INDUSTRIAL TRAINING SESSION

2: 2021/ 2022
CIVIL ENGINEERING
DEPARTMENT
(7 MAC 2022 - 22 JULY 2022)

NAME: HAVIRRNA A/ P ANBALAG


AN

REGISTARTION NUMBER : 16DKA19


F1142

NAME OF THE COMPANY : SPK A


SAS SDN.BHD

ADDRESS : 26, JALAN PERUSAHA


COMPANY
BACKGROUND
Year 2000 - Building and remodelling company called Everwell
SPK ASAS Construction was founded and currently known as SPK ASAS SDN.BHD
SDN.BHD and Mr. Ooi Chee Keong is the firm's managing director, and this
company was founded on his decades of expertise in the construction
sector.

Loc a tion : Loc a ted


at
Lorong

Perusa ha a n Sunga i
Loka n
nea r
J a la n
Bagan Lalang.
Registra tion num ber : 200601014212 ( 0733963-W )
Cidb gred : G7
Type of practice: Construction & Building

SPK ASAS SDN BHD has worked on several construction projects, some
of them are:
Mulpha Properties Sdn.Bhd
Airmas Development Sdn
Activities of the organization are:

i. Construction and building projects

ii. Civil engineering projects

iii. All types of architectural projects

iv. Property development services

v.Providing construction management services on manufacturing facilities, residential, commercial, wastewater


treatment plants, and electrified double trucking in Malaysia.

Electrified Double Tracking Project North


- Pedestrian Motorcycle Bridge PMB1
- Development by MMC Gamuda
Joint Venture

Electrified Double Tracking Project -


BM Depot - Development by MMC
Gamuda Joint Venture

Taman Kenangan, Kulim - Development by Taman Seri Bayu, Nibong Tebal - Development
Airmas Group by Mulpha Properties Bhd
There are some of the Spk Asas Sdn Bhd’s current project lists:
1. Factory & Office at Kws Perindustrian Batu Kawan - Development by Iconic Medicare Sdn. Bhd.
2. Mahkamah Baharu Kangar, Perlis - Development by Jabatan Kerja Raya
3.Three Storey Fa ctory a t J a la n Perma ta ng Tinggi, Pena ng - Development by Chin
Ma h Development Sdn Bhd.

There are some of the Spk Asas Sdn Bhd’s completed project lists:
1.TNB Sub Station at Batu Kawan, Penang - Development by Lam Research International Sdn Bhd
2. Electrified Double Tracking Project - BM Depot - Development by MMC Gamuda Joint Venture
3.Electrified Double Tracking Project North - Pedestrian Motorcycle Bridge PMB1 - Development by
MMC Gamuda Joint Venture
INDUSTRIAL TRAINING IN
WELLSPRING PROJECT
Wellspring condominium which located at Lorong Kubur,
Butterworth.

Site organization chart of Wellspring


project
SITE PLAN OF WELLSPRING BEFORE ENTER THE
PROJECT SITE SAFETY
FIRST!
VIEW 4
VIEW 3

VIEW 2
VIEW 1
CURRENT WORKING PROGRESS OF
PROJECT
JOB RESPONSBILITIES DURING INDUSTRIAL
TRAINING
INSPECTIO PROGRESS
N REPORT

Job
Responsbilities

COLLECTING DAILY SITE


D/O REPORT
CHECKING
PRINT &
MANPOWER
PHOTOSTAT

Job
Responsbilities
CASTING
SLUMP TEST & CUBE
REPORT
TEST
INSPECTIO
N
Introduction

Throughout the life of a project, inspections will be performed for a variety of reasons. Building control inspections are carried
out to verify compliance with the building regulations. These can be carried out by a local authority building control inspector
or by an approved inspector. Inspections ma y be required for:

Excavations, before filling.


Foundations before covering
up. New drains before covering
up.
Ground beams and rebar
work. Completion.

It is important that inspection timing and frequency are properly organized, that proper reports are prepared, and that action
is taken if necessary. Inspection reports might contain the following information:

i. Details of the person the inspection was carried out for.


ii.Location of the inspection.
iii.Date and time of the inspection.
iv. Description of the nature of the inspection.
v. Details of any action taken.
vi. Details of any further action required.
Objective of the inspection :
To provide the client with objective, independent, and unbiased information about the condition of the building's systems
To check the components that are defective and require immediate attention or are expected to have a negative impact
on the building

Procedure for conducting a site inspection :

1. Ensure that the inspector has all of the equipment necessary to conduct a comprehensive
inspection. A measuring tape
Wearing safety boots and safety helmets Site
plan information

To prepare for a site inspection, good document management is essential. Inspectors must have access to the most recent
drawings to work from, which they can use to plan out the inspection and develop a checklist.

Once the preparation has been completed, an inspector will then be required to walk the site to make sure that everything
has been built to the specifications laid out in the plans and drawings.

The inspection checklist should be consulted to ensure all work has been done as planned, within safety regulations, and up
to the quality standards expected.
My job responsibilities during the inspection :
The site inspec tion will oc c ur onc e or twic e a week a c c ording to the working progress. My job responsibility during the
inspection is as follows:
a) Checked with the supervisor about the inspection schedule.
b) Prepared the site plans before the consultant visits the site
c) Ask the manpower to clear the place before the inspection
d) Help the consultant during an inspection by to referring the plans
e) Following the inspection, the consultant will be asked to sign the logbook.
f) Hand over the inspection logbook to the supervisor.
Figure shows the inspection of
column

Figure shows the inspection of the beam and


slab
D ATE SIGN ATURE

REMARKS
LOCATION
CONCLU
SION
I believe that this training program provides us with a fantastic opportunity to receive
hands-on experience and learn things that we would not have learned if we went straight
into a career. I a m appreciative of the opportunity provided by the Polytechnic Tuanku
Sultanah Bahiyah and SPK ASAS Sdn Bhd. To summarize, industrial training is an excellent
program that can help students become more qualified in the fields they desire today.
Throughout my industrial training, I also experienced how the genuine atmosphere in the
workplace and the positive relationships that aid each other help and work together.
APPENDI
X
WEATHER DAILY SITE
PALNT & EQUIPMENT
REPORT
MANPOWER STAFF
REPORT
MANPOWER REPORT
CASTING REPORT
TOOLBOX MEETING

TOWER CRANE LOCK-UP

INTERLOACKING

SOIL EXCAVATION

PRODUCTS DELIVERY

LASER MEASURING
LEVEL