CONSTRUCTION LOGBOOK

PROJECT: A PROPOSED 2-STOREY RESIDENCE WITH FENCE LOCATION: PARADISE VILLAGE, BARANGAY LAHUG, CEBU CITY

OWNER MARC JASON LUA, MARC JOSHUA LUA, MIKA MARI LUA ADDRESS: PARADISE VILLAGE, BARANGAY LAHUG, CEBU CITY

WEATHER: ( ) SUNNY ( ) FAIR ( ) CLOUDY ( ) RAINY DATE: SHEET NO. OF

MANPOWER: EQUIPMENT:
( ) FOREMAN ( ) CARPENTER ( ) A.C.U INSTALLER ( ) CONCRETE MIXER ( ) BAR CUTTER
( ) PLUMBER ( ) ELECTRICIAN ( ) LABORER ( ) CONCRETE PUMP ( ) PAYLOADER
( ) MASON ( ) PAINTER ( ) WAREHOUSEMAN ( ) BACKHOE ( ) WELDING MACHINE
( ) WELDER ( ) VARNISHER ( ) TILE INSTALLER ( ) TAMPING RAMMER ( ) DEWATERING/ SUMP PUMPS
( ) STEELMAN ( ) TIMEKEEPER ( ) LANDSCAPER ( ) VIBRATOR ( ) FORKLIFT
( ) ELECTRONICS TECHNICIAN & I.T. ( ) GRINDER/ TILE CUTTER ( ) AIR COMPRESSOR WITH JACK HAMMER

SCOPE OF WORKS:
(INTERIOR/EXTERIOR) O. MISCELLANEOUS
A. EXCAVATION ( ) PLASTERING OF WALLS ( ) STAKE – OUT
( ) FOOTINGS FOR COLUMNS & TIE BEAMS ( ) PLASTERING OF COLUMNS ( ) SOIL TREATMENT/ POISONING
( ) FOOTINGS FOR WALLS (ZOCALO) ( ) PLASTERING OF PERIMETER FENCE ( ) INSTALLATION OF TEMPORARY FACILITIES: OFFICE,
( ) FOOTINGS FOR RETAINING WALL(S) ( ) FLOOR TOPPING WAREHOUSE & OTHERS
( ) FOOTINGS FOR CONCRETE STAIR(S) ( ) FLOOR & WALL TILE INSTALLATION(S) ( ) INSTALLATION OF TRELLIS
( ) FOOTINGS FOR WATER TANK(S) ( ) INSTALLATION OF CONCRETE PAVERS ( ) INSTALLATION OF GAS LINES
( ) SEPTIC TANK(S) ( ) SMOOTH FINISHING ON COLUMNS ( ) TESTING OF GAS LINES
( ) RAINWATER TANK(S) ( ) GRANITE/MARBLE INSTALLATION ( ) FABRICATION & INSTALLATION OF GATES & GRILL
( ) DRAINAGE WORKS
( ) SHORING G. CARPENTRY & WOOD WORKS ( ) INSTALLATION OF ROOF UNDERSHEETING/
( ) BACKFILLING ( ) FLOOR JOISTS/ SLEEPER INSTALLATION(S) INSULATION
( ) CEILING JOIST INSTALLATION(S)
B. SCAFFOLDINGS ( ) CEILING BOARD INSTALLATION(S) P. OTHERS
( ) COLUMNS & WALLS ( ) CABINETRY ( ) TURN OVER TO THE OWNER
( ) RETAINING WALL(S) ( ) DOOR INSTALLATION(S) ( ) DEMOLITION
( ) BEAM & SUSPENDED SLAB(S) ( ) INSTALLATION OF DOOR AND WINDOW JAMBS
( ) ROOF BEAMS WITH HEADERS
( ) SEPTIC TANK(S) ( ) T&G FLOOR INSTALLATION
( ) RAINWATER TANK(S)
( ) CONCRETE GUTTER(S) H. PLUMBING WORKS
( ) INSTRALLATION OF ROUGHING-INS: LAY-
C. FORMWORKS OUTING/PIPING
( ) COLUMN(S) ( ) FIXTURE INSTALLATION(S)
( ) BEAMS & SUSPENDED SLAB(S) ( ) DRAINAGE SYSTEM INSTALLATION WITH
( ) ROOF BEAM(S) CATCH BASIN
( ) RETAINING WALLS ( ) CONSTRUCTION OF RAINWATER TANK
( ) CONCRETE STAIR(S) ( ) INSTALLATION OF DOWN SPOUT(S)
( ) CONCRETE GUTTER(S) ( ) INSTALLATION OF WATER LINES (HOT/COLD)
( ) PERIMETER FENCE COLUMN ( ) INSTALLATION OF SOLAR WATER HEATER

D. REBAR WORKS & STEEL WORKS I. ELECTRICAL WORKS


( ) SORTING, PILING, CUTTING & BENDING OF REBARS ( ) INSTALLATION OF ROUGHING-INS:
( ) REBARS FOR FOOTING(S) LAY-OUTING/PIPING
( ) REBARS FOR COLUMN(S) ( ) PANEL BOARD/CB INSTALLATION
( ) REBARS FOR FOOTING TIE BEAM(S) ( ) ELECTRICAL WIRING INSTALLATION(S)
( ) REBARS FOR LINTEL BEAM(S) ( ) FIXTURE INSTALLATION(S)
( ) REBARS FOR BEAMS & SLABS ( ) INSTALLATION OF PERIMETER/ GARDEN
( ) REBARS FOR CANTILEVER BEAMS LIGHTING(S)
( ) REBARS FOR WALL FOOTING (ZOCALO) ( ) TESTING/ COMMISIONING
( ) REBARS FOR CONCRETE STAIR(S)
( ) REBARS FOR SLAB ON-FILL J. ELECTRONICS
( ) REBARS FOR PERIMETER FENCE ( ) INSTALLATION OF ROUGHING-INS: PIPING & UTILITY
( ) REBARS FOR EXTERIOR WALLS BOXES, ETC.
( ) REBARS FOR INTERIOR WALLS ( ) INSTALLATION OF TELECOMMUNICATION SYSTEM
( ) REBARS FOR SEPTIC TANK(S) ( ) INSTALLATION OF SECURITY & ALARM SYSTEM
( ) REBARS FOR WATER TANK(S) ( ) INSTALLATION OF BUILDING AUTOMATION SYSTEM
( ) REBARS FOR RAINWATER TANK(S) ( ) INSTALLATION OF SOUND COMMUNICATION SYSTEM
( ) STEEL TRUSS/ RAFTER FABRICATION ( ) INSTALLATION OF OTHER ELECTRONICS & I.T SYSTEM
( ) GRILLS & HANDRAILS ( ) TESTING/ COMMISIONING
( ) REBARS FOR RETAINING WALL(S)
( ) REBARS FOR CONCRETE GUTTER K. MECHANICAL
( ) INSTALLATION OF SAGRODS & BRACES ( ) INSTALLATION OF MECHANICAL ROUGHING-INS &
OTHERS
E. CONCRETE WORKS ( ) INSTALLATION OF AIR CONDITIONING UNITS &
( ) CONCRETE POURING ON FOOTINGS CONDENSING UNITS
( ) CONCRETE POURING ON COLUMNS ( ) TESTING/ COMMISSIONING
( ) CONCRETE POURING ON FOOTING TIE BEAM(S)
( ) CONCRETE POURING ON BEAMS & SLABS L. PAINTING/ VARNISHING
( ) CONCRETE POURING ON ROOF BEAMS ( ) PREPARATION ON CONCRETE WALL(S),
( ) CONCRETE POURING ON WALL FOOTINGS COLUMN(S) & BEAM(S)
( ) CONCRETE POURING ON CONCRETE STAIR(S) ( ) APPLICATION OF PRIMER & SEALEAR
( ) CONCRETE POURING ON SEPTIC TANK(S) ( ) FINAL PAINTING
( ) CONCRETE POURING ON WATER TANK(S) ( ) PREPARATION OF WOODEN SURFACES
( ) CONCRETE POURING ON RAIN WATER TANK(S) ( ) INITIAL STAINING AND VARNISHING
( ) CONCRETE POURING ON RETAINING WALL(S) ( ) PAINTING/ VARNISHING OF DOORS & WINDOWS
( ) CONCRETE POURING ON DRIVEWAYS
( ) CONCRETE POURING ON CONCRETE GUTTER M. GENERAL CLEANING
( ) CONCRETE POURING ON PERIMETER FENCE ( ) SITE CLEARING AND CLEANING
( ) CONCRETE POURING ON STAIR(S) ( ) DEMOBILIZATION
( ) WATERPROOFING OF T&B’S
( ) WATERPROOFING OF CONCRETE GUTTER N. DOORS & WINDOWS
( ) INSTALLATION OF DOORS & HARDWARES/
F. MASONRY WORKS ACCESSORIES
( ) INSTALLATION OF CHB’S FOR EXTERIOR WALLS ( ) INSTALLATION OF WINDOWS & ACCESSORIES
( ) INSTALLATION OF CHB’S FOR INTERIOR WALLS ( ) CLEANING OF DOORS & WINDOWS
( ) INSTALLATION OF PRE-CAST WALL PANELS

SUBMITTED BY: CONFORME:

MARC JASON LUA, MARC JOSHUA LUA,


AR. JESSE C. AMARGA, UAP MIKA MARI LUA
PRINCIPAL ARCHITECT NAME & SIGNATURE

DATE: