Mean pipe temperature is recorded as the actual tie-in temperature for SAES-L-450,
A1
pipeline. Para. 15.7
Contact temperature measuring device is shielded from direct sun to SAES-L-450,
A2
prevent an inaccurate reading (as applicable). Para. 15.3
Construction Engineer has determined the highest practical tie-in SAES-L-450,
A3 temperature for each tie-in weld. Hold Point: Readings of mean pipe Para. 15.2 &
temperature were taken for three days prior to tie-in. Para. 15.7
Actual tie-in temperature reading is the average of two readings, one at SAES-L-450,
A4
the top and one at the bottom of the pipe. Para. 15.3
SAES-L-450,
A5 Actual tie-in temperature is within range stated in the Project Specs.
Para. 15.2
The final weld shall be made at or above the mean pipe temperature for SAES-L-450,
A6
the three days prior to the final tie-in. Para. 15.7
B TEST EQUIPMENT AND MATERIALS:
Digital contact pyrometer Manufacturer: ______________________ ; Model: ___________________ ; Serial No: __________________
Digital contact pyrometer Calibration No:___________________ Date of calibration: _______________ Valid until: ______________
C TEST RESULTS:
Date:__________________ ; Time: ___________________ AM / PM; Ambient temp:________________ 0 C; Design tie-in temperature: _______________ 0 C;
Mean temperature:______________________ 0 C; (Day 1 temp: ___________ 0 C; Day 2 temp: ____________ 0 C; Day 3 temp: ____________ 0 C;
Highest practical tie-in temperature for each tie-in weld: ___________ 0 C; (Construction Engineer shall specify).
REFERENCE DOCUMENTS: 1. SAES-L-450, Construction of On-Land and Near-Shore Pipelines, (30 September, 2003)
2. SAES-W-012, Welding Requirements for Pipelines, (31 December, 2002)
Page 1 of 2
Quality Record Approved:
Name, Organization,
Name, Sign and Date: D.VARADHA RAJAN Initials and Date:
Page 2 of 2