SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.

Rev. 2018.03.00 31-Mar-18


SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Welding Rod Oven Calibration/Verification Report SATR-W-2009 01-Jan-18 WELD-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Tanajib Gas Plant Project - ISF Package 13 10-09003-0006 RTCC


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

WELDING ROD OVEN TEMPERATURE CALIBRATION/VERIFICATION


Electrode Oven/Quiver
A
No. UNIT # ____ UNIT # ____ UNIT # ____ UNIT # ____
A1 Brand/Make:

A2 Serial Number

Thermometer Thermometer
B THERMOSTAT SETTING Thermometer Reading Thermometer Reading
Reading Reading

B1 120°C

B2 430°C

65°C or as per
B3 manufturer
recommendation

C RESULT

Approved for
C1
Electrode storage

Approved for
C2
Electrode drying

Approved as Portable
C3
Oven (at storeroom)

Approved as Quiver
C4
(at worksite)

D Re-Calibration Due Date

REMARKS:
1. Temperature Requirements:
a. 120°C - Minimum temperature for Electrode Storage Oven & Portable Storage Oven (quiver at
store room).
b. 430°C - Maximum temperature for Drying/Baking Oven
c. 65°C or as per Manufacturer's Recommendation - Minimum for Welder's Portable Electrode Storage at
worksite

REFERENCE DOCUMENTS: 1. SAES-W-010, Welding Requirements for Pressure Vessels, (1 January 2018)
2. SAES-W-011, Welding Requirements for On-Plot Piping, (1 January 2018)
3. SAES-W-012, Welding Requirements for Pipelines, (1 January 2018)
4. SAES-W-014, Weld Overlays and Welding of Clad Materials , (29 September 2016)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Welding Rod Oven Calibration/Verification Report SATR-W-2009 01-Jan-18 WELD-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Tanajib Gas Plant Project - ISF Package 13 10-09003-0006 RTCC


3. SAES-W-016, Welding of Special Corrosion-Resistant Materials, (10 November 2014)
4. SAES-W-017, Welding Requirements for API Tanks, (1 January 2018)

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Test Performed Successfully and Results are Acceptable: T&I Work
Name, Title, Department, QC Record Reviewed
Witnessed Verified
Company, Initials and Name, Initials and Date:
Date:

QC Inspector PID Representative


T&I Work
Witnessed Test Work / Rework May Proceed QC Record Reviewed
Witnessed Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Work
QC Record Reviewed
Name, Organization, Witnessed Verified
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use