SAUDI ARAMCO ID/PIEU -7-July-2018 -REV.2018.04.00(Standards Cutoff -April 30, 2018) Rev. 2018.04.

00 30-Apr-18
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Cross Country Above Ground Pipeline SATIP-L-450-03 3-Jul-18 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
CHECKLIST ASSIGNMENTS
ITEM QUALITY
PROJECT PHASE TASK / ACTIVITY and/or REMARKS
NO. RECORD LSTK
TEST RECORD
QA/QC PID
1.0 DOCUMENT REVIEW

Welding Procedure Specification


1.1
(WPS & PQR) Refer to SATIP-W-012-01

1.2 Welder Qualification/Certification


Refer to SATIP-W-012-01

1.3 Pressure Test Package Refer to SATIP-A-004-03

Positive Material Identification Program and


1.4 Testing Procedure for Pressure-Retaining SAIC-L-2004 SAIC-L-2004 RH RH
Alloy Materials

1.5 Thrust Boring Procedure SAIC-L-2109 SAIC-L-2109 RH RH


Flanged Joint Gasket Verification & Bolt
1.6 SAIC-L-2002 SAIC-L-2002 RH RH
Tightening Procedure
Procedure for Piping Material Traceability
1.7 SAIC-L-2110 SAIC-L-2110 RH RH
for Pipeline Installation
Approval by SAPMT. Interface with Plants shall utilize
1.8 Final Pipeline Route & Profile See Remarks See Remarks RH RH
tie-in point using Plant Survey & Benchmarks
For Review & Approval by SAPMT per
1.9 Pipe Handling Procedure See Remarks See Remarks RH RH
SAES-L-450, Para. 8.1

2.0 MATERIAL RECEIVING

Visual inspection & Material verification of S.Aramco to be notified for the arrival of the first batch
2.1 Pipe, Fittings, preformed bends (Cold & SAIC-L-2112 SAIC-L-2112 W W of delivered materials, then random inspection
Hot Bends) thereafter.

2.2 Valves Refer to SAES-L-108-001

3.0 INSTALLATION

3.1 Shop Fabrication Refer to SATIP-L-350-08

Pipeline Route, Profile & Right of Way


3.2 Refer to SATIP-L-450-01
Preparation

Saudi Aramco: Company General Use


SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Cross Country Above Ground Pipeline SATIP-L-450-03 3-Jul-18 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
CHECKLIST ASSIGNMENTS
ITEM QUALITY
PROJECT PHASE TASK / ACTIVITY and/or REMARKS
NO. RECORD LSTK
TEST RECORD
QA/QC PID

3.3 Stringing & Pipe Laying SAIC-L-2113 SAIC-L-2113 W S

Welding & associated Special Process, Refer to SATIP-W-012-01 & NDE SATIPs as they are
3.4
NDE, PWHT, HT, PMI, Repairs, etc referenced

3.5 Verification of NDE Application Refer to the SATIP for the applicable NDE Method

3.6 Field Bending SAIC-L-2114 SAIC-L-2114 H W

Pipeline Inspection prior to Welding of


3.7 SAIC-L-2115 SAIC-L-2115 H W
Temperature Tie-In Weld Joint

3.8 Above ground anchors & Pipe Supports SAIC-L-2116 SAIC-L-2116 W S

3.9 Concrete Placement Refer to SATIP-Q-001-02

3.10 Pile Driving Refer to Civil SATIP (to be determined)

3.11 Culvert Crossing SAIC-L-2118 SAIC-L-2118 W W

3.12 Camel/Road Crossing W W Refer to SATIP-Q-006-02 for Civil Requirements

3.13 Thrust Boring SAIC-L-2120 SAIC-L-2120 W W

3.14 Pipeline and Power Line Crossing SAIC-L-2121 SAIC-L-2121 W W See also SAES-B-064

3.15 Trenching & Backfilling Refer to SATIP-L-450-01

Thermal Expansion Relief Valve (for liquid


3.16 Refer to SATIP-J-600-01
service)
Pipeline Appurtenances Installation
3.17 SAIC-L-2122 SAIC-L-2122 W S
(Including Surge Relief)

Sectionalizing Valves & Jump-overs(Valve


3.18 SAIC-L-2123 SAIC-L-2123 W W
Stations)- (When required)

Sectionalizing Valve's electrical &


3.19 Refer to SATIP-J-700-01
Instrument requirements

Saudi Aramco: Company General Use


SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Cross Country Above Ground Pipeline SATIP-L-450-03 3-Jul-18 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
CHECKLIST ASSIGNMENTS
ITEM QUALITY
PROJECT PHASE TASK / ACTIVITY and/or REMARKS
NO. RECORD LSTK
TEST RECORD
QA/QC PID

3.20 Scraper trap Installation Refer to SATIP-L-420-01

Saudi Aramco: Company General Use


SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Cross Country Above Ground Pipeline SATIP-L-450-03 3-Jul-18 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
CHECKLIST ASSIGNMENTS
ITEM QUALITY
PROJECT PHASE TASK / ACTIVITY and/or REMARKS
NO. RECORD LSTK
TEST RECORD
QA/QC PID

3.21 Internal Coating of Field Welds Refer to applicable SATIP-H series

3.22 External Coating of Field Welds Refer to applicable SATIP-H series

3.23 Pre-Test Punchlisting-PIPELINES SAIC-L-2139 SAIC-L-2139 H H Use SATR-A-2007

Pipeline Internal
3.24 SAIC-L-2017 SAIC-L-2017 H W Use SATR-A-2008
Cleaning/Flushing/Scraping

Pressure Testing
3.25 a) Strength test Refer to SATIP-A-004-03
b) Tightness test

Refer also to SAES-L-108-001 for special lay-up


3.26 Lay-up SATR-A-2009 SATR-A-2009 H H
requirements for Pipeline Valves (13Cr or 400SS)

3.27 Cathodic Protection Refer to applicable SATIP-X series

Flange Joint Inspection (Gasket Verification Use SATR-L-2001 - See Note 1, General Notes, plus
3.28 SAIC-L-2014 SAIC-L-2014 H W
& Bolt Tightening) minimum of 10% for witness by S. Aramco

3.29 Pipeline Markers SAIC-L-2125 SAIC-L-2125 W S

Pipelines Leak Detection System (Except


3.30 flowlines, trunklines, and test lines) per SAIC-L-2127 SAIC-L-2127 W W
SAES-Z-003

4.0 PRE-COMMISSIONING

4.1 Caliper/Internal Gauging SAIC-L-2128 SAIC-L-2128 H H Use SATR-L-2009

4.2 Pipeline Re-instatement/Final Inspection SAIC-L-2129 SAIC-L-2129 H W Use SATR-A-2011

Final Inspection for Mech. Completion


4.3 SATR-A-6133 SATR-A-6133 H Use GI-2.710 & Applicable forms as agreed on
(MCC)
Refer to SATIP-A-004-05 for witnessing by
4.4 Tightness Testing
Commissioning Team

Saudi Aramco: Company General Use


SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Cross Country Above Ground Pipeline SATIP-L-450-03 3-Jul-18 MECHANICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
CHECKLIST ASSIGNMENTS
ITEM QUALITY
PROJECT PHASE TASK / ACTIVITY and/or REMARKS
NO. RECORD LSTK
TEST RECORD
QA/QC PID

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels
1 of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.

4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -7-July-2018 -REV.2018.04.00(Standards Cutoff -April 30, 2018)

Saudi Aramco: Company General Use


Rev. 2018.04.00

###

Saudi Aramco: Company General Use


30-Apr-18

Saudi Aramco: Company General Use


3-Jul-18 3-Jul-18

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -7-July-2018 -REV.2018.04.00(Standards Cutoff -April 30, 2018)

Saudi Aramco: Company General Use


Rev. 2018.04.00

###

Saudi Aramco: Company General Use


30-Apr-18

Saudi Aramco: Company General Use


3-Jul-18 3-Jul-18

Saudi Aramco: Company General Use