Professional Documents
Culture Documents
Tanmoy Das
(Project Engineer)
Tanmoy Das
Tanmoy Das has 9 years of experience
in Geometrical design of Highway.. He
has also actively involved in DPR &
Pre-bid service for a number of
challenging projects in India.,
Myanmar,Cameroon,Tanzania,Kenya
as Highway cum Pavement Engineer.
Page 1 of 4
Transportation
Tanmoy Das
(Project Engineer)
Efficiency of Freight Movement Date of Birth: 24th Jan 1988 Client: Public Works Department,
in India (Lot-1/Madhya Government of Karnataka.
Pradesh/Package-6), REWA- Role: As a Sr. Manager (Pavement
BEOHARI-TETKA-SHAHDOL cum Highway Design Engineer)
(SH-9). Scope: Main scope of works is
checking and validating the survey
Direct Link: Duration: Feb. 2012 to October, 2018 data for its adequacy and
http://irc.org.in/ENU/Pages/IRC Client: MPRDC consistency, Incorporating the
Role: As a Sr. Manager (Pavement validated data into the design software,
Technical Paper cum Highway Design Engineer) Preparation of Digital Terrain Model
Scope: Main scope of works is (DTM), Designing horizontal and
Co-Author of Paper on checking and validating the survey vertical alignments, design of
“Perpetual Pavement – A Boon data for its adequacy and interchange, Checking cross sections,
for the Indian Roads” consistency, Incorporating the generate the drawings scripts (plan,
http://www.sciencedirect.com/sc validated data into the design software, profile and cross sections), hand it
ience/article/pii/ Preparation of Digital Terrain Model over to the draftsmen for editing in
(DTM), Designing horizontal and AutoCAD, To assist in finalizing
Training/Workshops vertical alignments, design of drawings, To prepare data for area
interchange, Checking cross sections, and volume calculations.
Training on “Design, generate the drawings scripts (plan,
Construction and Maintenance profile and cross sections), hand it Project: Consultancy Services
of Flexible Pavements”, CRRI, over to the draftsmen for editing in for Project Management
India. One Day Seminar on AutoCAD, To assist in finalizing including Preparation of
“Cement Concrete Pavement drawings, To prepare data for area Feasibility Study/ Detailed
and White Topping”, CRRI, India and volume calculations. Project Report of Selected
Road Stretches for NH
Three Days Training Course on Project: Design, Construction, Connectivity to Backward
“Design & Construction of Earth Finance, Operation and Area/Religious/ Tourist Places
& Rock fill, Concrete and CFRD Maintenance of Four-Laning of (BRT) under Bharat Mala
Dams” in CBIP, New Delhi, India. Narketpally- Addanki- Scheme for Sambalpur-Bamra-
Training Course on Medarmetla road (SH-2) from km Gariamal (98 km) and
“Shortcreting& Grouting” in 0.000 to Km 212.500 in the state Karamdihi-Talsara-Bagabahar-
CBIP, New Delhi, India. of Andhra Pradesh under Public Ludeg (92 km) out of which 37
Private Partnership on DBFOT km is within Odisha and
One month training in “Teesta (Toll) basis. remaining 55km in
Low Dam Project-III” completed Duration: Feb. 2012 to October, 2018 Chhattisgarh) in the State of
under NHPC. Client: Andhra Pradesh Road Odisha/Chhattisgarh (Package
Development Corporation No.- B/17)
Attended a Training on “ISO Role: As a Sr. Manager (Pavement Duration: Feb. 2012 to October, 2018
Awareness for internal Auditors” cum Highway Design Engineer) Client: Ministry of Road Transport
, ICT New Delhi, India. Scope: Main scope of works is and Highways
checking and validating the survey Role: As a Sr. Manager (Pavement
Skills data for its adequacy and cum Highway Design Engineer)
Operating Systems: Windows, consistency, Incorporating the Scope: Main scope of works is
Mac OS validated data into the design software, checking and validating the survey
Software: MX Road, Circly, Preparation of Digital Terrain Model data for its adequacy and
IITRIGID, IIT Pave, KGB BACK, (DTM), Designing horizontal and consistency, Incorporating the
AutoCAD, MS Office, F Pave. vertical alignment. validated data into the design software,
Project: Consultancy Services for Preparation of Digital Terrain Model
Languages: English, Hindi, Detailed Project Report cum (DTM), Designing horizontal and
Bengali Transaction Advisory Services for vertical alignments, design of
Karnataka State Highway interchange, Checking cross sections,
Improvement Project-lll (KSHIP-lll) generate the drawings scripts (plan,
Citizenship: Indian Duration: Feb. 2012 to October, 2018 profile and cross sections), hand it
over to the draftsmen for editing in
Page 2 of 4
Transportation
Tanmoy Das
(Project Engineer)
AutoCAD, To assist in finalizing Project: Consultancy Services Project: Post Tender Consultancy
drawings, To prepare data for area for Project Management Services for Six Laning of
and volume calculations. Phase-I including Vijayawada to Gundugolanu
Preparation of Detailed Project Section on NH-5 (Km. 1076.480 to
Project: Greater Imphal Ring Road, Report for Up-gradation of Km. 1022.500) in the States of
Manipur Junction with NH-41-Bhimasar- Andhra Pradesh under NHDP
Duration: Feb. 2012 to October, 2018 Anjar, Bhuj, Khavda- Phase V through PPP on DBFOT
Client: Public Works Department, Dharmshalasection of NH-341 in (Toll) Basis.
Government of Manipur the State of Gujarat to two/four Duration: Feb. 2012 to October, 2018
Role: As a Sr. Manager (Pavement lane with Paved Shoulder Client: NHAI
cum Highway Design Engineer) Configuration Role: As a Sr. Manager (Pavement
Scope: Main scope of works is Duration: Feb. 2012 to October, 2018 cum Highway Design Engineer)
checking and validating the survey Client: NHAI Scope: Main scope of works is
data for its adequacy and Role: As a Sr. Manager (Pavement checking and validating the survey
consistency, Incorporating the cum Highway Design Engineer) data for its adequacy and
validated data into the design software, Scope: Main scope of works is consistency, Incorporating the
Preparation of Digital Terrain Model checking and validating the survey validated data into the design software,
(DTM), Designing horizontal and data for its adequacy and Preparation of Digital Terrain Model
vertical alignments, design of consistency, Incorporating the (DTM), Designing horizontal and
interchange, Checking cross sections, validated data into the design software, vertical alignments, design of
generate the drawings scripts (plan, Preparation of Digital Terrain Model interchange, Checking cross sections,
profile and cross sections), hand it (DTM), Designing horizontal and generate the drawings scripts (plan,
over to the draftsmen for editing in vertical alignments, design of profile and cross sections), hand it
AutoCAD, To assist in finalizing interchange, Checking cross sections, over to the draftsmen for editing in
drawings, To prepare data for area generate the drawings scripts (plan, AutoCAD, To assist in finalizing
and volume calculations. profile and cross sections), hand it drawings, To prepare data for area
over to the draftsmen for editing in and volume calculations.
Project: Consultancy services for AutoCAD, To assist in finalizing
Preparation of DPR for drawings, To prepare data for areaProject: Odisha Road Sector
Rehabilitation and Upgradation and volume calculations. Institutional Development (Odisha
of Indo/ Nepal Border to Project: Preparation of Detailed RSID)
Varanasi section of NH-233 in Project Report for Upgrading of Duration: Feb. 2012 to October, 2018
the State of Uttar Pradesh under Barmer – Sanchor – Gujarat Client: Odisha Work Department
NHDP IV –B (Length = 291 km) Border Section of NH–15 in the Role: As a Sr. Manager (Pavement
Duration: Feb. 2012 to October, 2018 State of Rajasthan. cum Highway Design Engineer)
Client: NHDP Duration: Feb. 2012 to October, 2018 Scope: Main scope of works is
Role: As a Sr. Manager (Pavement Client: NHAI checking and validating the survey
cum Highway Design Engineer) Role: As a Sr. Manager (Pavement data for its adequacy and
Scope: Main scope of works is cum Highway Design Engineer) consistency, Incorporating the
checking and validating the survey Scope: Main scope of works is validated data into the design software,
data for its adequacy and checking and validating the survey Preparation of Digital Terrain Model
consistency, Incorporating the data for its adequacy and (DTM), Designing horizontal and
validated data into the design software, consistency, Incorporating the vertical alignments, design of
Preparation of Digital Terrain Model validated data into the design software, interchange, Checking cross sections,
(DTM), Designing horizontal and Preparation of Digital Terrain Model generate the drawings scripts (plan,
vertical alignments, design of (DTM), Designing horizontal and profile and cross sections), hand it
interchange, Checking cross sections, vertical alignments, design of over to the draftsmen for editing in
generate the drawings scripts (plan, interchange, Checking cross sections, AutoCAD, To assist in finalizing
profile and cross sections), hand it generate the drawings scripts (plan, drawings, To prepare data for area
over to the draftsmen for editing in profile and cross sections), hand it and volume calculations.
AutoCAD, To assist in finalizing over to the draftsmen for editing in
drawings, To prepare data for area AutoCAD, To assist in finalizing Project: Preparation of
and volume calculations. drawings, To prepare data for area Technical Feasibility Study
and volume calculations. and Master Plan Development /
Re development Of
Page 3 of 4
Transportation
Tanmoy Das
(Project Engineer)
Page 4 of 4