Case-II - Rescue tunnel with same dimensions as main tunnel, with option for accommodating a
BG track (doubling)
289
Case –III-Main tunnel with parallel safety and service tunnel
290
Final Decision on safety scheme of Tunnel-12 of Tupul-Imphal:
Considering Techno-economic consideration option III (Main tunnel with parallel safety /service
tunnel= 9.3km ) adopted. The main tunnel and parallel safety tunnel will be connected through Cross
passages at every 500m. The Cross nish section area of the main tunnel is 38.2 SQM and safety
tunnel is 18.0 SQM