Name of Project : HYDERABAD METRO RAIL PROJECT – ELEVATED METRO STATION AND DEPOT
Company : LARSEN & TOUBRO LIMITED.
Duration : 8st Aug 2011 to 17th Sep 2015. (In India)
Designation : Senior Design Engineer
(Involved in Analysis and Design of Elevated Metro Stations, skywalk, Entry Exits and Depot
Buildings).
Objective is to drive Al Bustan south Extension highway bridge project which includes
three main bridges & four Ramps. Attending weekly review meeting & monitoring the
whole activities regarding submissions & in progress of smooth flow of site activities in fast
pace along with team. Monitor the progress of the Sub-Contract works in line with the main
Project Schedule and main Contract terms and conditions during execution phase.
Provide input for Mould design team and Co-ordinate with them for all the mould
fabrication drawings and assist site team to assemble the mould. Prepared design
calculation and drawings for Rebar Jig, jig lifting beam, Storage yard foundation in Precast
yard and prepared precast yard layout drawings.
Prepared PT Elongation report for all the bridges Post Tension (Internal & External).
Prepared Construction Sequence & Erection kinematics for Main bridge and Ramp bridge
segmental erection. Preparation of Technical Query (TQ) for any design clarification.
Developed & Performed full bridge shop drawings within 6 months by solving design
issues as per codal requirements and getting immediate site clearance. In respect to that,
achieved 400 segments of casting has been done in 3 months out of 900 segments.
Coordinate with site erection team to solve the site issues on time to complete the site
activities as per schedule.
Involved in geometry control, prepared the forecast survey coordinate for the upcoming
erection of segment with assemcon software and erect the segment as per the forecasted
coordinates. So that we will get the cantilever level is equal between the stitch and we never
used stitching beam to adjust the cantilever.
2. UMM LAFINA LINK BRIDGE PROJECT (I Girder Highway Bridges Contract 3,4,5)
Preparation of temporary work drawings for Precast yard layout, Storage yard foundation
and Gantry foundation. Prepared Mould design calculation and drawings for I Girder and
form work design for Precast pile cap, pier head and Pier.
Assisting with Construction Manager & Project Manager for all the structural works.
Rebar order & Co-ordination with steel factory and site, to get material on time based on
program. Preparation of all structural quantity (Rebar, Concrete), progress report (Daily
& Weekly) and report to planning department and higher management.
Drafting and updating of Work Plans, Budgeting and financial forecasting of the Works.
Advised the Project Manager to ensure compliance with the terms and conditions
specified in the Contract, as well as documenting and agreeing on any changes or
amendments that may arise during the implementation of the Works.
3. ROUTE 2020 DUBAI METRO RAIL PROJECT (Elevated and underground Metro Stations)
Main Client – RTA (Government of Dubai) Consultant: Parsons & Systra
Complete analysis and detail design for elevated stations, Special expo station,
Underground stations, Cut and cover, Transition Structure and get approval from client.
Structural Design Review for all Viaduct design calculation and drawings are submitted by
CH2m Design Consultancy.
Coordinate with Viaduct U Girder and Tunnel design engineer, submitted the full line
metro design calculation get approval from client. The same prepared the shop drawings
for rebar with BBS and PT based on the design report and design intent drawings. Strong
experience in review and approval of contractor’s shop drawings with BBS, fabrication
drawings, method statements, material samples, RFIs, Site inspections, coordination with
construction team.
Arrange a meeting with subconsultant of MEP, Architecture to coordinate all their inputs
are incorporated in design drawings. Manage project Target and Prepared structural
activities from stages of detail engineering, involving preparation of master schedules for
structural deliverables & resource schedules.
Independently developed Modeling for Doha Underground Metro Gold Line (Al Sudan,
SPC, Al Waab,) station and entrance with Robot Structural analysis software. Extracted
all the critical forces from the robot structural analysis and completed design
calculations for all Structural members like Columns, Beams, RC Walls, and Slabs based
on Euro code.
Performed each station uplift buoyancy check, overturning and shear check for the
station box and switch box intersection location. As per client requirement,
deputation to Qatar for the full project duration and completed QNM, AL Saad
underground station design calculation approval from client
Took part in management meetings with client along with joint venture’s and followed
the client’s requirement with respect to the project control. Implemented cost saving
initiatives such as reducing the reinforcement quantities from tender to detailed
design
Completed analysis and prepared detailed Design of steel structures (Solar panel
provision) with different cross sections like parabolic, inverted umbrella, Portal option
with straight and Criss - crossing rafters in plan and Truss roof.
Completed the full steel design for main workshop building and stabling yard.
Design of Façade, Aluminum mullion, Aluminum louver, Handrail, Rolling shutter, Steel
ladder, gutter supporting member, Standing seam and trapezoidal sheeting and flashing.
Received recognition from the top management for achieving substantial cost savings on
civil projects through finding better solutions, researching lower prices, insisting on
better quality control, and ensuring that approvals and handovers completed as
scheduled.