KICKOFF MEETING

FEASIBILITY STUDY AND DESIGN


OF
BRIDGES & INTERSECTIONS

“Bridging Bangladesh with Aesthetics”


DATED :Feb 16th, 2023
FEASIBILITY AND DESIGN OF BRIDGES & INTERSECTIONS

Content of the Presentation

• Summary of Contract Details


• Project Objectives and Scope of Works
• Project Execution Plan and Timeline
• Team Structure and Organisation
• Our Suggestion
EXECUTING AGENCY CONSULTANTS
Bridge Construction and Maintenance Circle
Roads and Highways Department SMEC-SYSTRA-ACE JV
Road Transport and Highways Division

Ministry of Road Transport and Bridges


Government of the People’s Republic of
Bangladesh

Authorised Representatives:
Roshni-A-Fatimah (Project Director, BCMC, RHD )
Dr. Janardhan Sundaram (Executive Director, SMEC)
Keshav Kumar (Vice President, SYSTRA)
Contracts Awarded: 28 January 2023 and 05 February Masudur Bhuiyan (Country Manager, ACE Consultants)
2023
Contract Commencement: 05 February 2023 and 12 Project Office: Hollywood Tower, Baridhara Block-J,
February 2023 Pragati Sarani, Baridhara.
Kick-off meeting : 16 February 2023 3
Contract Period: 18 months
FEASIBILITY AND DESIGN OF BRIDGES & INTERSECTIONS

Contracts Awarded

Detailed Feasibility
Study and Design of
Six (06) Bridges
FEASIBILITY AND DESIGN OF BRIDGES & INTERSECTIONS

Overall Project Execution Strategy

Transport Study
Feasibility Outcome Concept Study Detail Design
Number of Lanes

Detail Design & Drawing


Design Criteria Concept Designs Final Concept Designs
Design Basis Report Detail Social / Environmental
Initial Environmental BoQ and Cost assessments
Impact Assessments Estimates
Location Study
Land Acquisition &
Preferred Alignment, Initial Social
Resettlement
Hydrological Study Assessments
Final Cost & Economic/
Bridges Options Study Cost Estimates &
Financial Analysis
Economic / Financial
Type of Structure Analysis
Procurement Support
& Span
FEASIBILITY AND DESIGN OF BRIDGES & INTERSECTIONS

Overall Project Execution Timeline

M1 M4 M7 M15
M10
M11 M17
Transport Study

Draft Feasibility Study

Final Feasibility Study

Draft Concept / Preliminary Design

Final Concept / Preliminary Design

Draft Detail Engineering


Design
Final Detail Engineering Design
FEASIBILITY AND DESIGN OF BRIDGES & INTERSECTIONS

Deliverable Reports

Draft Final
Draft Concept Concept
Month 1 Feasibility Design Design Month 17
Month 7 Month 11
Report Report Report

Inception Month 4 Final Month 9/10 Draft Final


Month 15
Report Feasibility Detail Detail
Report Design Design
Report Report

“We submit sub-reports in progressive manner”


FEASIBILITY AND DESIGN OF BRIDGES & INTERSECTIONS

Consultant’s Team
PROJECT MANAGER TEAM LEADER

DEPUTY TEAM LEADER

TECHNICAL COORDINATOR PROJECT COORDINATOR

CONTINUOUS IMPROVEMENT AND KEY PERFORMANCE INDICATORS

Health and Safety


(Zero Harm) Traffic Engineer Bridge Design Specialist Environmental Specialist Office Manager

Computer Operator/Office
Quality (Right First
Traffic Modeller Resettlement Specialist Support
Time) Highway Design Engineer
CAD Operator
Sustainability Bridge Aesthetics Specialist Road/Bridge Safety Specialist
Transport Economist
GIS Specialist
Value (challenging Electrical Engineer
& meeting budget) Geotechnical Engineer
Surveyor Animator
Commercial Pavement & Material
Management &
Land Acquisition Specialist
CAD Operator Engineer
Change Control

Reporting, Hydrologist/ River Training Contract Specialist


Responding and Engineer
Junior Engineer
Document Control
Junior Engineer Surveyor
Risk Management Need Based Specialist
Need Based Specialist
Delivery on Time

Client/Stakeholder
Satisfaction Legend: Key Staff Non-Key Staff Supporting Staff
FEASIBILITY AND DESIGN OF BRIDGES & INTERSECTIONS

Our Suggestions

- All important communications will be in written format between Team Leader and
Project Director & Emails are for general communication
- Get trained on Web Based GIS which will be updated daily with project information
& progress
- We will provide the Drone Video Survey and 3D GIS
- Social & Environmental outputs will be supported by GIS
- More staff from Consultant’s overhead deployed to meet the delivery targets
- Appreciate the international experts’ support where necessary at no cost
- Early Engagement of Stakeholders
- We will perform highway alignment check before finalising the bridge locations
- Monthly Progress Meetings
FEASIBILITY AND DESIGN OF BRIDGES & INTERSECTIONS

Potential Key Stakeholders


Local Government
District Councils Engineering Department
(LGED)
BUET University

Bangladesh Inland
Bangladesh Water STAKEHOLDER LIASON Water Transport Authority
Development Board (BIWTA)
(BWDB)

Power Grid Company of


Bangladesh Railway Bangladesh (PGCB)
(BR) Bangladesh Bridge
Authority (BBA)
FEASIBILITY AND DESIGN OF BRIDGES & INTERSECTIONS

NEXT STEPS:

❖ Collect all the available secondary data


❖ Submit the Inception Report
❖ Drone Video Survey & Site Assessments
❖ Submit the Reconnaissance Report
❖ Submit Desktop Study Reports
❖ Submit Survey Plan for Traffic Survey
❖ Begin the Traffic Survey upon Client approval
FEASIBILITY AND DESIGN OF BRIDGES & INTERSECTIONS

Technologies we will adopt:

- Drone Surveys
- GNSS to validate Topo and LA
- GIS and Web GIS for Information Sharing
- 3D GIS and 3D Engineering Animations
THANK YOU