OBJECTIVE:
To secure challenging positions where I can contribute to the
growth of the organization and improve my competence through continuous learning.
EXPERIENCE:
1-K.M.C Construction Ltd, NH76, worked during July 2006 to March 2009 as a Site
Engineer(structure) Length of Bridge: 765m, foundation: Pile + Open both.
I had executed 60m span PSC major bridge, five minor bridges & and also worked on 20-
meter span each of PSC Bridges.
I Made BBS also for above structures at NH 76 kisnaganj Baran Bypass East West
Corridore.
Consultant - Wilber smith Associates
Project cost - 600 core approx.
Client - NHAI
2-Era Infra engineering ltd. in Gwalior Bypass project NH-3 to NH 16 Corridors during
March 2009 to 2010 Dec. in BOT project As a Asst. Bridge engineer.
I worked on Girder launching, Piling work on Major Bridge ROB. also worked in pipe
culvert, box culvert.
Culvert, Minor Bridges 20-meter span & Making BBS with GFC drawing etc.
Concessionaire - Era Ltd.
Consultant - Ema Unihorn pvt ltd.
Project cost - 350 Crore
Client - NHAI
3- L&T Ltd, January 2011 to Dec.2012. As Field Engineer civil S2 cadre Panipat, here, I
had worked on pile foundation with other structure UGR work, also made BBS with GFC
drawing
Project cost - 250 core.
Client - HSIIDC.
4- Ramky group as a Sr. engineer projects in Nh24 Moradabad Road project from
Dec. 2012 to Sep.2013. Worked on Minor Bridge (21m span) & ROB. also worked in pipe
culvert, box culvert, Made BBS with GFC drawing.
Project cost - 350 Crore.
Consultant – Emaunihorn india pvt.ltd
Concessioner - IL& FS Ltd
Client NHAI
5-I was working with Supreme Infrastructure India limited. PanvelIndapur Road
project NH-17 from Oct. 2013 to 2016 As a Sr. engineer Structure Projects. I had also
worked in Mjor bridge (80-meter span), minor bridge (20-meter span) Box culvert,
Underpass, retaining wall, return wall, piling work 1200mm Dia on deep foundation
Major/Minor Bridges made BBS etc. with GFC drawing,
Concessioner - Supreme toll ways pvt ltd
PMC - Sowil limited
Project cost - 900 Crore
Client - NHAI
6- I was working with Gianender & Associates Pvt Ltd as Technical Manager from
September 2016 to 2018 dec. for tender related work on Paradeep Port.
Presently I am working in LN infra projects pvt Ltd from May 2019 Construction
supervision work Here we have worked on CUP, PUP, LVUP, VUP, MNB, MJB,
Flyover/Viaduct 500+ MTR checking and calculate the BBS with GFC drawing for running
the work.
RESPONSIBILITIES HELD:
Site Supervision:
● Execution of pile and open foundations of minor as well as major bridges, safely.
● Execution of sub structures of minor and major bridges, safely.
● Execution of superstructures of various minor and major bridges like and
Cast in situ I girders, Construction with launching cranes, Using safety precautions.
●I have made BBS of Bridges & Culverts.
Project Planning and Management: -
● Responsible for planning of project activities and managing construction works
including site measurement, reviewing drawings etc.
● Participation in project review meetings for evaluating the project progress
● Liaison with clients for determining technical specifications and requirements.
Contract administration and management.
● Monitoring onsite construction activities to ensure completion of project with in
The planned time and cost and effective resource utilization to maximize the output.
● Preparing and review of the project management plan and work specific quality
control and project specific health and safety plans.
● Ensuring machinery, equipment and materials received are complying with quantity
and quality.
Technical Qualification: -
Three Years Diploma in civil engineering from Handia polytechnic Handia Allahabad in
the year 2006 (Regular Mode).
COMPUTER SKILLS:
1. AutoCAD(Basic)
2. MS Office
3. Primavera (Basic)
Present Address:
Farhan Ahmad, Village-Maudara
Karenti kunda Dist. Partapgarh
(U.P.) 411019