Case-II - Rescue tunnel with same dimensions as main tunnel, with option for accommodating a
BG track (doubling)

289
Case –III-Main tunnel with parallel safety and service tunnel

Case – IV -Main tunnel with 9 adits (lateral egress) at every 1000m

290
Final Decision on safety scheme of Tunnel-12 of Tupul-Imphal:
Considering Techno-economic consideration option III (Main tunnel with parallel safety /service
tunnel= 9.3km ) adopted. The main tunnel and parallel safety tunnel will be connected through Cross
passages at every 500m. The Cross nish section area of the main tunnel is 38.2 SQM and safety
tunnel is 18.0 SQM

Tunnel cross section of Tunnel 12