Bachelor of engineering: Civil department - june 2013
Faculty : New Cairo Academy
Graduation Project : Projects Mangement
Military status: Exempted
Last Update: August 2020
Computer Skills
Primavera p6 Microsoft office
Autocad Etabs
Sap ,safe , csi columns
Outpatient Building 8500 m2, Smart building 2500 m2 and two steel bridges connecting
existing and expansion building
Each building consists 3 basement and 13 floors
Foundation works included (Diaphram walls ,Ground anchoring)
Responsibilities:
Monitoring and assessing construction phase activities, throughout inspection and
approvals of work done, materials and document flow, (QA/QC).
supervising and overseeing the direction of the project,ensuring that the client
specifications and requirements are met,reviewing progress
coordinating and supervising construction works
finding ways to prevent problems and to solve any that crop us
It is the first smart car parking in Egypt and the Middle East.It is high-tech, fully automated garage according
to the state of the art electronic systems, with a total cost about 220 million EGP. The value of the civil and
electromechanical works executed project is 79 million EGP; the project implantation is divided into 2
phases.
The First phase:Its total area reached 5300m2, a building space of 21000m2 and its capacity is 900cars..The
project is working with a fully mechanical system and managed automatically according to the latest
electronic systems.
The parking consists of 4 underground floors at a depth of 16m; its implementation is divided into 2 phases.
The project total area is 10000m2; The building space is 40000m2.The garage will take up a total of 1,700
cars. There are 12 electronic elevators that will examine the cars once they are standing on them.
The garage is equipped with robots to park vehicles, transferring them from the inside to the outside and
vice versa., gates for entry and exit. Roxy Smart Parking is equipped with 6 robots to park vehicles,
transferring them to the span inside the garage, the vehicle storage and recall time that takes 3-6 minutes,
and there are 3 exits and 3 entrances. Additionally, there are 6 elevators for vertical movement among the
floors.
The Diaphram wall was used to support the side of the excavation to preserve the adjacent buildings and to
use it in the construction system.
Project contents: (Diaphram walls , cfa piles , bored piles ,all concrete works )
Training
-Training at Arab contractor company in 2010 (Water treatment project in 15
May City)
-Training at Arab contractor company in 2011 (Construction of Project Ahmed
Oraby bridge)
-Training at Arab contractor company in 2012 (construction of Imbaba Garden
,Giza)
Projects Photo
57357 Cancer Hospital Expansion
Roxy Smart Parking
Four Season Sharm El Sheikh Hotel