You are on page 1of 21

CURRICULUM VITAE

Position
ALINURDIN, A.Md. Dimensional QC Inspector

MY CONTACT SUMMARY OF EXPERIENCE


I have more than 3 Years Experience in field Inspection QC
0821-7379-3343
Dimensional control for Oil and Gas. Deep knowledge in technical
Alinurdin290693@gmail.com survey / Dimensional check with calculation and reporting data survey
use AutoCAD, Spatial Analyzer (SA), Rhinoceros, Topco, Calculo etc.
Alinurdin61@yahoo.com Capable to operate equipment’s electronic total station (any type) such
as Leica Lazer Tracker and Leica Total Station. Have involved in various
JL. Sungai Lakam RT 005 RW
tremendous projects in fabricator installation Process Jacket structural,
003 Kel. Sungai Lakam Timur
Topside, Deck, Pipe Rack and installation Process Subsea structural.
Kec. Karimun, Kab. Karimun

PERSONAL DATA
LANGUAGE SKILL Name : ALINURDIN, A.Md.
Place, Date of birth : Tanjung Balai Karimun, June 29, 1993
Bahasa Indonesia: Excellent
Gender : Male
English : Average
Marital Status : Married
Religion : Islam
Nationality : Indonesian

FORMAL EDUCATION

2011 – 2014 University


Akademi Teknologi Industri Padang (ATIP) Diploma III
Teknik Industri- Sumatra Barat, IPK: 3,12
2008 - 2011 Senior High School
SMK Negeri 1 Karimun
2005 – 2009 Junior High School
SMP Negeri 1 Tebing Karimun
1999 - 2005 Elementary School
SD Negeri 006 Tanjung Balai Karimun
Page 1 of 21
INDIVIDUAL SKIIL
Computer Software and Instrument Handled :

 Software
1. Microsoft Office
2. AutoCAD 2D and 3D
3. Rhinoceros
4. Spatial Analyzer
5. Topko
 Absolute Tracking and Scanning
1. Leica At 403
2. Leica Ats 600

 Total Stations and Auto Level


- Leica Total Station TDRA 6000, TS 60, MS 50, TS 16, TS 15, TS 07, TS 06

QUALIFICATION
Personal Certification Certificate Number

Certificate of Attendance JLS/311220/002/0016


Certified Coating Inspector AM-183-2016
Certificate of Attendance 2958/IPI/I/2016
Pelatihan Teknologi Pengelasan 557.1/SJ-IND-6.6/VI/2013

WORK EXPERIENCES
 PT. Saipem Indonesia Karimun Branch
Period : 01 July 2020 – 30 September 2023
Position : Dimensional QC Inspector
Duties & Responsibility : - Performs DC Inspection and Surveys Before Welding and
After Welding
- Analyze and calculate DC measurement result
- Prepare DC report and Documents
- Issue Acceptance/Rejection surveillance reports reflecting
actual dimensions against approved engineering drawing
and allowable tolerances as required in client specification
or codes/standards
- Maintenace DC surveys equipments and tools
Page 2 of 21
 Project : Scarborough - ETL Coating and Installation - Execute
Position : Dimensional QC Inspector Junior
Client : WOODSIDE ENERGY LTD
Yard : Saipem Yard, Karimun Kepri – Indonesia

 Project : EPC for North Field Production Sustainability (NFPS)


Position : Dimensional QC Inspector Junior
Client : QATARGAS OPERATIONG COMPANY Ltd
Yard : Saipem Yard, Karimun Kepri – Indonesia

 Project : NnG (Neart na Gaoithe) Offshore Wind


Position : Asst Dimensional QC Inspector
Client : EDF Renewable
Yard : Saipem Yard, Karimun Kepri – Indonesia

 Project : FORMOSA II Offshore Wind Farm


Position : Asst Dimensional QC Inspector
Client : DNV.GL
Yard : Saipem Yard, Karimun Kepri – Indonesia

 Project : TORTUE DEVLOPMENT PROJECT


Position : Asst Dimensional QC Inspector
Client : BP Mauritania Investment Ltd
Yard : Saipem Yard, Karimun Kepri – Indonesia

 PT. Saipem Indonesia Karimun Branch


Period : 24 February 2020 – 30 June 2020
Position : Apprenticeship Student
Project : TORTUE DEVLOPMENT PROJECT
Client : BP Mauritania Investment Ltd
Yard : Saipem Yard, Karimun Kepri – Indonesia

 PT. SMOE Indonesia, Batam


Period : 26 September 2019 – 29 February 2020
Position : Material Control Blasting Painting

 Project : HORNSEA II JACKET

Page 3 of 21
Position : Material Control Blasting Painting
Yard : Kabil, Batam Kepri – Indonesia

 Project : HORNSEA II TOPSIDE


Position : Material Control Blasting Painting
Yard : Kabil, Batam Kepri – Indonesia

 PT. Trijaya Kencana Tenik – Vpower Group


Period : 19 January 2018 – 18 July 2018
Position : Operator Personel
Project : PLTG 5 MW Karimun
Yard : Karimun Kepri – Indonesia

 PT. Saipem Indonesia Karimun Branch


Period : 19 October 2015 – 31 August 2017
Position : Helper Material Control

 Project : EPSCC of Two Converted FPSO (North & South)


Position : Helper Material Control
Client : Total E&P Angola
Yard : Saipem Yard, Karimun Kepri – Indonesia

 Project : Jangkrik Complex Project-FPU


Position : Helper Material Control
Client : ENI Muara Bakau B.V
Yard : Saipem Yard, Karimun Kepri – Indonesia

Page 4 of 21
Page 5 of 21
Page 6 of 21
Page 7 of 21
Page 8 of 21
Page 9 of 21
Page 10 of 21
Page 11 of 21
Page 12 of 21
Page 13 of 21
Page 14 of 21
Page 15 of 21
Page 16 of 21
Page 17 of 21
Page 18 of 21
Page 19 of 21
Page 20 of 21
Page 21 of 21

You might also like