This construction logbook provides details for a proposed 2-storey residence with fence located in Paradise Village, Cebu City. The owners are listed as Marc Jason Lua, Marc Joshua Lua, and Mika Mari Lua. The logbook outlines the planned scope of works which include excavation, formworks, rebar works, concrete works, masonry works, carpentry works, plumbing works, electrical works, and other miscellaneous tasks like painting, doors and windows installation, and general site cleaning. The logbook is intended to track daily construction activities and manpower for the proposed project.

Uploaded by

Gerard Borbon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
804 views2 pages

Construction Logbook

This construction logbook provides details for a proposed 2-storey residence with fence located in Paradise Village, Cebu City. The owners are listed as Marc Jason Lua, Marc Joshua Lua, and Mika Mari Lua. The logbook outlines the planned scope of works which include excavation, formworks, rebar works, concrete works, masonry works, carpentry works, plumbing works, electrical works, and other miscellaneous tasks like painting, doors and windows installation, and general site cleaning. The logbook is intended to track daily construction activities and manpower for the proposed project.

Uploaded by

Gerard Borbon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
  • Construction Logbook Overview: Summarizes the construction project, including project name, location, and architect details.
  • Conformity and Signatures: Provides space for signatures from the architect and other responsible parties confirming the details of the project.

CONSTRUCTION LOGBOOK

PROJECT: A PROPOSED 2-STOREY RESIDENCE WITH FENCE LOCATION: PARADISE VILLAGE, BARANGAY LAHUG, CEBU CITY

OWNER MARC JASON LUA, MARC JOSHUA LUA, MIKA MARI LUA ADDRESS: PARADISE VILLAGE, BARANGAY LAHUG, CEBU CITY

WEATHER: ( ) SUNNY ( ) FAIR ( ) CLOUDY ( ) RAINY DATE: SHEET NO. OF

MANPOWER: EQUIPMENT:
( ) FOREMAN ( ) CARPENTER ( ) A.C.U INSTALLER ( ) CONCRETE MIXER ( ) BAR CUTTER
( ) PLUMBER ( ) ELECTRICIAN ( ) LABORER ( ) CONCRETE PUMP ( ) PAYLOADER
( ) MASON ( ) PAINTER ( ) WAREHOUSEMAN ( ) BACKHOE ( ) WELDING MACHINE
( ) WELDER ( ) VARNISHER ( ) TILE INSTALLER ( ) TAMPING RAMMER ( ) DEWATERING/ SUMP PUMPS
( ) STEELMAN ( ) TIMEKEEPER ( ) LANDSCAPER ( ) VIBRATOR ( ) FORKLIFT
( ) ELECTRONICS TECHNICIAN & I.T. ( ) GRINDER/ TILE CUTTER ( ) AIR COMPRESSOR WITH JACK HAMMER

SCOPE OF WORKS:
(INTERIOR/EXTERIOR) O. MISCELLANEOUS
A. EXCAVATION ( ) PLASTERING OF WALLS ( ) STAKE – OUT
( ) FOOTINGS FOR COLUMNS & TIE BEAMS ( ) PLASTERING OF COLUMNS ( ) SOIL TREATMENT/ POISONING
( ) FOOTINGS FOR WALLS (ZOCALO) ( ) PLASTERING OF PERIMETER FENCE ( ) INSTALLATION OF TEMPORARY FACILITIES: OFFICE,
( ) FOOTINGS FOR RETAINING WALL(S) ( ) FLOOR TOPPING WAREHOUSE & OTHERS
( ) FOOTINGS FOR CONCRETE STAIR(S) ( ) FLOOR & WALL TILE INSTALLATION(S) ( ) INSTALLATION OF TRELLIS
( ) FOOTINGS FOR WATER TANK(S) ( ) INSTALLATION OF CONCRETE PAVERS ( ) INSTALLATION OF GAS LINES
( ) SEPTIC TANK(S) ( ) SMOOTH FINISHING ON COLUMNS ( ) TESTING OF GAS LINES
( ) RAINWATER TANK(S) ( ) GRANITE/MARBLE INSTALLATION ( ) FABRICATION & INSTALLATION OF GATES & GRILL
( ) DRAINAGE WORKS
( ) SHORING G. CARPENTRY & WOOD WORKS ( ) INSTALLATION OF ROOF UNDERSHEETING/
( ) BACKFILLING ( ) FLOOR JOISTS/ SLEEPER INSTALLATION(S) INSULATION
( ) CEILING JOIST INSTALLATION(S)
B. SCAFFOLDINGS ( ) CEILING BOARD INSTALLATION(S) P. OTHERS
( ) COLUMNS & WALLS ( ) CABINETRY ( ) TURN OVER TO THE OWNER
( ) RETAINING WALL(S) ( ) DOOR INSTALLATION(S) ( ) DEMOLITION
( ) BEAM & SUSPENDED SLAB(S) ( ) INSTALLATION OF DOOR AND WINDOW JAMBS
( ) ROOF BEAMS WITH HEADERS
( ) SEPTIC TANK(S) ( ) T&G FLOOR INSTALLATION
( ) RAINWATER TANK(S)
( ) CONCRETE GUTTER(S) H. PLUMBING WORKS
( ) INSTRALLATION OF ROUGHING-INS: LAY-
C. FORMWORKS OUTING/PIPING
( ) COLUMN(S) ( ) FIXTURE INSTALLATION(S)
( ) BEAMS & SUSPENDED SLAB(S) ( ) DRAINAGE SYSTEM INSTALLATION WITH
( ) ROOF BEAM(S) CATCH BASIN
( ) RETAINING WALLS ( ) CONSTRUCTION OF RAINWATER TANK
( ) CONCRETE STAIR(S) ( ) INSTALLATION OF DOWN SPOUT(S)
( ) CONCRETE GUTTER(S) ( ) INSTALLATION OF WATER LINES (HOT/COLD)
( ) PERIMETER FENCE COLUMN ( ) INSTALLATION OF SOLAR WATER HEATER

D. REBAR WORKS & STEEL WORKS I. ELECTRICAL WORKS


( ) SORTING, PILING, CUTTING & BENDING OF REBARS ( ) INSTALLATION OF ROUGHING-INS:
( ) REBARS FOR FOOTING(S) LAY-OUTING/PIPING
( ) REBARS FOR COLUMN(S) ( ) PANEL BOARD/CB INSTALLATION
( ) REBARS FOR FOOTING TIE BEAM(S) ( ) ELECTRICAL WIRING INSTALLATION(S)
( ) REBARS FOR LINTEL BEAM(S) ( ) FIXTURE INSTALLATION(S)
( ) REBARS FOR BEAMS & SLABS ( ) INSTALLATION OF PERIMETER/ GARDEN
( ) REBARS FOR CANTILEVER BEAMS LIGHTING(S)
( ) REBARS FOR WALL FOOTING (ZOCALO) ( ) TESTING/ COMMISIONING
( ) REBARS FOR CONCRETE STAIR(S)
( ) REBARS FOR SLAB ON-FILL J. ELECTRONICS
( ) REBARS FOR PERIMETER FENCE ( ) INSTALLATION OF ROUGHING-INS: PIPING & UTILITY
( ) REBARS FOR EXTERIOR WALLS BOXES, ETC.
( ) REBARS FOR INTERIOR WALLS ( ) INSTALLATION OF TELECOMMUNICATION SYSTEM
( ) REBARS FOR SEPTIC TANK(S) ( ) INSTALLATION OF SECURITY & ALARM SYSTEM
( ) REBARS FOR WATER TANK(S) ( ) INSTALLATION OF BUILDING AUTOMATION SYSTEM
( ) REBARS FOR RAINWATER TANK(S) ( ) INSTALLATION OF SOUND COMMUNICATION SYSTEM
( ) STEEL TRUSS/ RAFTER FABRICATION ( ) INSTALLATION OF OTHER ELECTRONICS & I.T SYSTEM
( ) GRILLS & HANDRAILS ( ) TESTING/ COMMISIONING
( ) REBARS FOR RETAINING WALL(S)
( ) REBARS FOR CONCRETE GUTTER K. MECHANICAL
( ) INSTALLATION OF SAGRODS & BRACES ( ) INSTALLATION OF MECHANICAL ROUGHING-INS &
OTHERS
E. CONCRETE WORKS ( ) INSTALLATION OF AIR CONDITIONING UNITS &
( ) CONCRETE POURING ON FOOTINGS CONDENSING UNITS
( ) CONCRETE POURING ON COLUMNS ( ) TESTING/ COMMISSIONING
( ) CONCRETE POURING ON FOOTING TIE BEAM(S)
( ) CONCRETE POURING ON BEAMS & SLABS L. PAINTING/ VARNISHING
( ) CONCRETE POURING ON ROOF BEAMS ( ) PREPARATION ON CONCRETE WALL(S),
( ) CONCRETE POURING ON WALL FOOTINGS COLUMN(S) & BEAM(S)
( ) CONCRETE POURING ON CONCRETE STAIR(S) ( ) APPLICATION OF PRIMER & SEALEAR
( ) CONCRETE POURING ON SEPTIC TANK(S) ( ) FINAL PAINTING
( ) CONCRETE POURING ON WATER TANK(S) ( ) PREPARATION OF WOODEN SURFACES
( ) CONCRETE POURING ON RAIN WATER TANK(S) ( ) INITIAL STAINING AND VARNISHING
( ) CONCRETE POURING ON RETAINING WALL(S) ( ) PAINTING/ VARNISHING OF DOORS & WINDOWS
( ) CONCRETE POURING ON DRIVEWAYS
( ) CONCRETE POURING ON CONCRETE GUTTER M. GENERAL CLEANING
( ) CONCRETE POURING ON PERIMETER FENCE ( ) SITE CLEARING AND CLEANING
( ) CONCRETE POURING ON STAIR(S) ( ) DEMOBILIZATION
( ) WATERPROOFING OF T&B’S
( ) WATERPROOFING OF CONCRETE GUTTER N. DOORS & WINDOWS
( ) INSTALLATION OF DOORS & HARDWARES/
F. MASONRY WORKS ACCESSORIES
( ) INSTALLATION OF CHB’S FOR EXTERIOR WALLS ( ) INSTALLATION OF WINDOWS & ACCESSORIES
( ) INSTALLATION OF CHB’S FOR INTERIOR WALLS ( ) CLEANING OF DOORS & WINDOWS
( ) INSTALLATION OF PRE-CAST WALL PANELS

SUBMITTED BY: CONFORME:

MARC JASON LUA, MARC JOSHUA LUA,


AR. JESSE C. AMARGA, UAP MIKA MARI LUA
PRINCIPAL ARCHITECT NAME & SIGNATURE

DATE: