAREER OBJECTIVE
Worked effectively in a dynamic Environment wherever I can put my knowledge into practice & grow
with the company.My strength includes technically strong, hard work, good communicating skill,
courage and positive attitude towards life.
EDUCATION

 Completed P.G Diploma in Piping Engineering from Suvidya Institute of Technology


Pvt.Ltd (Mumbai) from period Sep-2014 to DEC-2014 with B-grade.
 Completed B.E Mechanical Engineering from Rizvi College of Engineering Mumbai University at
Aug-2014 with 63.73 % (First class).
 12th from Cosmopolitan Valia Jr.College of Science in 2010 with 75.83% marks.
 10th from M.A High School Maharashtra State Board in 2008 with 73.69% marks
PROJECTS
1. Project :ULFA Project - P-111001
 Client : CC Energy Development (Oman)
 Company : Al-Haditha Petroleum Services SAOG (Oman)
 Position : Mechanical Supervisor
 Date : 6th Jan-2018 to 4th Jan-2020.
RESPONSIBILITIES
 Understanding project scope of work, participating in technical discussion & ensuring
compliance with the prescribed company, clients, standards and statutory regulations.
 Handling 5-team at same time and conducting daily TBT meeting with all team members
and progress review meeting on weekly basis with contractors and client on work status.
 Responsible for on-site fabrication of piping and erection as per given drawing.
 Preparation of Thermal Expansion Loops as per requirement.
 Attending daily planning meeting and discussing the work to be done and co-ordination on
change in pipeline route and technical supports to Clients and sub-contractors on change in as
per physical site condition and decision making on trouble shooting job.
 Monitoring the welding activities as per WPS procedure and witnessing Welder
Qualification Test for welders; conducting visual inspection of fit up and welding joint
and performing visual inspection as per code specification.
 Organizing inspection on Pipeline fabrication & spools fabrication, pipe supports
fabrication and inspecting and witnessing all site quality activities like electrodes
qualification test, fit up, weld visual etc and co-ordinating with QC and NDT team for RT
activity.
 Individually preparation of different types of Permit to work as per job requirement and keeping
proper coordination with client, sub-contractor, vendor and other responsible department for
smooth flow of job and work to be completed in committed time.
 Preparation of Risk assessment, Method of Statement and JSA for the Job activity to be
done.
 Conducting the purging, flushing, Hydro test for Valves, PSV/PRV, Pipeline/Piping system and
preparation of temporary spool for testing.
 Clearing all the PSSR punch point before conducting Pre-commissioning activity.
 Follow-up the consumable material, filter spares, tubes, trays and other materials for regular
maintenance and services record
 Satisfactory identification of materials, proper protection of piping and fittings. Verify proper
size and schedule of pipe, rating of flanges, proper flange face and fittings had been used.
 Maintaining the quality of work with Site Safety (Zero Accident).
 Making daily task sheet and Daily progress report (DPR) and submitting to Site Engineer.

PROJECTS
2. Project :ROGC (J3), JAMNAGAR
 Client : RELIANCE INDUSTRIES LTD
 Company : Sinclus Consultancy Pvt.LTD
 Position : Mechanical Engineer
 Date : December2016 to 30th Sep-2017
RESPONSIBILITIES
 Worked in world largest Cracker ROGC Plant “Hydrocarbon Cracking Furnace-Area”
 Responsible for carrying out Isometric line checking and equipment nozzle position as per
mechanical data sheet for proper alignment and assembly erection.
 Responsible for carrying out walk through mechanical erection with client and contractor.
 Conducting Card-board testing and purging and flushing of line.
 Preparing documents and material for testing of line, valves/PSV and conducting of Hydro-
tests and leak test under the guideline of Area-Engineer.
 Responsible for line checking after hydro test to complete the post punch list prior to sign-off
the test packages before signing the completion of piping / mechanical static equipments.
 Ensure that all punch list items are resolved & handover is satisfactorily that there is no
prolongation of project.
 After Hydro-test and leak test checking files for Final Box-Up of individual line and verify the
test point is plugged & all the items are placed as per P&ID, updated isometric for smooth
operation.
 Following the checklist and closing all the punch point before commissioning of line, static
equipment and conducting the solo run.
 Coordination with scaffolding groups and preparation to make access for assembly the whole
lines at any elevation and to keep specific platform which can be used while commissioning.
 Line-up the system from equipment to equipment with trial flow of work and raw product trial
run-up with pipeline system.
 Commissioning of flow-line of loop system, overhead line, utility line, By-pass line according
the flow chart process under the guidelines.
 Preparing Daily reports (DPR), Weekly progress report (WPR), Fortnight Progress and Monthly
progress Report (MPR) and making analysis of planned schedule with actual progress and
submit reports to clients for review.
 Maintaining of Quality of works and safety as per given standard.
Shutdown Activities (2 Major Shutdown in ROGC) 
 Planning schedule of work as per priority from operation department and categorizing the job.
 Raising Permit for the work and line-up of work and team member for proper utilization of time
and man-power.
 Conducting daily TBT with all team members, explaining the hazard in work, safety measures,
and work important.
 Fabrication of temporary spools and mark-up spools to be erected as per modification from
clients department.
 Responsible for Piping Modification (if any) and pipe support installation in accordance with
schedule, Procedures, Specifications, Priorities and Availability of Construction Drawing.
 Participating in Steam Blowing/Steam flushing, Hydro jetting, Strainer & filter cleaning.
 Dropping of Control valves/Spool/Strainer and Special parts for Cleaning and Inspection &
Box-up after inspection done by CTS.
 Conducting post hydro-test of valves, PSV before again installation in the line system
 Raising MTO(s)/MIN for all materials required to additional materials for hydro-test/Filter
Element/RTJ/Mesh etc.

PROJECTS
3. Project : MDPE/Steel Pipe-line Erection
 Client : Mahanagar Gas Limited.
 Company : Paradise Services/ Bonace Engineering Pvt.LTD.
 Position : TPE-Project Engineer
 Date : 15th April-2015 to 31st May-2016/ 1st June-2016 to 21th December2016
RESPONSIBILITIES
 Understanding my scope of work and surveying of route for the Pipeline prior to the award of the
project to finalize the route and obstructions on the alignment of the pipeline and thereby finding out
the areas of which jurisdiction the alignment covers.
 Approaching to the concern authorities under whom the pipeline area covers to get the
permission for laying the pipeline.
 Planning and Execution to lay the MDPE Pipe for PNG supply from DRS to SR up to
consumer’s appliance.
 Walk-through of line with client executive before and after hydro-test for smooth operation
and commissioning work.
 Handling the responsibility of erection, testing and Pre-commissioning & commissioning of
MDPE/HDPE and steel pipelines ad handover to maintenance team
 Handling Responsibilities of underground N.G Pipe network upto charging and commissioning
work
 Specific layout drawing of Nalla-crossing and railway crossing as per site condition and taking
approval of drawing.
 Conducting Hydro Testing, pneumatic testing and nitrogen purging of Pipelines, SR sytem
 Monitoring the daily work activities of Sub-Contractor and updating Sub Contractor Progress
Reports to AIC
 Check the Bill of Material (Material Take Off) as per drawing for ensuring requirements is
realistically quantified as per scope and reconciliation of materials.
 Satisfactory identification of materials, proper protection of piping and fittings. Verify proper
size and schedule of pipe, rating of flanges, proper flange face and fittings.
 Planning, coordination and execution for shutdown, periodic maintenance and looping of
charged pipelines to cater the demand of CNG/PNG in city gas distribution network.
 Exposure to SAP module under the guideline of AIC and
 Clearing all punch point and maintaining work quality & safety as per standard.
KEY SKILLS

 PDMS Software-12.0.SP6
 AutoCAD drawing.
 P&ID and Isometric drawing & GE Drawing Reading.
 EXCEL and MS Office.
 Client Servicing & Safety Coordination
 Manpower Handling
Personal Details
Name : Shaikh Zahir Mohd Husain
Gender : Male
Social Status : Single
Date of Birth : 2nd April 1993
Nationality : Indian
Languages : English, Hindi, Marathi

Declaration
I solemnly declare that the information furnished above is true to best of my knowledge and belief.

Place: Mumbai
Date: SHAIKH ZAHIR

You might also like