Install water mater for internal use of the client. Water meter shall be
1.5 supplied by the client. Prices shall includes all accessories and ancillary
works required to install the water mater.
Demolish ceramic floor tiles in room no 105 and verandah at first floor
2.1 and hand over demolished ceramics tile to the client. Price shall include
castaway of chiseled material.
Supply and lay non-slippery porcelain ceramic floor tile of size 600
x600 x12mm for First Floor( Room 105) the same as previously bedded
2.2 in 1:3 cement to sand mortar. Price shall include chiseling of slab and
ancillary works required to complete the work.
2.3 Ditto Item No-2.2 but at 1st floor Verandah
lay dismanteled ceramic porcelain ceramic floor tile of size 600 x600
x12mm for First Floor( Room 105) the same as previously bedded in
2.4 1:3 cement to sand mortar. Price shall include chiseling of slab and
ancillary works required to complete the work.
2.5 Glazing
b) 5mm thick figured glass for door at ground floor near to staircase
and window at Third Floor.
Supply and fix SHS 20x20x1.5 mm thick metal safety grille with 12
cm c/c spacing on ground floor metal door size 250x135cm near to
2.6 staircase. Price shall include one coat of anti rust paint and three
coat of synthetic enamel paint similar color to existing frame and all
accessories and ancillary works required to complete the work.
Provide a door latch(a bar that can be lowered or slide into hole on
floor) on bottom of door at graound floor near to staircase with hole
2.6
on floors. Price shall include all accessories and ancillary works
required to complete the work.
Aluminum Partition
Supply and fix 45 series andoized aluminum profiles(silver color) of
AA6063 Norm EN 573-3/EN 755-2-EN 755-2EN 755&EN 120220:
2.7 tensile strength 215N/mm2: average thicnkess of andoizing layer
on a single component not less than 15 micron.The panel shall be
high pressure laminated panel EPDM rubber best quality iron
monger.
2.8 Cart away all surplus material not exceeding 2km from the site.
AWASH INTERNATIONAL BANK
ANCH OFFICE BUILDCING MAINTENANCE WORKS
Unit Quantity Rate Amount
Total 116,415.69
VAT(15%) 17,462.35
Grand Total 133,878.04
Remark
Demolishing works
b) Forth floor internal HCB wall of hall where PVC door will
be fixed. M2 3.00 100 300.00
a) Forth floor hall(600x600x8mm porcelain) M2 32.00 500 16,000.00 Only damaged ceramics are measured.
First Floor-shope
c) Partition P4 (full HPL panel) m2 57.00 2200 125,400.00
d) Partition P5( Half clear glass covered with Aluminium m2 45.00 2300 103,500.00
grill and half HPL panel)
Supply and fix double leaf door made of LTZ profile with
30x30x2.5mm thick SHS frame and intermediate lashes
on existing front side metal window wall at ground floor.
Price shall include Italy made cylinderical locks,re fixing
10
of the existing glazing on outer surface of the door, one
coat of anti rust paint and three coat of synthetic enamel
paint similar color to existing frame and all accessories
and ancillary works required to complete the work.
Repair sagged pvc ceilings at forth and first floor. Price shall
include removal of existing light fixtures and re fixing them
14 on wooden buttons, provision of suspension material and M2 235.00 200 47,000.00
all additional accessories required to complete the job.
Item Description Unit Quantity Rate Amount Remark
Sanitary Works
c) Supply and fix water tap(faucet) to existing hand wash No 2.00 250 500.00
basin. Type of water tap shall be approved by the client.
c) Dimolish ceramic floor tile of fourth floor toilate 1.00 100 100.00
where slope problems is observed.
d) Supply and lay ceramic floor tile(200x200mm) at
fourth floor similar to demolished one bedded in 1:3 M2 1.00 350 350.00
cement sand mortar with proper slope towards the floor
drain.
Item Description Unit Quantity Rate Amount Remark
18 Glazing
a) Supply and fix 8mm thick glazing where existing m2 10.00 400 4,000.00
glazing are the broken at First Floor.
Others
25 Cart away all surplus material on suitable location not M3 20.00 150 3,000.00
exceeding 2km from the site.
Total 606,300.00
VAT(15%) 90,945.00
Grand Total 697,245.00
Not that site visit is mandatory prior to bid offer. Bidders who don't visit the site will be rejected.
AWASH INTERNATIONAL BANK
ALUMINUM WORKS
Replace All Existing Metal windows and doors
including Internal pvc doors with Aluminum.
Carefully dismantle all metal windows, doors and
1 metal window walls including glass and hand over M2 498.30 50 24,915.00
to the client
Total 1,627,601.13
VAT(15%) 244,140.17
Grand Total 1,871,741.30