(7 MAC 2022 - 22 JULY 2022)
Perusa ha a n Sunga i
Loka n
nea r
J a la n
Bagan Lalang.
Registra tion num ber : 200601014212 ( 0733963-W )
Cidb gred : G7
Type of practice: Construction & Building
SPK ASAS SDN BHD has worked on several construction projects, some
of them are:
Mulpha Properties Sdn.Bhd
Airmas Development Sdn
Activities of the organization are:
Taman Kenangan, Kulim - Development by Taman Seri Bayu, Nibong Tebal - Development
Airmas Group by Mulpha Properties Bhd
There are some of the Spk Asas Sdn Bhd’s current project lists:
1. Factory & Office at Kws Perindustrian Batu Kawan - Development by Iconic Medicare Sdn. Bhd.
2. Mahkamah Baharu Kangar, Perlis - Development by Jabatan Kerja Raya
3.Three Storey Fa ctory a t J a la n Perma ta ng Tinggi, Pena ng - Development by Chin
Ma h Development Sdn Bhd.
There are some of the Spk Asas Sdn Bhd’s completed project lists:
1.TNB Sub Station at Batu Kawan, Penang - Development by Lam Research International Sdn Bhd
2. Electrified Double Tracking Project - BM Depot - Development by MMC Gamuda Joint Venture
3.Electrified Double Tracking Project North - Pedestrian Motorcycle Bridge PMB1 - Development by
MMC Gamuda Joint Venture
INDUSTRIAL TRAINING IN
WELLSPRING PROJECT
Wellspring condominium which located at Lorong Kubur,
Butterworth.
VIEW 2
VIEW 1
CURRENT WORKING PROGRESS OF
PROJECT
JOB RESPONSBILITIES DURING INDUSTRIAL
TRAINING
INSPECTIO PROGRESS
N REPORT
Job
Responsbilities
Job
Responsbilities
CASTING
SLUMP TEST & CUBE
REPORT
TEST
INSPECTIO
N
Introduction
Throughout the life of a project, inspections will be performed for a variety of reasons. Building control inspections are carried
out to verify compliance with the building regulations. These can be carried out by a local authority building control inspector
or by an approved inspector. Inspections ma y be required for:
It is important that inspection timing and frequency are properly organized, that proper reports are prepared, and that action
is taken if necessary. Inspection reports might contain the following information:
1. Ensure that the inspector has all of the equipment necessary to conduct a comprehensive
inspection. A measuring tape
Wearing safety boots and safety helmets Site
plan information
To prepare for a site inspection, good document management is essential. Inspectors must have access to the most recent
drawings to work from, which they can use to plan out the inspection and develop a checklist.
Once the preparation has been completed, an inspector will then be required to walk the site to make sure that everything
has been built to the specifications laid out in the plans and drawings.
The inspection checklist should be consulted to ensure all work has been done as planned, within safety regulations, and up
to the quality standards expected.
My job responsibilities during the inspection :
The site inspec tion will oc c ur onc e or twic e a week a c c ording to the working progress. My job responsibility during the
inspection is as follows:
a) Checked with the supervisor about the inspection schedule.
b) Prepared the site plans before the consultant visits the site
c) Ask the manpower to clear the place before the inspection
d) Help the consultant during an inspection by to referring the plans
e) Following the inspection, the consultant will be asked to sign the logbook.
f) Hand over the inspection logbook to the supervisor.
Figure shows the inspection of
column
REMARKS
LOCATION
CONCLU
SION
I believe that this training program provides us with a fantastic opportunity to receive
hands-on experience and learn things that we would not have learned if we went straight
into a career. I a m appreciative of the opportunity provided by the Polytechnic Tuanku
Sultanah Bahiyah and SPK ASAS Sdn Bhd. To summarize, industrial training is an excellent
program that can help students become more qualified in the fields they desire today.
Throughout my industrial training, I also experienced how the genuine atmosphere in the
workplace and the positive relationships that aid each other help and work together.
APPENDI
X
WEATHER DAILY SITE
PALNT & EQUIPMENT
REPORT
MANPOWER STAFF
REPORT
MANPOWER REPORT
CASTING REPORT
TOOLBOX MEETING
INTERLOACKING
SOIL EXCAVATION
PRODUCTS DELIVERY
LASER MEASURING
LEVEL