You are on page 1of 2

SAUDI ARAMCO ID/PIEU -22- Jan-2018 - REV. 2017.12.00 (Standards Cutoff -December 31, 2017) Rev. 2017.12.

00 31-Dec-17
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Positive Material Identification (PMI) Log Sheet SATR-A-2013 22-Jan-18 MECH
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
N/A N/A SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

NOTES: Per SAES-A-206, Para. 12.1.2 - The log shall identify each component and weld corresponding to an individual equipment item or piping
spool and shall include the equipment or spool number and purchase order number. To supplement this log, where applicable (per SAES-A-206, Para.
12.2.3), the field Fabricator shall prepare a detailed PMI map of the pressured equipment being fabricated. The map shall show the alloy material
specification of each alloy component and the extent of PMI required per this standard.

PMI Report No. &


Log No. Plant / P.O. # Equipment / Line # Item Description Remarks
Date

REMARKS:

REFERENCE DOCUMENTS:
1. SAES-A-206 - Positive Material Identification (5 May 2016)

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Name, Title, Department,
Name, Initials and Date:
Company, Initials and Date:

QC Inspector PID Representative


Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU -22- Jan-2018 - REV. 2017.12.00 (Standards Cutoff -December 31, 2017) Rev. 2017.12.00 31-Dec-17
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Positive Material Identification (PMI) Log Sheet SATR-A-2013 22-Jan-18 MECH
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
N/A N/A SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

NOTES: Per SAES-A-206, Para. 12.1.2 - The log shall identify each component and weld corresponding to an individual equipment item or piping
spool and shall include the equipment or spool number and purchase order number. To supplement this log, where applicable (per SAES-A-206, Para.
12.2.3), the field Fabricator shall prepare a detailed PMI map of the pressured equipment being fabricated. The map shall show the alloy material
specification of each alloy component and the extent of PMI required per this standard.

PMI Report No. &


Log No. Plant / P.O. # Equipment / Line # Item Description Remarks
Date

REMARKS:

REFERENCE DOCUMENTS:
1. SAES-A-206 - Positive Material Identification (5 May 2016)
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use

You might also like