Proposed Position Design Director

Name of Firm Rajinder Singh Negi


13
Years of
Name of Expert Shivendra Kumar Experience
Contact Details Current Residential Address F503 Prakriti Appt, Sector -6, Dwarka
Telephone No. +91 9818238508, 8383993284
Email Address shivennupoor@gmail.com
Date of Birth 5th March 1984 Citizenship Indian
Education Year Degree
2009 M.S./M. Tech Civil Engineering (Structural Engineering), Indian Institute of Technology
(IIT), Roorkee, India
2007 B.S./ Bachelor of Engineering (Civil Engineering), DR. MGR University, Madras, India
Membership in Professional Associations and Publications:
 Life Time membership of International Society of Rock Mass and Testing, Structural Engineering Forum
of India
 Life Time Membership of Indian Road Congress (IRC)
 Life time Member of ICOLD

Other Training
 Four months training in Survey using EDM in Swastik Engineers Bhubaneswar Orissa, India (Aug 2006).
 Two Month Training with MIDAS software on design of various types of Bridges.
Countries of Work Experience India, Bhutan, Rwanda, Nepal
Languages
Language Speaking Reading Writing
English Good Good Good
Hindi Good Good Good
Employment Record
From To Employer Position Held
2018 Present Rajinder Singh Negi Design Director
2017 2018 Geo -Consult India Pvt Ltd Structural Engineer
AF Consult India Pvt Ltd, Noida, India
2016 2017 Senior Geotechnical & Structures Engineer
(subsidiary of AF-Consult Switzerland Ltd)
SNC-LAVALIN Engineering India Pvt Ltd,
2010 2016 Deputy Manager-Civil Design
Delhi, India
2009 2010 SMEC India Pvt Ltd, Gurgaon, India Assistant Engineer
Detailed Tasks Assigned:
T1.
Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
1. Project Name Detailed design of two water conveying Tunnels of length 9 kM and 2 kM in Nepal.
Month & Year Jul 2018 – Aug 2018 Location Nepal
Eptisa Servicios De Ingenieria SL,
Client Position Held Structural Engineer
Kathmandu
Main project features:
Activities Performed: Detail engineering level design of tunnel, it involves of preparation of Geological interpretation
report. Preparation of Design Basis Report, Design of Tunnel Portal Excavations, Design of Tunnel Rock Support
Design, Design of Tunnel Lining, Preparation of Durability Assessment Report, Preparation of all construction
drawings and helping contractor to execute at site. Preparation of Instrumentation and monitoring report.
Estimation of Bill of quantity.

2. Project Name Four Laning of Pandoh Takoli NH21 Road


Month & Year Sep 2018 - Ongoing Location India
Client AFCONS Infrastructure Ltd, Mumbai Position Held Structural Engineer
Main project features:
Activities Performed: Design of open Cut slope in different geological conditions of formation along Pandoh
Takoli NH21 road cutting
3. Project Name Chamoli to Paini NH Road (Detail Engineering) 38 kM
Month & Year May 2018 - Ongoing Location State of Uttarakhand, India
Client NKG Infrastructures Ltd (NHIDCL) Position Held Structural Engineer
Main project features: Detailed Design of Road works Work for km 430 to km 468.
Activities Performed: Design of Road, Culvert, VUP, Design of Truss Bridge(80m), Design of Steel Composite
Bridge (50m), Design of RCC Bridge of Span 20m, Design of PSC Bridge of Span 35 m. Design of
Substructures, Design of Culverts of different size.
4. Project Name Malari to Rudraprayg NH Road (Detail Engineering) 30 kM
Month & Year May 2018 - Ongoing Location State of Uttarakhand
Client RCC Developers Ltd (NHIDCL) Position Held Structural Engineer
Main project features: Detailed Design Work for km 368 to km 398
Activities Performed: Design of Road, Culvert, VUP, Design of Truss Bridge(121m), Design of Steel
Composite Bridge (50m), Design of RCC Bridge of Span 20m, Design of PSC Bridge of Span 35 m. Design
of Substructures, Design of Culverts of different size.
5. Project Name CTP14-DFCC (Detailed Project report)
Month & Year Dec 2017 – Jul 2018 Location State of HARYANA
Client Larsen & Toubro Position Held Senior Geotechnical Engineer
Main project features: Double Line BG Tunnel 35 t km 1.2 km long -for DFCC
Activities Performed: Design of Tunnel Inner Lining using EURO CODE, Design of Cut and Cover and Ramp
portion, Design of temporary support system for cut and cover excavation system, Design of Tunnel rock
support system Using PHASE2.
6. Project Name NFR T12 (Detailed Project report)
Month & Year June 2017 - Ongoing Location State of Manipur, India
Client North Frontier Railway Position Held Senior Geotechnical Engineer
Main project features: Single Line BG Tunnel 12 t km 8.656/106.63 to km 19.39/117.371 in between TUPUL
-IMPHAL relating to construction of NEW BG line from JIRIBAM-IMPHAL NF RAILWAY
CONSTRUCTION (TWO PACKET SYSTEM).
Activities Performed: Design of Tunnel Inner Lining, , Design of temporary support system for cut and cover
excavation system, Design of Tunnel rock support system Using PHASE2
7. Project Name Ahmedabad Metro (Detailed Engineering)
Month & Year June 2017 – Jul 2018 Location State of Gujarat, India
Client AFCONS Infrastructure Ltd Position Held Structural Engineer
Main project features: Detailed Engineering of TBM Bored Tunnel along with Cross Passage and twin UG
Stations along with associated C&C box & Ramps
Activities Performed: Design of Precast Segment Lining using Curtis Method and validation by FEM modelling in RS2.
Calculation of TBM Face Pressure to be applied during TBM Mining along alignment. Building damage assessment
during TBM Mining along TBM alignment, Structural Assessment of Critical Buildings by STAAD Pro (3D Modelling)
due to TBM induced movement.
Design of Sacrificial segment where TBM will be drive through UG Stations.
8. Project Name Lucknow Metro (Detailed Engineering)
Month & Year June 2017 – Jul 2018 Location State of Uttar Pradesh, India
Client Gulemark-TATA Projects JV Position Held Structural Engineer
Main project features: Detailed Engineering of TBM Bored Tunnel along with Cross Passage and three UG
Stations along with associated C&C box & Ramps
Activities Performed: Simulation of excavation sequence of C&C box close to Heritage Building using mix of
Dwall & Contiguous Pile. Full Geotechnical calculations done using RS2 software & simulation of 3D
modelling by STAAD Pro to access ground movement & structural stability during excavation. Full support
of structural arrangement to counteract flotation during pass of TBM under Haider Canal bed at significant
low ground cover.
9. Project Name SHIRADI GHAT (Detailed Project report)
Month & Year June 2017 – June 2018 Location State of Karnataka, India
Public Work Port and Inland Water
Client Position Held Structural Engineer
Transport Department
Main project features: Detailed Project report preparation for km 238.30 to k 261.450. Design of Tunnel,
Multi-Span Bridge Viaduct between this chainage
Activities Performed: Design of Viaduct 12x65 m, Design of Pier of Height up to 120 m, Design of Pile Footing
System, Design of Inner Lining of Tunnel. Design of tunnel support system using Phase2
10. Project Name Ramban Banihal - Detail Engineering
Month & Year August 2016 – May 2017 Location Jammu & Kashmir, India
Hindustan Construction Company Senior Engineer Geotechnical &
Client Position Held
Limited Structures
Main project features: Four Laning of Ramban to Banihal Section of NH-1A (Now NH-44), from km 151.00 To km 187.00 on EPC
mode in the State of Jammu & Kashmir under NHDP Phase-II, The project stretch is a part of NH-1A (now NH-44) and lies in the
state of Jammu & Kashmir, India. The project corridor starts at existing km 151 (Ramban Town) and ends at existing km 187
(near Banihal Town
Activities Performed: Responsible for design of support system for portal excavation, design of rock support
systems of transportation tunnel by Phase2 analysis, structural design of lining of tunnel and structural
design of portals.Design of various minor and Major Bridges
11. Project Name Nikachu H. EP (Bhutan) - Detail Engineering
Jammu & Kashmir, India
Month & Year August 2016 – May 2017 Location

Senior Structural and Geotechnical


Hindustan Construction Company
Client Position Held Engineer
Limited
Main project features:Diversion structure-45m high barrage. Water conductor system comprises of headrace
tunnel (4.5 m dia modified horse shoe shaped, 15 km long), surge shaft (13 m dia circular, 88 m high),
pressure shaft (3.4 m dia circular and 600 m long) and surface powerhouse (50 m long) with installed
capacity of 121 MW (2 x 60.5 MW).
Activities Performed: Design of Support system of Portal Excavation using PHASE2, Design of Support
system for Dam Excavation, Design of Tunnel Lining, Design of Inlet Structures.
12. Project Name Gongri Hydro Electric Project (144 MW) - Detail Engineering
Month & Year January 2013 – January 2016 Location Arunachal Pradesh, India
Client Patel Engineering India Pvt. Ltd. Position Held Deputy Manager (Civil Design)
Main project features: Diversion structure-21 m high barrage. Water conductor system comprises of headrace
tunnel (5.8 m dia modified horse shoe shaped, 7.5 km long), surge shaft (13 m dia circular, 88 m high),
pressure shaft (4.4 m dia circular and 600 m long) and surface powerhouse (50 m long) with installed
capacity of 144 MW (2 x 72 MW).
Activities Performed: Responsible for design of support system using pile and prestressed anchor for barrage
excavation, design of slope protection work for powerhouse slope, design of adit portals, design of rock
support systems of adits, headrace tunnel and surge shaft by empirical & Phase2 analysis, hydraulics design
of barrage and intake, structural design of lining of headrace tunnel and design of cut & cover duct, structural
design of barrage design of powerhouse superstructure and substructure components, design of bridges over
barrage.
13. Project Name Etalin Hydro Electric Project (3,097 MW) - Tender Engineering
Month & Year May, 2013 – Dec, 2015 Location Arunachal Pradesh, India
Client Jindal Steel and Power Limited Position Held Deputy Manager (Civil Design)
Main project features: Diversion structures - two nos. concrete gravity dam, 101.5 m & 80 m high. Water
conductor system comprises of two nos. headrace tunnel (11.3 m dia circular, 10.7 km long and 9.7 m dia
circular and 13 km long), two nos. surge shaft (26 m dia circular, 51 m high and 21 m dia circular and 137
m high), 10 nos. pressure shaft (5.6 m dia circular and 512 m long) and underground powerhouse (352 m
long) with installed capacity of 3,097 MW (10 x 307 MW).
Activities Performed: Responsible for dynamic analysis of Dri Limb & Tangon Limb Dam; Lining design of
surge shaft, headrace tunnel, diversion tunnel; Rock support design of diversion tunnel, head race tunnel;
Slope stability analysis of dam excavation and intake excavation; Rock support design for adit and feeder
tunnel; Slope stability analysis of open excavation of surge shaft; and Structural design of dam pier, trunion
beam, gallery & breast wall.
14. Project Name Delhi Metro Rail-CC30 - Detail Engineering
Month & Year Jan 2013 – July 2015 Location Delhi, India
Hindustan Construction Company
Client Position Held Deputy Manager (Civil Design)
Ltd
Main project features:Contract CC-30, consists of construction of the twin tunnel between Shalimar Bagh and
Netaji Subhash Place station by shield TBM, twin box tunnel and Underground ramp on Shakurpur side of
Netaji Subhash Place Station. The four major types of structure in Contract-CC30 are bored tunnel, cut and
cover section, station buildings and ramp. This document discusses the stability analysis of Cut and Cover
Section and ramp section coming at Netaji Subhash Place station. The length of cut and cover portion is
about 219.764 m (i.e. from chainage, CH 5215.363 m to chainage, CH 5435.127m as measured along the
upline). The length of ramp section is about 196.163 m (i.e. from chainage, CH 5435.127 m to chainage,
CH 5631.290 m as measured along the upline).
Activities Performed: Responsible for stability analysis of Shalimar Bagh metro Station; Structural design of
raft slab of Shalimar Bagh metro station; Design of CBP piles for excavation of metro station; Slope stability
analysis of Netaji Subhash Place metro station; Structural design of concourse & platform slab; and
Structural design of Entrance & Exit Shaft.
15. Project Name Kutehr Hydro Electric Project (240 MW) - Detail Engineering
Month & Year Jun 2010 – Oct, 2012 Location Himachal Pradesh, India
Client Jindal Steel and Work Pvt. Ltd Position Held Assistant Manager (Civil Design)
Main project features: Diversion structure- 27 m high barrage. Water conductor system comprises of headrace
tunnel (6.2 m dia modified horse shoe shaped, 15 km long), surge shaft (15 m dia circular, 88 m high),
pressure shaft (4.35 m dia circular and 317 m long) and underground powerhouse (90 m long) with installed
capacity of 240 MW (3 x 80 MW).
Activities Performed: Responsible for technical and financial evaluation of bids, cost estimation, design of
project roads & adit portals, design of rock support systems of adits, headrace tunnel, surge shaft and
powerhouse cavern by empirical & Phase2 analysis, hydraulics design of barrage & intake, structural design
of lining of headrace tunnel, design of cut & cover duct, structural design of barrage, design of powerhouse
superstructure and substructure components and design of bridges over barrage.
16. Project Name Etalin Hydro Electric Project (3,097 MW) - Detail Project Report
May, 2010 – Sept, 2012
Month & Year Location Arunachal Pradesh, India
Client Jindal Steel and Power Ltd Position Held Assistant Manager (Civil Design)
Main project features: Diversion structures - twonos. concrete gravity dam, 101.5 m & 80 m high. Water
conductor system comprises of two nos. headrace tunnel (11.3 m dia circular, 10.7 km long and 9.7 m dia
circular and 13 km long), two nos. surge shaft (26 m dia circular, 51 m high and 21 m dia circular and 137
m high), 10 nos. pressure shaft (5.6 m dia circular and 512 m long) and underground powerhouse (352 m
long) with installed capacity of 3,097 MW (10 x 307 MW).
Activities Performed: Responsible for site supervision of survey, hydrological studies and geological
investigation of dam, surge shaft & powerhouse; Preparation of report on construction methodology and
equipment planning of each components of project; Cost estimation; and Financial evaluation.
17. Project Name TATO-II Hydro Electric Project (700 MW) – Detail Project Report
Month & Year May, 2010 - Dec, 2011 Location Arunachal Pradesh, India
Reliance Power and
Client Position Held Assistant Manager (Civil Design)
Infrastructure Ltd
Main project features: Diversion structure- concrete gravity dam 155 m high. Water conductor comprises of
headrace tunnel (10.4 m dia circular, 3.7 Km long), surge shaft (31.5 m dia circular, 47 m high), 4 nos.
pressure shaft (4.5 m dia circular and 311 m long) and underground powerhouse (164 m long) with installed
capacity of 700 MW (4 x 175 MW).
Activities Performed: Responsible for Estimation of bill of quantities; Infrastructural planning for construction
work; Preparation of construction methodology & equipment planning report; and Preparation of master
plan for construction works.
18. Project Name TATO-II Hydro Electric Project (700 MW) - Tender Engineering
Month & Year Jul, 2011 – Dec, 2013 Location Arunachal Pradesh, India
Reliance Power and
Client Position Held Assistant Manager (Civil Design)
Infrastructure Ltd
Main project features: Diversion structure - concrete gravity dam 155 m high. Water conductor system
comprises of headrace tunnel (10.4 m dia circular, 3.7 km long), surge shaft (31.5 m dia circular, 47 m high),
4 nos. pressure shaft (4.5 m dia circular and 311 m long) and underground powerhouse (164 m long) with
installed capacity of 700 MW (4 x 175 MW).
Activities Performed: Responsible for Dynamic analysis of dam; Lining design of surge shaft, headrace tunnel,
& diversion tunnel; Rock support design of diversion tunnel & head race tunnel; Slope stability analysis of
dam excavation & intake excavation; Rock support design for adit & feeder tunnel; Rock support design of
powerhouse complex & surge shaft.
19. Project Name Naying Hydro Electric Project (1,000 MW) – Detail Project Report
Month & Year May, 2010 – Sept, 2012 Location Arunachal Pradesh, India
Client DSC Construction Private Ltd Position Held Assistant Manager (Civil Design)
Main project features: Diversion structure - concrete gravity dam 138 m high. Water conductor system
comprises of headrace tunnel (10.6 m dia circular, 7 km long), surge shaft (28 m dia circular, 89.1 m high),
4 nos. of pressure shaft (4.5 m dia circular and 380 m long) and underground powerhouse (181 m long) with
installed capacity of 1,000 MW (4 x 250 MW).
Activities Performed: Responsible for preparation of reports on construction methodology & equipment
planning of each components of project, estimation of bill of quantities, infrastructural planning, cost
estimation and financial evaluation of project.
20. Project Name Kameng Hydro Electric Project (600 MW) – Detail Engineering
Month & Year Jul, 2009 – May, 2010 Location Arunachal Pradesh, India
Northern Eastern Power
Client Corporation of India Private Position Held Assistant Engineer
Limited
Main project features: Diversion structures - two numbers of concrete gravity dam, 75 m and 27 m high. Water
conductor system comprises of headrace tunnel (6.7 m dia modified horse shoe, 14.5 km long), surge shaft
(13 m dia circular, 50 m high), 2 nos. of pressure shaft (4.5 m dia circular & 400 m long) and underground
powerhouse (109 m long) with installed capacity of 600 MW (4 x 150 MW).
Activities Performed: Responsible for design of RCC, T-beam bridge at Tenga dam, structural design of valve
house and tailrace channel, design of draft tube of powerhouse and stability analysis of Tenga dam.
21. Project Name Srinagar Hydro Electric Project (330 MW) – Detail Engineering
Month & Year Jul, 2009 – May, 2010 Location Uttarakhand, India
GVK Power and Energy India
Client Position Held Assistant Engineer
Ltd
Main project features: Diversion structure - 95 m high concrete gravity dam; 2 nos. circular headrace
tunnel - 1.01 km & 1.14 km long, 9 m dia; and surface powerhouse with installed capacity of 330 MW (4 x
82.5 MW).
Activities Performed: Responsible for design of bridge over spillway, structural design of power channel and
bridges over power channel, stability analysis of powerhouse and concrete gravity dam.
22. Project Name Nayaborongo Hydro Electric Project (28 MW) – Detail Engineering
Month & Year Aug, 2009 – May, 2010 Location Rwanda
Angelique International
Client Position Held Assistant Engineer
India Private Limited
Main project features: Diversion structure – 41 m high concrete gravity dam; headrace tunnel - 4 m dia, 1.2
km long D shaped and surface powerhouse with installed capacity of 28 MW (2 x 14 MW).
Activities Performed: Responsible for structural design of steel bridge of span 21 m over Nayaborongo river,
stability analysis of powerhouse, design of superstructure of power house, stability analysis of concrete
gravity dam and design of intake portal.