You are on page 1of 3

URRICULUM

ITAE

Fawara choke Dinga city P/o Dinga Tehsile Kharian District Gujrat
Punjab, (Pakistan).
Email: buttarsal29@gmail.com
Cellular: +92-331-6347351 /+92-300-6347351

OBJECTIVE:

To pursue career in a progressive organization that provides opportunities for career growth
and professional development in order to groom the overall personality.

PERSONAL INFORMATION:

 Father’s Name Muhammad Afzal


 Date of Birth 28-03-1990
 Nationality Pakistani
 N.I.C 34202-4328038-1
 Marital Status Married
 Religion Islam
 Domicile Gujrat (Punjab)
 Passport No DQ1510382

EXPERIENCE:

 Company CCCC (FHCC) First Highway Construction Company.

 Project: Peshawar Karachi Motorway (PKM)


 Period: 01-Mar-2018 to till Date.
 Designation: Architectural Designer.

Main duties:
During my working period, I checked construction drawings, and make shop drawings of
Architectural and Electrical works for approving from consultant. If any issue found by
consultant then resolved the issue and after approving by consultant give the drawing to main
contractor for executing. Prepare quantity for different building materials of this project. Give all
initial quantity of material s to contractor for purchasing material to executing the project.
Prepare Highway safety manual for my project under the instruction of my chief engineer and
also working on hydrological report for this project. I also worked in outdoor plumbing drawing
for major camp area of this project. Design manhole cover, generator shed, and sign board for
this project. And more over I worked on as built drawing for this project and resolved issued of
all the drawings.

 Company China State Construction Engineering Corporation (CSCEC).

 Project: New Islamabad International Airport Islamabad Pakistan


 Period: 12-Jan-2012 to 28-Feb-2018.
 Designation: Architectural Designer.
Main duties:
During my working period, I checked construction drawings, and make shop drawings for
approving from consultant. If any issue found by consultant then resolved the issue and after
approving by consultant give the drawing to my working staff.
I also worked on initial estimate for architecture items of works of our company new project of
Burma. And more over I worked on as built drawing for this project and resolved issued of all the
drawings.

 Company: Skafe International Company Pvt Ltd.

 Project: TEVTA, Vocational Training Center, Green Town, Lahore.


 Period: 02-August-2010 to 30-Dec-2011.
 Designation: Site Engineer (Civil)
Main duties:
The construction drawings are checked at site and various issues solved and working layout at site as
per drawings. During the period, I am working multiple activities, layout of building foundation with
theodolite, check all the building works quality, and supervise all activities of construction.
I worked on estimate the quantity of building material and resolve all the issue regarding project. I
report all the activities to my project manager.
 Company: Sinaco Engineering Company Pvt Ltd.

 Project: Muhammad Ali Jinnah University Sahala Campus.


 Period: 01-May-2009 To 30-July-2010
 Designation: Site Engineer
Main duties:
The construction drawings are checked at site and various issues solved and working layout at site as
per drawings. During my stay as a site engineer working on sewer line activities, cafeteria drawing layout
and other construction activities. Construction of septic tank and also underground water tank. Working
with auto level on road side of the project. Give report to site incharge and project manager.

ACADEMIC RECORD:
Duration Obtain/ Grade/
Degree Subject Year Board/University/Institute
(years) total %age

B.TECH
Civil 4 2017 3.0/4.0 A University of South Asia Lahore.
4 years
Govt. College of Technology Rasul (M.B.DIN).
D.A.E Civil 3 2009 2389/3350 A
PBTE Lahore.
Board of Intermediate and Secondary
Matric Science 10 2006 662/1050 B
Education Gujranwala.

COMPUTER SKILLS:
 Auto Cad (2D/3D).
 SAP2000
 Microsoft Office.
 In page (Urdu).
 Corral Draw.
 Primavera P6
TECHNICAL SKILLS:
 Supervision(All Site Activities)  Preparation of As Built Drawings
 Preparation of Building Estimate  Amendment in Design and Revised
 Preparation of Bar Bending Schedule Drawings
 Building Layout  Preparation of Monthly Interim Payment
 Security Control and Monitoring. Certificates (IPCs) for ongoing Project.
 Environmental Control and Monitoring.  Preparation of Variation orders.
 Behavioral Based Safety management.
 Preparation of rate analysis.
 Working with instrument level
 Working with instrument Theodolite.  Verification of Sub Contractor Bills.
 Building Construction.  Arrangement, Negotiations and
 Management coordination with sub-contractors.
 Administrative quality  Preparation of Monthly Progress report.
 Auto cad 2D+3D  Procurement of Material for site
 Preparation of Construction Drawings for  Agreement with Subcontractors and
Architecture, MEP, HVAC, Landscaping.
suppliers
 Preparation of Shop Drawings for
Architecture, MEP, HVAC, Landscaping.

LANGUAGE SKILLS:
 Urdu
 English
 Punjabi
Reference:
 Reference will provide on demand.

You might also like