SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08

SATR NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO TEST REPORT
Temperature Tie-In Welding Report SATR-W-2014 30-Apr-13 WELD-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
MASTER GAS SYSTEM EXPANSION PROJECT. 10-01282 CAT INT'L
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
N/A N/A N/A K94
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
VA-157489- 0 N/A
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-W-012-01 3.8
SAUDI ARAMCO INSPECTION LEVEL
W
CONTRACTOR INSPECTION LEVEL
H
YES
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
TEST PROCEDURE & CHECKLIST: A temperature tie-in weld is a weld that connects one of the following:
• Two pipeline strings together
A • An existing pipeline to a pipeline under construction
• A pipeline to an anchor
• Pipeline sections to an intermediate mainline valve that is being inserted

Mean pipe temperature is recorded as the actual tie-in temperature for SAES-L-450,
A1
pipeline. Para. 15.7
Contact temperature measuring device is shielded from direct sun to SAES-L-450,
A2
prevent an inaccurate reading (as applicable). Para. 15.3
Construction Engineer has determined the highest practical tie-in SAES-L-450,
A3 temperature for each tie-in weld. Hold Point: Readings of mean pipe Para. 15.2 &
temperature were taken for three days prior to tie-in. Para. 15.7
Actual tie-in temperature reading is the average of two readings, one at SAES-L-450,
A4
the top and one at the bottom of the pipe. Para. 15.3
SAES-L-450,
A5 Actual tie-in temperature is within range stated in the Project Specs.
Para. 15.2
The final weld shall be made at or above the mean pipe temperature for SAES-L-450,
A6
the three days prior to the final tie-in. Para. 15.7
B TEST EQUIPMENT AND MATERIALS:
Digital contact pyrometer Manufacturer: ______________________ ; Model: ___________________ ; Serial No: __________________

Digital contact pyrometer Calibration No:___________________ Date of calibration: _______________ Valid until: ______________

C TEST RESULTS:
Date:__________________ ; Time: ___________________ AM / PM; Ambient temp:________________ 0 C; Design tie-in temperature: _______________ 0 C;

Mean temperature:______________________ 0 C; (Day 1 temp: ___________ 0 C; Day 2 temp: ____________ 0 C; Day 3 temp: ____________ 0 C;

Highest practical tie-in temperature for each tie-in weld: ___________ 0 C; (Construction Engineer shall specify).

Temp. at top of pipe ______ 0 C;


Conclusion:
Actual tie-in temp. _______ 0 C; (average of top & PASS = Welding may proceed
bottom of pipe temperatures) FAIL = Welding may not proceed

Temp. at bottom of pipe _____ 0 C;

REFERENCE DOCUMENTS: 1. SAES-L-450, Construction of On-Land and Near-Shore Pipelines, (30 September, 2003)
2. SAES-W-012, Welding Requirements for Pipelines, (31 December, 2002)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: ARIF Name, Initials and Date:
GEOVANNI
QC Inspector PID Representative
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
ARUL TARIQ KHAN
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date: D.VARADHA RAJAN Initials and Date:

Page 1 of 2
Quality Record Approved:
Name, Organization,
Name, Sign and Date: D.VARADHA RAJAN Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2