You are on page 1of 12

PROFILE

Name : Muhammad Fadhlan


Place of Birth : Jakarta
th
Date of Birth : August 12 , 1991
Address : BUKIT PERMAI BLOK N 17 Serang – Banten
Nationality : INDONESIA
Status : Married
Mobile Phone : +62 813 1095 6138
E – Mail Address : m_vadhlan91@yahoo.com

FORMAL EDUCATION
1. SMAN 1 Serang (2009)
2. SMPN 1 Serang (2006)
3. SDN 7 Serang (2003)

COMPETENCY AND TRAINING

Experience Blasting , Painting / Coating For Oil And Gas Industry


And Expertise And Others
Professional 1. BGAS CSWIP Painting Inspector Grade 2
Certification/ 2. Certified Of Coating Inspector (level 2) from Lembaga
Competency Sertifikasi Profesi Coating Indonesia
3. Certified Of Coating Inspector (level 1) from
Lembaga Sertifikasi Profesi Coating Indonesia
Training/ Course / 1. BGAS CSWIP Painting Inspector Grade 2
Seminar/ 2. Coating Inspector Training (level 2) — ASCOATINDO
Awareness 3. Coating Inspector Training (Level 1) —
ASCOATINDO
4. Blasting & Coating Training — JOTUN (2013)
5. Awareness Training Of MS ISO 9001:2008 — Bakrie
Construction
6. Awareness Training Of MS ISO 14001:2004 — Bakrie
Construction
7. Awareness Training Of MS OHSAS 18001: 2007 —
Bakrie Construction
8. Lean Six Sigma Yellow Belt Training — Bakrie
Construction
9. Working At Height Training — Bakrie Construction
10. Confined Space Entry Training — Bakrie Construction
LANGUAGES AND PROFECIENCY

Language Speaking Writing Reading


English Good Good Good

EMPLOYMENT RECORD
COUNTRIES OF WORK EXPERIENCE INDONESIA

Employer: PT. Bakrie Construction ( 2013 – 2018)


PT. Gunanusa Utama Fabricators (2019-2020)
PT. Meindo Elang Indah (2021 – 2022)
PT. Gunanusa Utama Fabricators (2022-2023)

Position Held 1. Blasting & Painting Assistant


2. Blasting & Painting Inspector Level 1
3. Blasting & Painting Inspector Level 2 (Current position)
Description Of Duties 1. Assist Painting Supervisor To Close Monitoring
2. Blasting & Painting Activity At Workplace
3. Ensure Blasting & Panting Activity Is Performed As Per
Client Specification And Code Standard
4. To Conduct And Prepare Material Abrasive Inspection
Report
5. To Conduct And Prepare Painting Qualification Test (PQT)
Report
6. To Conduct And Prepare Blasting & Painting Inspection
Report
7. To Make Coordination & Communication With Other Party
Related To Blasting & Panting Activity Matter
Project Involved Fabrication And Construction Of Banyu Urip EPC 3
Project Offshore Pipe Line And Mooring Tower —
Mobil Cepu Limited (MCL) Project
Fabrication And Construction Of ASTI A & MILA A
Platform And Pipeline- CNOOC Project, On Shore
Fabrication And Construction Of UL Development
Project - PHE-ONWJ Project,
Fabrication Of Sisi Nubi Phase 2B And PECIKO
Phase, 7B Development - GUF-TOTAL Project
Fabrication And Construction Service For KE 38, KE
39 And KE 54 — PHE WMO Project
Fabrication And Construction Service For Jacket MBH
& MDA — HCML Project.
Cooling Water Pipe Central Java – Mitsui Engineering
And Shipbuilding
Bukit Tua Phase 2B Project, Wellhead Platform and
Subsea Pipelines ( Offshore )
Zawtika Z1D for WHP 12, WHP 13, WHP 14, WHP 15
(Onshore and Offshore)
Best Regard,
Muhammad Fadhlan
.. -II

~~~/;'~': '.; .!,:.

y. . , ,

You might also like