SAUDI ARAMCO ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018) Rev. 2018.04.

00 30-Apr-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Proprietary Fireproofing System & Procedure
SAIC-B-2001 3-Jul-18 MECH-
(Intumescent Epoxy Mastics & Lightweight Concretes)
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements

Proprietary Fireproofing Material System was approved by the Chief


Fire Prevention Engineer as follows: SAES-B-006,
A1 A) Qualifying documentation of fireproofing Para. 8.2.1
material was submitted to the Chief Fire Prevention Engineer for approval.

Proprietary fireproofing shall be approved by the Chief Fire Prevention


SAES-B-006,
Engineer. The material shall be applied in a manner approved by the
A2 Para. 8.2.1
fireproofing manufacturer and by the Manager, Inspection Department,
Dhahran.

Application of intumescent mastics or other approved proprietary


SAES-B-006,
A3 fireproofing shall be performed only by personnel trained and certified by
Para. 8.2.2
the material manufacturer.

Application shall be made in strict accordance with the manufacturer's


SAES-B-006,
A4 guidelines regarding ambient temperature, storage temperature,
Para. 8.2.3
materials, proportioning, and mixing.

Quality control procedures and hold points for inspection of surface


SAES-B-006,
A5 preparation and reinforcement shall be approved by the Manager,
Para. 8.2.4
Inspection Department, Dhahran.

Steel surfaces that are to be insulated per 8.3, fireproofed with


cementitious materials or covered with intumescent or other proprietary
fireproofing such as lightweight concrete, shall be coated in accordance SAES-B-006,
A6
with SAES-H-101, APCS-1B. Para. 8.4
The surface preparation and coating system specified shall be referenced
on all applicable construction drawings.

Procedure application for intumescent material specifies a minimum wet


thickness that will yield the required dry thickness (DFT).
SAES-B-006,
A7 (API PUBL 2218, Para. 7.3.3.1) Note: Procedure
Para 5.1 & 8.2.3
details extent & location of checks to ensure adequate DFT (evaporation
loss).
Procedure details top coating requirements & manner of application:
SAES-B-006,
A8 See Attachment 1 (Cementitious per Para. 8.5 and (Intumescent
Sect. 8.5 & 8.6
Epoxy per Para. 8.6)

Top-coating for proprietary fireproofing other than an intumescent epoxy


mastic shall be approved by the fireproofing manufacturer and the Chief
SAES-B-006,
A9 Fire Prevention Engineer. The coating shall be applied in a manner
Para. 8.6.4
approved by the fireproofing manufacturer and by the Manger, Inspection
Department, Dhahran.

Procedure Definition Section lists applicable SAES-B-006 & API


Publication 2218 applicable definitions:
A) Intumescent mastic: SAES-B-006,
A10 B) Fire-hazardous equipment: Section 4,
C) Fire-hazardous zone: Definitions
D) Other applicable definitions
(SAES-B-006, API 2218).
SAES-B-006,
A11 Figures for fireproofing selected scenarios Appendix 1

Saudi Aramco: Company General Use