SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Positive Material Identification (PMI) Log Sheet SATR-A-2013 30-Apr-13 MECH


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

MAINTAIN POTENTIALS PROJECT- SDGM-16" SWD LINE 11-19000-9181 Br. CAT INT'L CO.
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
N/A N/A D29
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
N/A N/A
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
N/A N/A SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-L-350-01 2.8
SAUDI ARAMCO INSPECTION LEVEL
S
CONTRACTOR INSPECTION LEVEL
H
YES
NOTES: Per SAES-A-206, Para. 12.1.2 - The log shall identify each component and weld corresponding to an individual equipment item or piping
spool and shall include the equipment or spool number and purchase order number. To supplement this log, where applicable (per SAES-A-206, Para.
12.2.3), the field Fabricator shall prepare a detailed PMI map of the pressured equipment being fabricated. The map shall show the alloy material
specification of each alloy component and the extent of PMI required per this standard.

PMI Report No. &


Log No. Plant / P.O. # Equipment / Line # Item Description Remarks
Date

REMARKS:

REFERENCE DOCUMENTS:
1. SAES-A-206 - Positive Material Identification (30 April 2011)

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Name, Title, Department,
Company, Initials and Date: FADI Name, Initials and Date:

QC Inspector PID Representative


Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
DANIEL / SHAHID KHASIM
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date: MANOJ Initials and Date:
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Positive Material Identification (PMI) Log Sheet SATR-A-2013 30-Apr-13 MECH


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

MAINTAIN POTENTIALS PROJECT- SDGM-16" SWD LINE 11-19000-9181 Br. CAT INT'L CO.
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
N/A N/A D29
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
N/A N/A
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
N/A N/A SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-L-350-01 2.8
SAUDI ARAMCO INSPECTION LEVEL
S
CONTRACTOR INSPECTION LEVEL
H
YES
NOTES: Per SAES-A-206, Para. 12.1.2 - The log shall identify each component and weld corresponding to an individual equipment item or piping
spool and shall include the equipment or spool number and purchase order number. To supplement this log, where applicable (per SAES-A-206, Para.
12.2.3), the field Fabricator shall prepare a detailed PMI map of the pressured equipment being fabricated. The map shall show the alloy material
specification of each alloy component and the extent of PMI required per this standard.

PMI Report No. &


Log No. Plant / P.O. # Equipment / Line # Item Description Remarks
Date

REMARKS:

REFERENCE DOCUMENTS:
1. SAES-A-206 - Positive Material Identification (30 April 2011)
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED