1 Provisional Sum
Procument Item Details
SL.
No Item Description Unit Quantity
1 Preparation of as built Architetectural, Structure, Sanitary & PS 1.0
2 Electrical drawing
(a) Insurance as per
premium forinstruction
the work, all complete.
plant and materials damage PS 1.0
3 for contract work for all risk including Riot, Strike, material
Carrying out diferrent laboratory tests of construction PS 1.0
like cement, rod, bricks, sand, aggregate, filling materials,
2 Construction work
Procument Item Details
SL. Bidder's Rate
No Item Description Unit Quantity (NPR)
Provide, erect and maintain project
site notice boards (plane CGI sheet of
1mx1m mount with 1/2" black sq black iron
1 pipe.on its back with 2 number of 1.5" sq ls 1.0
pipe post of 2 m above GL) as per insruction
of Site engineer and specification all
complete.
ManholeConstruction of brick
masonry Sewer manhole of size
800*800*800 mm with 230mm thick brick
masonry in 1:4 cement mortar, including
83 set 51.0
punning in 1:1 cement sand with work all
complete as per instruction of Engineer and
Specification.
Design,fabrication,assembling,supply,
installation and commissioning of Cable
Trench of size W 12''x D 2'' made out of
Galvanised Steel with Strong support
90 Rm 12.0
System.Make:-Legrand Cablofil or Eqvt
with all necessary accessories; screws,
gripes, nut bolt, clamp etc all complete.
Design,fabrication,assembling,supply,
installation and commissioning of 6'' HDPE
polythene pipe with necessary junction (12
no of T joint) for Cable supply to DBs from
91 Rm 25.0
MDB via electrical duct with all necessary
accessories; screws, gripes, nut bolt, clamp
etc all complete.
VAT
Grand Total
antities
Unit Rate(NPR) Amount(NPR)
96445.0 96,445.00
1099269.73 1,099,269.73
87464.0 87,464.00
Details
1. Earth work in excavation in soft clay/silt including 10m hauling, disposing & 1.5m
Resources Level/Type Quantity Unit Rate per Amount
Unit
Labours: Coolies 0.700 Nos. Err:509 Err:509
Tools & Equipments 3% of total labour cost Err:509
Actual rate
Rate 15% contractor's overhead
Per cum. Per cft. Total
Err:509 Err:509
timbering, pumping out water from the
excavated clean & grub of soil in
fication complete work (Machine 70%)
(1cu.m./35.28 cft)