0% found this document useful (0 votes)
55 views1 page

Continuity Connection Over Fixed Piers Report

This document is the final report from August 2004 on improving continuity connection over fixed piers. It was submitted by Dr. M Ala Saadeghvaziri, Dr. William R. Spillers, and Libin Yin from the New Jersey Institute of Technology to the New Jersey Department of Transportation and the Federal Highway Administration. The report details research on enhancing the connection between bridge sections over fixed supports like piers.

Uploaded by

vrajan1988
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

Continuity Connection Over Fixed Piers Report

This document is the final report from August 2004 on improving continuity connection over fixed piers. It was submitted by Dr. M Ala Saadeghvaziri, Dr. William R. Spillers, and Libin Yin from the New Jersey Institute of Technology to the New Jersey Department of Transportation and the Federal Highway Administration. The report details research on enhancing the connection between bridge sections over fixed supports like piers.

Uploaded by

vrajan1988
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

FHWA-NJ-2004-017

Improvement of Continuity Connection over Fixed Piers

Final Report
August 2004

Submitted by
Dr. M Ala Saadeghvaziri Dr. William R. Spillers Libin Yin
Professor Distinguished Professor Graduate Student

Department of Civil and Environmental Engineering


New Jersey Institute of Technology
Newark, NJ 07102

NJDOT Research Project Manager


Mr. Tony Chmiel

In cooperation with

New Jersey
Department of Transportation
Bureau of Research
and
U.S. Department of Transportation
Federal Highway Administration

You might also like