Espacios Subterráneos
18 de noviembre de 2013
Davorin Kolic
Project Manager Alto Maipo
www.cdt.cl 47 páginas
Davorin KOLIC
ITA-AITES Executive Council Member
Professional :
22 years of international tunnelling experience, work in 25 countries
Managing director of GEODATA Austria GmbH / Geodata Tunel doo, Croatia
Scientific / Lecturing :
105 scientific articles, coauthor: 1 book, 2 guidelines; 5 times editor of proceed. or books
Lectures on Master Study for TBM tunnelling on Politechnico Torino, Italy
Geological formations :
Sable du Beauchamp
Marne et caillases
Calcier grossier =
POLYSHIELD TBM
1. Urban tunnelling
First
application of
plastic dowels
and guiding
rods
First
systematic
application of
sprayed
steel fibre
Paris EOLE Lot 35 B shotcrete
Tunnelling in the city centre
1. Urban tunnelling
• Vertikal alignment :
Curve of 2500 m radius
1 km
• Horizontal alignment :
Curve of 1000 m radius
•Alternative solution :
Pipe-jacked tunnel vs.
NATM and TBM options that were
foreseen in the tender
1. Urban tunnelling
Placing TBM
in start shaft
Pipe jacking
from the start
shaft by
jacking unit
1. Urban tunnelling
Stuttgart 21 Project
High Speed Rail Axis Paris-Budapest
NBS Stuttgart-Wendlingen-Ulm
High Speed Rail Axis Paris-Budapest
Semmering Tunnel
Pontebana Rail, Baltic – Adria Axis
Koralm Tunnel
Pontebana Rail, Baltic – Adria Axis
Costs (2010):
5.2 bill. EUR
(no financing costs included,
approx. 2.6 bill. €)
2. High speed rail line projects
Koralm Tunnel
Pontebana Rail, Baltic – Adria Axis
Plan costs
incl. Unforeseen, Plankosten gesamt
exclusive :
-4,52 % +4,55%
nicht enthalten:
G - unexpect.
Marktpreisschw ankungen
Bauaufsicht
V - unknown
Kurve Basiskosten
700 720 740 760 780 800 820 840 860 880 900
[Plankosten in mio €]
2. High speed rail line projects
WYRDP Lot I
3. Hydro projects
WYRDP Lot I
Shafts 200 m deep
in limestone
Excavation :
drill-and-blast
Mucking :
manually
4.4.Hydro
Hydroprojects
projects
WYRDP
Lot I
Caverns :
180 m long
45 m high
20 m wide
in limestone
Excavation :
drill-and-blast
Mucking :
baggers
loaders
3. Hydro projects
Best Day 99.37 28-Feb-00 81.04 2/21/00 87.71 11-Dec-00 85.06 5-Dec-00
Best Month 1821.49 Feb-00 1407.57 Feb-01 1625.21 Jan-01 1323.98 Nov-00
3. Hydro projects
TBM :
Double-shield
3 Robbins
1 NFM
Lining :
Segmental honeycomb
3. Hydro projects
Capacity : 35 MW
Costs : 110 mill USD$
Purpose : multi purpose (e,w)
Environment : protective
3. Hydro projects
Rock :
dolomite, limestone
Water :
underground water
reservoirs
Catchment area :
700 km²
Coast :
Flysch barrier
3. Hydro projects
Underground
dam :
by injection
wall
No dam
visible
Protecting
environment
3. Hydro projects
Water filling
facility :
export to middle
east countries
4. Activities of ITA_AITES in SEE
SPLIT port
first solutions for crossing the Split port
Lora for road connection west-east
PELJEŠAC CROSSING
Connection Land toward
penisula Pelješac and
connection to Dubrovnik
4. Activities of ITA_AITES in SEE
Symposium
ZAGREB UNDERGROUND
Zagreb, Croatia, March 27-28, 2014
4. Activities of ITA_AITES in SEE
FLOATING TUNNELS
Norwegian Public Roads Administration (MOVIE)
St. Barbara , December 4, 2007
shaft bottom of Graz
railway stution tunnel project