You are on page 1of 60

AMR MOHAMED ALI

DOHA, QATAR
00201008968996 / 0097466969710
engineer_amr61@yahoo.com

Construction manager

CAREER OBJECTIVE
To obtain a suitable position within your company as a civil engineer where I can apply
my experience, education and skills.

Personal Information

• Date of Birth: 07/07/1988


• Marital Status: Married

• Military Status: exempted

• Nationality: Egyptian

Education
2006 - 2011 - Higher Institute of Engineering in May 15th city

• Bachelor of Engineering, Civil engineering department.


• Graduation year grade: Very good.
• Cumulative Grade: good.
• Graduation project: Management.
• Graduation project grade: Excellent.

1
Skills
1. Computer Skills:

• Primavera p6
• SAP V14
• Excellent knowledge of Office programs.
• YAT Professional Diploma in Civil Engineering 2009.

2. Language Skills:

Understanding
Language Writing Speaking while listening

Arabic (native) Native Native Native

English Very good Very good Very good

Hindi - good good

Work Experience

Feb 2022 to Date


Doha, Qatar
Company: SIGMA
Position: Construction Manager Project: Mixed-Use
Tower (3B+G+34+T).
Open excavation project Formation level: -15 m. Value: 203 million QR.

Responsibilities:

• Acting as the main technical adviser on a construction site for subcontractors, people
and operatives.
• Checking plans, drawings and quantities for accuracy of calculations.
• Ensuring that all materials used and work performed are as per specifications.

2
• Overseeing the selection and requisition of materials.
• Managing, monitoring and interpreting the contract design documents supplied by
the client or architect.
• Liaising with any consultants, subcontractors, supervisors, planners, quantity
surveyors and the general workforce involved in the project.

Aug 2016 to Feb 2022


Doha, Qatar
Company: QD-SBG
Position: Project Engineer
Project: The main A1 artery road, Lusail Plaza ‘Public Realm’ and car park, 2 km of
multilane below ground highway, a 3-level combined tunnel, flyovers and
bridge crossings, Light Rail transit station, a 4-storey underground car park,
local access roads, associated mechanical, electrical and hydraulic installations,
and waterfront landscaping works.

Fundamental construction works on CP7B has commenced with the initiation of


piling works, sea protection diaphragm walls and site-specific excavation,
which is now approximately 1/3 of the way to completion (totaling 2 million
cubic meter)
Open excavation project Formation level: -31 m. Value: 5 billion QR.

Responsibilities:
• Acting as the main technical adviser on a construction site for subcontractors, people
and operatives.
• Checking plans, drawings and quantities for accuracy of calculations.
• Ensuring that all materials used and work performed are as per specifications.
• Overseeing the selection and requisition of materials.
• Managing, monitoring and interpreting the contract design documents supplied by
the client or architect.
• Liaising with any consultants, subcontractors, supervisors, planners, quantity
surveyors and the general workforce involved in the project.

3
Oct 2015 to Aug 2016
Doha, Qatar
Company: Al Ali Engineering
Position: Project Engineer
Project: Salwa Resort

One of the largest resorts and residential projects aimed to be constructed on


257 acres of land in the Middle East, Hilton Salwa Beach Resort, Mountain’s
water park, Adventure Park.

Hilton Salwa Beach Resort and Villas will be constructed on 257 acres of land
and is envisioned to include a water park, marina, dive center, cinemas,
pools, health club, spa and considerable retail space.

1.6-kilometer squared Resort.84 Villas, 22 Buildings staff compound, 89


swimming pools, 49 Water features, Sports areas utility buildings, Landscape
and full serviced with infrastructure, Networks and underground Water tanks.
Project Value: 3.75 billion QR

Responsibilities:

• liaising with the local authority (where appropriate to the project) to ensure
compliance with local construction regulations and by-laws;
• communicating with clients and their representatives (architects, engineers and
surveyors), including attending regular meetings to keep them informed of progress;
• day-to-day management of the site, including supervising and monitoring the site
labor force and the work of any subcontractors;
• planning the work and efficiently organizing the plant and site facilities in order to
meet agreed deadlines;
• overseeing quality control and health and safety matters on site;

Oct 2013 to Sep 2015


Doha, Qatar
Company: Al Ali Engineering
Position: site Engineer

4
Project: Labor City project
An enormous worker complex in Qatar just outside of Doha. Labor City can
accommodate some 70,000 foreign workers, who come to the Gulf state to
participate in its grand construction projects, such as those for the 2022 FIFA
World Cup.

Labor City, which lies just 14 kilometers from Doha and covers an area of
1,100,000 square meters, is just one of seven house complexes that the
government is building to house almost 260,000 labor migrants.

Responsibilities:
• managing parts of construction projects
• overseeing building work
• checking technical designs and drawings to ensure that they are followed correctly
• supervising contracted staff
• ensuring projects meet agreed specifications, budgets or timescales
• liaising with clients, subcontractors and other professional staff, especially quantity
surveyors and the overall project manager

Aug 2011 to Aug 2013


Suez, Egypt
Company: Siac
Position: site Engineer
Project: Suez Steel Project

Work Training:

Aug 2010 to Sep 2010


Trainee at Engineering Company for Industries & Construction (SIAC) - Suez Steel
Project.

Jun 2010 to Jul 2010


Trainee at EGYPTIAN.FRENCH. JV (Greater Cairo metro – line 3).

Aug 2009 to Oct 2009

5
Trainee at EGYPTIAN.FRENCH. JV (Greater Cairo metro – line 3)

CERTIFIED COURSES

• PMP Mar2018
• PMI-RMP PREPARATION COURSE June 2018

• Primavera P6 Professional Project Management At the Construction & Project


Management
Research Institute (CPMRI). Feb 2011
• SAP 2000
The center for advanced software and Biomedical
Engineering consultations (CASBEC). Oct 2010

• Temporary work Oct 2018

6
‫اإلداره‬

‫مدير تنفيذي‬

‫عدد ‪ 2‬مهندس‬
‫محاســــب‬ ‫مندوب‬
‫مهندس مدني ‪ +‬مهندس جيولوجي‬

‫نجار مسلح عدد ‪4‬‬


‫بناء عدد ‪3‬‬ ‫حداد عدد ‪3‬‬ ‫عدد ‪ 1‬فورمان‬

‫عماله عاديه ‪3‬‬ ‫سباك عدد ‪1‬‬ ‫كهربائي عدد ‪2‬‬ ‫بالستر عدد ‪2‬‬

‫ا‬ ‫إإجمإإإ‬
EMARET ALBAYT
CONSTRUCTION CO.

PROFILE
GENERAL CONTRACTING COMPANY
Company Over View 2

About Us
EMART ALBAYT CONTRACTING CONTRACTING CO W.L.L is Qatari companyall with
high expertise dedicated to each project.
Since its incorporation in September, 2016 our company CONTRACTING W.L.L has
focused on providing services for General Contracting, & Project Management. We now
have a strong confidence,,,, trust and recognition and outstanding reputation in stepping up.
Our company has based its growth on technical excellence, high standards of
customer service, and a willingness to embrace new challenges.
We are excited and confident that you will find a welcome experience with us, that
partnership with us can be deeply rooted and long lasting.
Company Over View 3

Objective
To become one of the best construction company in Qatar and have trusted of our
clients
Fully meet all our clients and partners needs in the most efficient and effective manner. Assist
its client and partners, in dealing with local business requirements, and government
regulations and all necessary for growing business in Qatar and the vision of 2022 and 2030.
Company Over View 4

Strategic Goals
Develop a comprehensive strategy that raises the level of our company . Services and
activities, within the country and the rest of the world.
Operate in an accountable and transparent manner and fully optimize the services we deliver
to our client.
Ensure that all processes, procedures and actions we take are designed to satisfy and protect
customer needs and interest
5

Company’s Capability

➢ Equipment &Tools

➢ Partnership & Collaboration relations with suppliers & subcontractors


Company Over View 6

Projects Objectives
From our prospect, to reach to our clients and stakeholders’ satisfaction through considering the following:
➢ COST : Feasibility and cost estimating for materials, equipment’s,
tools and manpower
➢ QUALITY : Completing all deliverables in accordance with the
project’s specification and local (QCS 2014) and global
sa specifications
Time Management Plan
➢ TIME : Complete all deliverables in accordance with the project’s ✓ Define Activities
✓ Sequence Activities
allotted time. (project time frame) ✓ Estimating Activity Resources
✓ Estimating Activity Duration
✓ Develop Schedule
QA/QC ✓ Project Handover Date

✓ Quality Assurance
Qualit Tim
✓ Quality Control
y e
Cost Control
✓ Feasibility Study.
✓ Project Estimation
✓ Cost/Benefit Analysis
✓ Quality Plan
Cos
✓ Time Management Plan
t
✓ (Project Time Scale)
✓ Executing Plan
✓ Risk Managements
General
Gallery

Project Name Project Name

17
Project Name Commercial Building (B + G+ 3 +B H )
Location ALWAKRA
Owner SHIKA FATIMA BENT ABDULRAHMN
Project Description finishing
Completion Date march2017
Total Project Value 4,375000
Status finish
Project Name 2VILLA ( G+1+BH+ Majles + out kitchen
Location AL THUMAMAH
Owner T.H.G.A
Project Description finishing
Completion Date 21/5/2019
Total Project Value 2,940,000
Status ON Going
Gallery
Gallery

Project Name villa B+G+1+BH+OUT MAJLES


Location Ein Khaled
Owner N albo-enine
Project Description finishing
Completion Date 2018
Total Project Value 3,200,000
Status done
Gallery
Gallery
28

Project Name Private Villa (G+1+PH + Out Kitchen)


Location Al-Wakrah
Owner Hamad. A (QHB)
Project Description Civil Works
Total Project Value
Gallery
28
2
Gallery 9

Project Name Private Villa (1+PH + Out Kitchen) Project Name Private Villa (G+1+PH + Out Kitchen)
Location Al-Wakrah
Owner Hamad. A (QHB)
Project Description
civil work
Total Project Value
1150000 Status
Gallery 30

Project Name Private Villa (1+PH + Out Kitchen)


Location om Garn
Owner S.S.AlK
Gallery 31

Project Name Bolt Factory- Sub-Station


Location New Industrial Area
Owner SSS
Project Description Turn Key
Total Project Value 230,000.00
Gallery 32
Gallery 33

Project Name Factory – Civil Works


Location New Industrial Area
Owner M.alkuwari
Project Description Turn Key
Total Project Value 2,860,000.00
Status On Going
Gallery 34

You might also like