Professional Documents
Culture Documents
PROJECT: A PROPOSED 2-STOREY RESIDENCE WITH FENCE LOCATION: PARADISE VILLAGE, BARANGAY LAHUG, CEBU CITY
OWNER MARC JASON LUA, MARC JOSHUA LUA, MIKA MARI LUA ADDRESS: PARADISE VILLAGE, BARANGAY LAHUG, CEBU CITY
MANPOWER: EQUIPMENT:
( ) FOREMAN ( ) CARPENTER ( ) A.C.U INSTALLER ( ) CONCRETE MIXER ( ) BAR CUTTER
( ) PLUMBER ( ) ELECTRICIAN ( ) LABORER ( ) CONCRETE PUMP ( ) PAYLOADER
( ) MASON ( ) PAINTER ( ) WAREHOUSEMAN ( ) BACKHOE ( ) WELDING MACHINE
( ) WELDER ( ) VARNISHER ( ) TILE INSTALLER ( ) TAMPING RAMMER ( ) DEWATERING/ SUMP PUMPS
( ) STEELMAN ( ) TIMEKEEPER ( ) LANDSCAPER ( ) VIBRATOR ( ) FORKLIFT
( ) ELECTRONICS TECHNICIAN & I.T. ( ) GRINDER/ TILE CUTTER ( ) AIR COMPRESSOR WITH JACK HAMMER
SCOPE OF WORKS:
(INTERIOR/EXTERIOR) O. MISCELLANEOUS
A. EXCAVATION ( ) PLASTERING OF WALLS ( ) STAKE – OUT
( ) FOOTINGS FOR COLUMNS & TIE BEAMS ( ) PLASTERING OF COLUMNS ( ) SOIL TREATMENT/ POISONING
( ) FOOTINGS FOR WALLS (ZOCALO) ( ) PLASTERING OF PERIMETER FENCE ( ) INSTALLATION OF TEMPORARY FACILITIES: OFFICE,
( ) FOOTINGS FOR RETAINING WALL(S) ( ) FLOOR TOPPING WAREHOUSE & OTHERS
( ) FOOTINGS FOR CONCRETE STAIR(S) ( ) FLOOR & WALL TILE INSTALLATION(S) ( ) INSTALLATION OF TRELLIS
( ) FOOTINGS FOR WATER TANK(S) ( ) INSTALLATION OF CONCRETE PAVERS ( ) INSTALLATION OF GAS LINES
( ) SEPTIC TANK(S) ( ) SMOOTH FINISHING ON COLUMNS ( ) TESTING OF GAS LINES
( ) RAINWATER TANK(S) ( ) GRANITE/MARBLE INSTALLATION ( ) FABRICATION & INSTALLATION OF GATES & GRILL
( ) DRAINAGE WORKS
( ) SHORING G. CARPENTRY & WOOD WORKS ( ) INSTALLATION OF ROOF UNDERSHEETING/
( ) BACKFILLING ( ) FLOOR JOISTS/ SLEEPER INSTALLATION(S) INSULATION
( ) CEILING JOIST INSTALLATION(S)
B. SCAFFOLDINGS ( ) CEILING BOARD INSTALLATION(S) P. OTHERS
( ) COLUMNS & WALLS ( ) CABINETRY ( ) TURN OVER TO THE OWNER
( ) RETAINING WALL(S) ( ) DOOR INSTALLATION(S) ( ) DEMOLITION
( ) BEAM & SUSPENDED SLAB(S) ( ) INSTALLATION OF DOOR AND WINDOW JAMBS
( ) ROOF BEAMS WITH HEADERS
( ) SEPTIC TANK(S) ( ) T&G FLOOR INSTALLATION
( ) RAINWATER TANK(S)
( ) CONCRETE GUTTER(S) H. PLUMBING WORKS
( ) INSTRALLATION OF ROUGHING-INS: LAY-
C. FORMWORKS OUTING/PIPING
( ) COLUMN(S) ( ) FIXTURE INSTALLATION(S)
( ) BEAMS & SUSPENDED SLAB(S) ( ) DRAINAGE SYSTEM INSTALLATION WITH
( ) ROOF BEAM(S) CATCH BASIN
( ) RETAINING WALLS ( ) CONSTRUCTION OF RAINWATER TANK
( ) CONCRETE STAIR(S) ( ) INSTALLATION OF DOWN SPOUT(S)
( ) CONCRETE GUTTER(S) ( ) INSTALLATION OF WATER LINES (HOT/COLD)
( ) PERIMETER FENCE COLUMN ( ) INSTALLATION OF SOLAR WATER HEATER
DATE: