Professional Documents
Culture Documents
M
E-10/248,R.M.Colony,
anandrsw@gmail.com Phase-2,7th cross street,
Ph.: +91-9442040135( INDIA) Dindigul-624001,
: +91-9095550006(INDIA) TamilNadu.,India-628716
Objective:
In search of a challenging position of civil engineering where I can learn and work with
diversified and creative projects in positive ways.
Skills:
Educational Background:
Experience Summary:
Civil professional with 8+Yearsexperience in Planning, Quality control and
Execution of Major bridges and Industrialstructures
Strong technical knowledge in design, Analysis, Project Planning management
concepts, Quantity surveying and Execution.
Working asCivilSupervisor -Civil(PETRONAS TRAIN 9 ONSHORE PROJECT)
in JGC Corporation, Bintulu, Malaysia Since 5th April 2015 to 30th March 2016
Working asCivilSupervisor -Civil(Barzan Onshore Project) in JGC Corporation,
Qatar, Since 30th September 2012 to 30thNovember 2014.
Worked as SrEngineer-Civil in AL-MARTAN&AL-ISHABBCONTRCATING
CO, Since October 2009 to February 2012
Good experience and Sr Engineer in Ready mix concrete section in Quality Control
Department in charge in AL-MARTAN&AL-ISHABBCONTRCATING PVT LTD
WorkedasEngineer(Civil) in Larson &Toubro construction (India) ltd
(ECC DIVISION)Since June 2007 to September 2009
Responsible to complete the project in time and with quality
Work Summary:
Construction of MLNG Project Train-9, located in Bintulu Town in Sarawak, calls for the engineering,
procurement, construction, commissioning of the LNG processing facilities including Gas Processing
Unit, Sulphur Recovery Unit and NGL Recovery Unit to produce methane, ethane, propane, butane and
condensate.
Train-9 plant is cost an Estimated $2.0bn and Expected to supply 3.6 million tones of LNG per Year,
Petronas is managing the construction of the new plant and will operate it once it is completed
Responsibilities:
Review Documents pertaining to the Project Specification and Scope of Works Submitted by
Contractor/Sub-Contractor.
Follow up the Engineering, Quality and safety standards as per project requirements.
Supervising the Sub Contractor Constructions activities as per approved Safe work method of
Statement, Verify the MAR and Inspection activities, and Resolving the Technical Problem
Quantity surveying of materials, and ResourceAnalyzing, and Monitoring the BOQ
Execution of Fire Proofing Work STR. Member&Pipe support member using(Monokote&Fendolite)
and Mechanical Vessel as Per SWMS and Asphalt Road Works.
Pre paring the Punch list and Co-Ordinate with Sub Contractor to Close the Punch list
Facilitate Turn Over/Release Notice for Civil Foundation Structures and Trenches to concerned
discipline.
Assist the QC manager and Civil manager in Resolving any discrepancies and ambiguities.
Review Field Changes or Change Orders to be given to Sub-Contractors for Implementation with cost
and time Consideration.
Attend Weekly meetings with Contractor/Sub-Contractor for Area Leadership/Coordination.
Issue Work Permits on my Designated Area of Assignments based on Project Safety Requirements.
Coordination of Civil works to Other Section Discipline for Simultaneous working and
accomplishments.
Supervise and Inspect Project Site for Proper Implementation of Drawings based on Project
Specification and Schedule.
Work Summary:
Planning and co-ordination with Subcontractor, Engineer, construction manager, and Client, as per
schedule.
Follow up the Engineering, Quality and safety standards as per project requirements.
Supervising the Sub Contractor Constructions activities and Resolving the Technical Problem,
Execution, Measure & analyze project performance regarding progress, schedules and Quality.
Project Name: Construction of sub structures and super structures of two numbers of
major Pre-stressed Concrete bridges& Box culverts injizan al-quinfadha road
Construction of Pre stressed concert skew bridge slope ratio 2:1 from station
88+580.17 to 89+222.17(720m length) & bridge no-67 &240+100 to
240+460(360m length) bridge no-65
Construction of precast pre stressed concrete T-section girder of 10 parallel lines span
length 19.80m, wide 1.6m,height-1.20m, slope ratio 2:1 of 10 parallel line
Precast concrete slab 1m x1m shoring for the protection of soil sliding at excavation in
footing and cast in site place concrete for footing 11mx8mx1.10m with 31 nos for pier
and 2 abutments.
Construction of Piers, pier cap ,diaphragms ,wing walls for 2 abutments and
Elastomeric bearings , Deck slab, parapet walls and slope protection
Construction of box culvert 4 vent, 3 vent cells, wing walls in box culverts
Planning and co-ordination with Construction manager, Jr.Engineer, and Client, as per
Follow up the Engineering, Quality and safety standards as per project requirements.
Quantity surveying of material and maintain records for Ready Mix Concrete Batching
Plant
Responsible for Pre cast yard for planning and execution, Preparation of bill of sub
contractors and client and Ready Mix Concrete Batching Plant
Concrete/asphalt batch plant inspection and field testing in site.
Supervising the whole work of project and make progress
Work Summary:
Project Name: SAUDI ARAMCO/ PETROFAC KBG-2 Gas pipe Line Project
Project Duration: October2009- August 2010
Description :
Construction of New KBG-2 -40” Gas Pipe line-46km from khursaniyah gas plant to
berri gas plant for Saudi Aramco.,(Karan Utilitiesand Cogeneration Project)
Gas Scraper launcher and receiver concrete supports, Thrust anchor block, Electrical
cable duct bank, substation constructions For KBG-2.
Concrete Pavement, RTR Line for OWS and Manhole Construction inside the Plant..
Designation :CIVIL ENGINEER
Responsibilities:
Project Name: SAUDI ARAMCO/ PETROFAC RAW WATER WELL STATION 890
Project Duration: October2009- August 2010
Description :
Designation:PROJECT ENGINEER
Responsibilities:
Responsible to complete the project in time and with quality
Planning and Monitoring the daily project activity and co-ordinate with Clients
Monitoring the daily project activity and co-ordinate with Designers and contractors.
Personal Details:
(ANANDA KRISHNAN.M)