Summery of Costing
1 Cost for construction of new EPI Building with necessary sanitary costing (Including 15% VAT)
Total In Word: One Crore Forteen Lakh Nineteen Thousand Four Hundred Fifty Six BDT. Only
Authorized Signature
On Behalf of
Environment & Infrastructure Management Solution (EIMS) Limited
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhaka-1215, Bangladesh
NT SOLUTION (EIMS) LIMITED
, Dhaka-1215, Bangladesh
ffice@eimslbd.com
UNICEF Bangladesh
13/09/2017
11,361,846
705,758
373,681
831,524
13,272,808
ENVIRONMENT & INFRASTRUCTURE MANAGEMENT SOLUTION (EIMS) LIMITED
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhaka-1215, Bangladesh
Tel: +88029113078, +8801708459575; Email: office@eimslbd.com
Civil Works
SL. NO. DESCRIPTION Unit Quantity Rate Taka Remarks
Earth work in excavation of all kinds of soils of foundation trenches including leveling, ramming and preparing the base, bailing out
1 water and shoring if necessary and disposal of cutting earth to be deposited at suitable place (Within 30 m from the working place) Cum 168.97 470 79,418
etc. all complete.as per design, drawing and direction of the Engineer-in-charge.
2 Providing and laying double layer polythene sheet weighing 1.00kg per 6.5 sqm under footing, mat, below floor slab, grade beam Sqm 199.52 50 9,976
etc. all complete as per direction of EIC.
One layer of brick flat soling under foundation, floor slab, grade beam, ramp and all other areas where required as per design with
3 1st class bricks in/c preparation of bed and filling the interstices with local sand, leveling in/c costs of tools and plants etc. all Sqm 203.84 420 85,611
complete as per direction of the engineer-in-charge.
Mass concrete works in floor, ramp, foundation and all other required area as per design with mixing ratio 1:1.5:3 with OPC cement
4 (BDS EN-197-1-CEM I), 50% Sylhet sand (F.M. 2.4), 50% Local sand (F.M. 1.2) and picked jhama chips including breaking chips, Cum 30.36 8,300 251,999
screening, mixing, laying, compacting to levels and curing for at least 7 days including the supply of water, electricity and other
charges and costs of tools and plants etc. all complete and accepted by the Engineer.
Brick works with first class bricks in cement sand (F.M. of sand 1.2) mortar (1:4) in foundation and plinth, filling the joints/interstices
5 fully with mortar, racking out the joints, cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7 Cum 2.44 6,700 16,356
days etc. all complete including cost of water, electricity and other charges and accepted by the Engineer.(Cement: CEM-I/A-M)
Shuttering Work with new wood plunk, new joint sheet as joint materials, new plain sheet including fiiting, fixing, necessary
6 propoing(Bamboo good quality), Steel pin, 24 no. GI Wire etc all completed and accepted by the Engineer in Cahage.
Sqm 636.72 510 324,730
Reinforcement cement concrete works of mixing ratio 1:1.2:2.5 having specified compressive strength minimum f'c=4000 psi or
27.5 MPa (*for normal concrete) at 28 days cylinder strength with cement confirming to ASTM like BDS EN 197-1-CEM I standard,
best quality sylhet sand having F.M=2.4 (min.), Stone chips with size 20 mm downgraded and it should be well graded crushed
7 stone chips including breaking chips and screening through proper sieve analysis , making , placing in position, placing of Cum 75.02 14,070 1,055,512
reinforcement in position; concrete mixing with mixer machine , casting in forms , compacting by vibrator machine and curing at
least for 28 days. All complete including cost of testing materials and concrete & other charges as per direction of the engineer in
charge .
Sand filling/Back Filling in foundation trenches, and plinth with fine sand or filling sand having min. F.M 0.8 in 150 mm layers
8 including leveling, watering and consolidating each layer up to finished level to achieve standard compaction as per design Cum 90.66 610 55,303
standard.
125mm Brick Masonry work with first class brick, cement BDS EN-197-1-CEM I, best quality local sand (F.M.1.2), mortar
9 preparation with ratio 1:4 and making bond with connected wall including necessary scaffolding, raking out joint, cleanning, and Sqm 749.36 954 714,888
soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floor including cost of water,
electricity, and other charges etc all complete and accepted by the Engineer.
250mm Brick Masonry work with first class brick, cement BDS EN-197-1-CEM I, best quality local sand (F.M.1.2), mortar
10 preparation with ratio 1:4 and making bond with connected wall including necessary scaffolding, raking out joint, cleanning, and Cum 8.74 7,005 61,243
soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floor including cost of water,
electricity, and other charges etc all complete and accepted by the Engineer.
Minimum 12 mm thick Plaster with cement (BDS EN-197-1-CEM I), sand (F.M. 1.2) having mortar ratio (1:4) to wall both inner-and
11 outer surface, finishing the corner and edges in/c sand cleaning like seieving and washing and curing at least for 7 days, all complete Sqm 1128.92 320 361,255
in all respect as per drawing and direction of the engineer-in-charge.
Supply & Works of Weather coat on out side wall of approved best quality like (Berger) or equivalent and color approved by
relating authority in a sealed container, made from water based powder mixed with water (1:1), applying 85 no stone before
applying primer coat like sealer to achive smoot surface, and then apply primer coat (sealer), curing the same after 7 days, then 1st
12 coat applied and curing the same for 7 (seven) days etc., and further apply 2nd coat taking care and cleaning the surface fully from Sqm 344.84 221 76,209
grease, oily substances, old paints, lime wash, fungus, algae etc., sand papering the surface before applying 1st and 2nd coat,
complete as per direction of the engineer-in-charge.
Supplying & works of Plastic emulsion paint of approved best quality (Berger or equivalent) and color approved by relating
authority,supplied with a sealed container, made from water based powder mixed with water (1:1), applying 85 no stone before
applying primer coat like sealer to achive smoot surface, and then apply primer coat (sealer), curing the same after 7 days, then 1st
13 coat applied and curing the same for 7 (seven) days etc., and further apply 2nd coat taking care and cleaning the surface fully from
Sqm 768.89 215 165,311
grease, oily substances, old paints, lime wash, fungus, algae etc., sand papering the surface before applying 1st and 2nd coat,
complete as per direction of the engineer-in-charge.
Supplying & works of Enamel paint of grill approved best quality (Berger or equivalent) and color delivered from authorized local
agent of the manufacturer in a sealed container, applying to Grill two coats over a primer or sealer coat elapsing specified time for
14 drying/recoating (these sealer should be applied over red oxide) with specified brand like (Berger or equivalent) including cleaning Sqm 64.72 221 14,304
drying, making free from dirt, grease, wax, removing all chalked & scaled materials, fungus, mending good the surface defects, sand
papering the surface and necessary scaffolding, spreading by brush/ roller/spray etc. all complete in all floor as per direction of the
engineer-in-charge.
15 Supplying, fitting and fixing window grill made of ½” x ½” M.S. solid bar 5.5” c/c with outer frame of 1.5” x ¼” F.I. bar with applying Sqm 44.56 2,416 107,665
red oxide over grill surface as per design approved and accepted by the Engineer.
Supplying, Fitting, Fixing, Carring, Polishing of Double Wooden door of required size (i) door shutter (LxBx1.5") where L and B are
16 length and width as per drawing (ii) Door Frame 6"x2.5"x7' having the following wood specification like for door shutter (Burma No's 3.00 35,000 105,000
Teak, Chittagong Teak) and Door frame will be (Burma Teak or Chittagong Teak) all completed and accepted by Engineer in charge.
Supplying, Fitting, Fixing, Carring, Polishing of Single Wooden door of required size (i) door shutter (LxBx1.5") where L and B are
17 length and width as per drawing (ii) Door Frame 6"x2.5"x7' having the following wood specification like for door shutter (Burma No's 5.00 25,000 125,000
Teak, Chittagong Teak) and Door frame will be (Burma Teak or Chittagong Teak) all completed and accepted by Engineer in charge.
18 Supply Fitting, Fixing, Carring, of best quality Upvc Plastic door (RFL, Partex) of required size including 4'x3' Cat door with two main No's 2.00 12,500 25,000
toilet door all completed and accepted by Engineer in charge.(Plastic Door Upvc)
Supply Fitting, Fixing, Carring, of best quality steel door of required size including with necessary fittings(Hinge angle, bracing
19 No's 1.00 12,000 12,000
angle,ms sheet, welding, redoxiding, polishing) all completed as per design and accepted by Engineer in charge.
Supplying, fitting and fixing of Aluminium sliding window as per the U.S. Architectural Aluminium Manufacturer’s Association
(AAMA) standard specification having 1.2 mm thick outer bottom (size 75.50 mm, 32mm), 1.2 mm thick outer top (size 75.50 mm,
16.80 mm), 1.2 mm thick shutter top (size 33 mm.26.80, 22 mm), 1.2 mm thick shutter bottom (size 60mm, 24.40 mm), 1.2 mm
thick outer side (size 75.50 mm,19.90 mm), 1.2 mm thick sliding fixed side (size 31 mm, 26 mm),1.2 mm thick shutter lock (size
20 49.20 mm 26.20 mm) and 1.2 mm thick inter lock (size 34.40 mm, 32.10 mm) sections all aluminium members (total weight Sqm 36.01 3,335 120,079
kg/sqm) will be anodized to aluminium bronze/silver colour with a coat not less than 15 micron in thickness and density of 4 mg per
square cm etc. including all accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene,
bolts and nuts including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fitting of accessories,
making grooves and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by the
Engineer.
Supplying, fitting, fixing of homogeneous floor tiles of size 16"x16" with approved brand (RAK, AKIJ, Best Quality China) and color
21 with cement (BDS EN-197-1-CEM I) sand (F.M. 1.2) mortar 1:4 base raking out joint with white cement/putty including cutting and Sqm 179.18 2,100 376,281
laying tiles in proper way, finishing, and curing for 14 days with care etc. all completed and accecpted by the Engineer in Charge.
Supplying, fitting, fixing of homogeneous Wall tiles of size 8"x12" with approved brand (RAK, AKIJ, Best Quality China) and color
22 with cement (BDS EN-197-1-CEM I) sand (F.M. 1.2) mortar 1:4 base raking out joint with white cement/putty including cutting and Sqm 79.44 1,604 127,421
laying tiles in proper way, finishing, and curing for 14 days with care etc. all completed and accecpted by the Engineer in Charge.
Supplying, fitting, fixing of Stair tiles of size 12"x12" with approved brand (RAK, AKIJ, Best Quality China) and color with cement
23 (BDS EN-197-1-CEM I) sand (F.M. 1.2) mortar 1:4 base raking out joint with white cement/putty including cutting and laying tiles in Sqm 56.09 1,536 86,149
proper way, finishing, and curing for 14 days with care etc. all completed and accecpted by the Engineer in Charge.
Supplying, fabrication and fixing to details as per design M.S deformed bar as reinforcement of required size and length for all
24 types of RCC work in/c straightening the rod, removing rusts, cleaning, cutting, hooking, bending, binding with 24 no. GI wire, Kgs 25445.20 95 2,417,294
placing the bars in position, in/c lapping, spacing and securing them in position by concrete blocks, metal chairs, etc. complete as
per specifications, drawings and direction of the Engineer-in-charge. (60G Deformed Bar with 420 Mpa Yield Strength)
Special cement concrete works as Patent Stone with mixing ratio 1:1.2:2.2 of thickness 2.5" on roof for damp proofing with net
cement finishing using standard required amount of damp proofing admixture (250ml/Bag) with the best quality sylhet sand
having F.M=2.4 (min.) , 5 mm or down graded crushed stone pie chips and cement standard (BDS EN-197-1-CEM I) including
25 breaking chips and screening through proper sieve analysis , making , placing in position, placing of reinforcement in position;
Sqm 88.94 830 73,816
concrete mixing with mixer machine , casting in forms , compacting by vibrator machine and curing at least for 21 days. All
complete and accepted by the Engineer in Charge.
26 Admixture For Damp Proof named Foam Lube or equivalent availabe in market Litre 168.62 245 41,311
Co2,Gas Type Fire Extinguisher, Capacity 5kg, with filling agent 99% Co2 Gas, Cylinder size D114*H475, thickness Ck45-4mm,
27 neck Ring, Flat bottom, Brush Vulve with top hanger loop, black hose and working pressure 150 Bar with fitting fixing all completed Nos 6.00 4,000 24,000
as per Engineer in Charge.
Supply, fitting, fixing, making, welding, carring, of MS Angle rack of size 2.4m hight, .9m width and 2.1m in length
(2.4mX2.1mX.9m) with (50mmX50mmX3mm) MS angle as vertical post, (38mmX38mmX3mm) MS angle for horizontal framing at
28 outer side as well as inside horizontal bracing and (38mmX3mm) flat bar for vertical side bracing including (150mmX150mmX5mm)
Unit Rack 7.00 53,000 371,000
base plate for each vertical post all completed as per Engineer in Charge.
29 Supply, fitting, fixing carrying, of MS slotted Angle rack of brand Partex Model No. RSA-0201-W-1200xD-600xH-1830 to site and Unit Rack 2.00 23,000 46,000
fixed as per drawing all completed and accepted by the engineer in charge.
Sand piling work for improving the under laying soil beneath footing with standard piling procedure have pile diameter of 200mm
30 and length 9000mm with center to center distance in same grid is 600mm as per design with sand (F.M >1.8) all completed and Rft 41010.00 40 1,640,400
accepted by Engineer in Charge.
31 Soil test required again for confirming desired N-value (three bore hole, at least 60 ft depth) Nos 3.00 10000.00 30000.00
Manufacturing, Supplying, fitting and Fixing collapsible gate of any design and shape of 1"x1"x1/8" M.S. angle as vertical member
and 1"x1/8" F.I bar scissors 525 mm/600mm long provided in 3 rows including cutting the different M.S members to required size,
fabricating, welding, riveting with required size size rivets, providing required size wheel, pulling handles on both sides, suitable
32 locking arrangement, electrode, grease and finally placing the same position in between two nos. 50x50x6mm M.S Tee rail made by Sqm 4.73 4,876 23039.10
welding 2 nos 50x6mm M.S flat bar fitted and fixwd with at top and bottom with RCC lintel/roof slab, floors and side wall with
required Nos 150mm long 38x6 mm M.S flat bar clamps one end welded with the gate member and the other end bifurcated and
embeded in C.C at the respective point including cutting holes and mending good the damges by pouring concrete (1:2:4) into the
holes and finishing etc all completed and accepted by the Engineer in Chage.
Supplying, fitting and fixing 38 mm dia G.I pipe stair railing of any standard height of any design and shape with 60X60X6 mm M.S.
plate as base plate at the bottom of 38 mm dia G.I pipe and fitted and fixed by welding. Placing the pipes vertically @ 250 mm c/c (1
Nos. in each steps) 150 mm embedded into R.C.C tread of stair after cutting grooves and clamping with necessary support like royal
33 Sqm 15.00 3,150 47250.00
Bolt or etc. and mending the damages properly with C.C. and providing 50 mm G.I. pipe as handrail over the vertical post and
provide 12mm circular GI pipe as horizontal support at mid height of vertical post in between two vertical post including polishing
painting etc. all complete and accepted by the Engineer in charge.
Dismantling unserviceable/damaged brick works of any thickness and, disposal of debris to be deposited at suitable place (Within
34 30 m from the working place) etc. all complete as per design, drawing and direction of the Engineer-in-charge.
Cum 20.42 592 12087.90
Demolishing R.C.C. work including stacking of steel bars and disposal of debris to be deposited at suitable place (Within 30 m from
35 Cum 22.50 850 19125.00
the working place) etc. all complete as per design, drawing and direction of the Engineer-in-charge.
Dismantling unserviceable temporary tin shed structure and, disposal of debris to be deposited at suitable place (Within 30 m
36 Cum 41.89 150.00 6282.98
from the working place) etc. all complete as per design, drawing and direction of the Engineer-in-charge.
Miscellaneous cost (tree removal,Bill board,elecrtic pole replace, rcc seat bench dismantle , fench dismantle, bush removal & all
37 L.S. 1.00 20,000 20000.00
other structures on poropsed site are not included in BoQ).
Site mobilization like site preparation, Site office building, Labor shade building, manpower mobilzation, material mobilization,
38 testing apparatus mobilization, Technical staff mobilization and additional Caring cost related to materials excluding the BoQ L.S. 1.00 50000.00 50000.00
specific item.
Total 9,178,315
Sanitary Item
SL NO. Descrition
Supplying,offitting
Item and fixing single bowl stainless steel sink with sink tray size (450 x 1050 mm.) or equivalent availabe in market Unit Quantity Rates Total Remarks
1
with heavy type CI steel brackets 12mm dia C.P. bib-cock 40 mm dia C.P. chain plug. 40 mm dia C.P. waste. 40 mm dia PVC waste pcs 1 4300 4,300.00
pipe with brass coupling (750 mm length) including making hole in walls and floors and mending good the damages, finishing with
1:4 cement mortar etc. all complete approved and accepted by the Engineer.
Supplying, fitting and fixing, Bangladesh pattern BISF standard simple type porcelain long pan (Model-323, size-
520X290X260mm,White) or equivalent simple type of vitreous china with siphon and preparing the base of pan with cement
concrete and wire net or rods including making holes in walls and floors wherever required and mending good the damages,
2 supplying porcelain lowdown with master siphon with low down cover and all fittings, fitting fixing the same in position with C.I. No's 2 6300 12,600.00
brackets including supplying best quality 38 mm dia PVC flush pipe with brass coupling (not exceeding 1.80 m in length), 12mm dia
plastic connection pipe with brass coupling, 12 mm dia brass stop cock, 12 mm dia ball cock and pulling chain etc. all complete as
per direction of the E-I-C.
Supplying, fitting and fixing white glazed vitreous W/H Wash Basin 580 x 445 x 235 mm size, approx. 14 kg by weighteqivqlent
3
availabe in market including fitting, fixing the same in position with heavy type C.I. Brackets. 30 mm dia PVC waste water pipe with No's 2 2500 5,000.00
brass coupling (not exceeding 750 mm in length), basin waste with chain plug including making holes in walls and floors and fitting
with wooden blocks, screws and mending good the damages, finishing etc. all complete approved and accepted by the Engineer.
Supplying, fitting and fixing of 450 x 350 mm size and 5 mm thick unframed super quality mirror with hard boards at the back with
4 all necessary fitting including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete No's 2 825 1,650.00
approved and accepted by the Engineer. (Made in Japan or equivalent)
5
Supplying, fitting and fixing Pedestal, 652 x 200 x 205 mm in size, approx. 5.6 kg by weight with rowel plug and screws etc. all No's 2 2455 4,910.00
complete approved and accepted by the Engineer.
Supplying, fitting and fixing super quality 600 x 125 mm coloured glass (plate) shelf having 5 mm thickness with fancy C.P. brackets,
6 screws and frames including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete No's 2 1282 2,564.00
approved and accepted by the Engineer.
7
Supplying, fitting and fixing medium quality C.P. Towel rail of 600 mm long and 20 mm in dia with C.P. holder including making holes No's 2 558 1,116.00
in walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer.
Supplying, fitting and fixing of special coloured toilet paper holder Size (150 mm x 150 mm x 126 mm) including making holes in
8 walls and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer. No's 2 720 1,440.00
Supplying, fitting and fixing standard size soap tray including making holes in walls and mending good the damages with cement
9 mortar (1:4) etc. all complete approved and accepted by the Engineer. No's 2 224 448.00
Necessay pipe networking( Vertical, inner interconnected pipe network), fixtures fittings (Tape, sink, basin, comode or pand, mirror , tissue
13 stand etc), connecting with septic tank, overhead tank, necessary pipe laying for sewarge discharge, groove cutting, cleaning, clamping and L.S. 1 80000 80,000.00
disposal of debris all completed and accepted by the Engineer in charge.
Total 347,868
STEEL WORK AND SHEET WORK
SL. NO. DESCRIPTION Unit Quantity Rate Taka Remarks
Supply of MS Hotrolled " L " Section Angle, Minimum Yield Strength 250 Mpa, All specification will be completed as per design -
1 Drawing and Engineering In Charge. kg 93.02 90 8372.03
Supplying, fitting and fixing 0.45 mm thick corrugated galvanized & colored iron sheet having min weight 63-65 kg per bundle (2'-6"
2 width 70 – 72 rft long) fitted and fixed on M.S. sections with 'J' hook or wooden purling with screws, limpet, washers and putty etc. Sqm 40.32 950 38,304.00
all complete and accepted by the Engineer.
3 Supplying, fitting and fixing bubble sheet below roof sheet all complete and accepted by the Engineer. Sqm 20.16 450 9,072.00
Supplying MS pipe of 100mm dia, thickness of 5mm including painting with anticorrosive paint laying in position and true to
4 alignment, fitting, fixing, joining, by continuous welding etc. all completed as per specifications in the drawing and as per direction m 17.58 4,850 85238.75
of the Engineer in Charge.
5 Enamel Paint on new MS Plate surface. All works will be completed as per design-drawing and specification. sqm 3.95 220 869.00
Erection charge, Fabrication, hole making, grinding, finishing etc. all works will be completed as per design-drawing and
6 specification. kg 309.02 35 10815.79
Total amount (BDT) 152,671.56
Road Construction
SL. NO. Description of Item Unit Quantity Rate Taka
Earth work in excavation of all kinds of soils of foundation trenches including leveling, ramming and preparing the base, bailing out
1 water and shoring if necessary and disposal of cutting earth to be deposited at suitable place (Within 30 m from the working place) Cum 54.0754174 470 25415.45
etc. all complete.as per design, drawing and direction of the Engineer-in-charge.
Sand filling/Back Filling in foundation trenches or road margin with coarse sand having min. F.M 2.2 in at least three (03) layers each
2 having depth of 150 mm layers including leveling, hammering, compacting, watering and consolidating each layer up to finished Cum 37.9495474 1760 66791.20
level (to be used when required as per design supplied by the design
3 One layer of brick flat soling in foundation or in floor with 1st class or picked jhama bricks in/c preparation of bed and filling the Sqm 102.71465 420 43140.15
interstices with local sand, leveling in/c costs of tools and plants etc. all complete as per direction of the engineer-in-charge.
Brick on end edging including preparation of bed and filling the interstices with local sand, leveling, maintaining, aligned grid etc. all
4 rm 68.957 88 6068.22
completed and accepted by the Engineer
Supplying, fabrication and fixing to details as per design M.S deformed bar as reinforcement of required size and length for all
types of RCC work in/c straightening the rod, removing rusts, cleaning, cutting, hooking, bending, binding with 24 no. GI wire,
5 Kg 634.39312 95 60267.35
placing the bars in position, in/c lapping, spacing and securing them in position by concrete blocks, metal chairs, etc. complete as
per specifications, drawings and direction of the Engineer-in-charge. (60G Deformed Bar with 420 Mpa Yield Strength)
Reinforcement cement concrete works of mixing ratio 1:1.5:3 having specified compressive strength minimum f'c=4000 psi or 27.5
MPa (*for normal concrete) at 28 days cylinder strength with cement confirming to ASTM like BDS EN 197-1-CEM I standard, best
quality sylhet sand having F.M=2.4 (min.), Stone chips with size 20 mm downgraded and it should be well graded crushed stone
6 Cum 10.271465 12000 123257.58
chips including breaking chips and screening through proper sieve analysis , making , placing in position, placing of reinforcement in
position; concrete mixing with mixer machine , casting in forms , compacting by vibrator machine and curing at least for 28 days. All
complete including cost of testing materials and concrete & other charges as per direction of the engineer in charge .
324939.95
Vat (15%) 48740.99
373680.94
Summary
Total Civil work 9,330,987
Sanitary Work 347,868
Total Bill For Civil and Sanitary work 9,678,855
Vat (15%) 1,451,828
Grand Total 11,130,683
Civil Works
SL.NO DESCRIPTION OF WORK Quantity Unit
1 Earth Excavation 168.974 m3
2 Polythene Laying 199.516 m2
3 Brick Solling 203.836 m2
4 CC Work 30.361 m3
5 Brick work in Foundation 2.441 m3
6 Shuttering Work 636.725 m2
7 RCC Casting 75.019 m3
8 Sand Filling 90.661 m3
9 125mm Brick Masonry Work 749.359 m2
10 250mm Brick Masonry Work 8.743 m3
11 Plaster Work 1128.921 m2
12 Weather Coat 344.839 m2
13 Plastic Paint 768.889 m2
14 Enamel Paint 64.723 m2
15 Grill Work 44.563 m2
16 Door Installation 11.000 Nos
Double 3.000
Single 5.000
Plastic 2.000
Steel Door 1.000
17 Thai Aluminium 36.006 m2
18 Floor Tiles 179.181 m2
19 Wall Tiles 79.440 m2
20 Stair Tiles 56.087 m2
21 Reinforcement Work 25445.204 Kgs
22 Patant Stone work 88.935 m2
23 Damp proof Admixture 168.615 Litre
24 Fire Extinguisher 6.000 Nos
25 Rack Installtion 7.000 Nos
26 Compacted Sand Pile Foundation 41010 Rft
27 Soil Boring 3 Nos
28 Dismalting Tin Shead 41.8865035156 m3
Dismalting Brick Wall 20.41875
29 Dismalting RCC Work 22.5 m3
30 Collapsible Gate 4.725 m2
31 Entry Gate (Mild Steel) m2
Earth Excavation
Size
Location Work At Length
mm
Foundation
Excavation for Footing (F1) Below EGL 1450
Excavation for Footing (F2) Below EGL 1750
Exczvation For Footing (F3) Below EGL 2050
Exczvation For Footing (CF4) Below EGL 2175
Exczvation For Footing (CF1) Below EGL 5700
Stair Ramp 19272
Total Earth cutting
Polythene Laying
Size
Location Work At Length
mm
Foundation
F1 Below EGL 1450
F2 Below EGL 1750
f3 Below EGL 2050
F4 Below EGL 2175
CF1 Below EGL 5700
Upon Brick Solling Floor EGL 9325
GB 126900
Total Polythene Laying
Brick Solling
Size
Location Work At Length
mm
Foundation
F1 Below EGL 1450
F2 Below EGL 1750
F3 Below EGL 2050
F4 Below EGL 2175
F5 Below EGL 5700
Upon Brick Solling Floor Ramp 3600
EGFL 9325
GB 126900
Total Brick solling
CC Work
Size
Location Work At Length
mm
Foundation
PL 16402.2761983
Ramp 2425
4075
2770
Footing F1 1150
F2 1450
F3 1750
F4 1875
CF1 5400
Total CC Work
Shuttering Work
Size
Location Work At Length
mm
F1 Below EGL 4900
F2 Below EGL 6100
F3 Below EGL 7300
F4 Below EGL 7300
CF1 Below EGL 20600
Column
C1 Below plinth level 1800
C2 Below plinth level 1650
C1 GF to 1st 2925
C2 GF to 1st 2925
Roof Top 2100
Grade Beam Grade Beam Level 57675
Floor Beam 1F+2F 57675
Stair Roof Top Beam Roof Top 16668
Slab 1F + 2F 10133.0872323
Stair SLAB Roof 5453
Lintel D1 1500
D2 1300
D3 1050
SD 1300
W1 1800
W2 1800
HW1 2700
HW 750
SLD 2100
C.G 2550
Sunshade W1 1800
W2 1800
HW 750
Stair landing 1900
Slope 11185
Rise , Trade 1500
Total Shuttering Work
RCC Casting
Size
Location Work At Length
mm
F1 Below EGL 2700
F2 Below EGL 2050
F3 Below EGL 2150
F4 Below EGL 2550
F5 Below EGL 1700
C1 Below plinth level 425
C2 Below plinth level 425
C1 1F 375
C2 375
C1 2F 375
C2 375
Roof 375
Plaster Work
Size
Location Work At Length
mm
Outside
GF East-West side 19800
North-South side 19850
Sunshade 17550
1F East-West side 19800
North-South side 19850
Sunshade 7800
Roof Parapet wall 34776
Roof Stair Wall 10374
Parapet wall 17600
Deduct SD 1000
W 1500
W1 1200
HW 2400
HW2 750
C.G 2300
EX 375
Inside
GF
East-West side 19050
North-South side 19350
Wall 30725
Ceiling 9832.91815886
Fall Slab 2350
1F East-West side 19050
North-South side 19350
Wall 27325
Ceiling 9832.91815886
Fall Slab 2350
Roof Wall 14799
Ceiling 4900
Deduct D1 1200
D2 1000
D3 750
SD 1000
W 1500
W1 1200
HW1 2400
HW 450
SLD 1800
C.G 2250
EX 375
Total
Paint Work
Size
Location Work At Length
mm
Weather Coat
GF East-West side 19800
North-South side 19850
Sunshade 17550
1F East-West side 19800
North-South side 19850
Sunshade 7800
Roof Parapet wall 34776
Roof Stair Wall 10374
Parapet wall 17600
Deduct SD 1000
W 1500
W1 1200
HW 2400
HW1 750
C.G 2250
EX 375
Total
Plastic Paint
GF
East-West side 19050
North-South side 19350
Wall 30725
Ceiling 9832.91815886
Fall Slab 2350
1F East-West side 19050
North-South side 19350
Wall 27325
Ceiling 9832.91815886
Fall Slab 2350
Roof Wall 10374
Ceiling 4900
Deduct D1 1200
D2 1000
D3 750
SD 1000
W 1500
W1 1200
HW 2400
HW 750
SLD 1800
C.G 2250
EX 375
Total
Enamel Paint
D1 1200
D2 1000
SD 1000
W1 1500
W2 1200
HW1 2400
HW 450
SLD 1800
C.G 2275
EX 375
Total
Grill Work
Size
Location Work At Length
mm
W1 1500
W2 1200
HW1 2400
HW 450
SLD 1800
C.G 2275
EX 375
Total Grill work
Door Installation
Size
Location Work At Length
mm
Deduct D1 1200
D2 1000
D3 750
SD 1000
Total Door Installation
Thai Aluminium
Size
Location Work At Length
mm
W1 1500
W2 1200
HW1 2400
HW 450
EX 375
Total
Tiles Work
Size
Location Work At Length
mm
Floor Tiles
GF+1F 9325
Skirting Side Wall 59550
Inside Wall 56050
Deduct D1 1500
D2 1050
D3 750
Wall 56050
Deduct Stair portion 2500
Total Floor Tiles
Wall Tiles Toilet(GF) 7050
Toilet(1F) 7050
Sink area 1585
WIC ,PRTE colling 18950
Deduct W1 1500
W2 1200
SLD 1800
D1 1200
D2 1000
Total Wall Tiles
Stair Tiles
Step 1500
Waist slab 5500
Laning 1500
Skirting 29446
Total
Reinforcement Wo
Main Bar No. of Item
Footing For Footing (16mm) F1 3
3
For Footing (16mm) F2 6
6
For Footing (16mm) F3 4
4
For Footing (16mm) F4 1
1
For Footing (16mm) CF1 1
1
All Floors C1 column 2
2
Seimic Hook (10mm) 2
Tie (10mm) 2
C1A column 4
Tie (10mm) 4
Tie (10mm) 4
C1B column 2
2
Tie (10mm) 2
Tie (10mm) 2
C2 column 4
4
Seimic Hook (10mm) 4
Tie (10mm) 4
C2A column 3
Tie (10mm) 3
Tie (10mm) 3
C3 column 2
2
Seimic Hook (10mm) 2
Tie (10mm) 2
C3A column 1
1
Seimic Hook (10mm) 1
Tie (10mm) 1
GB1 1
Extra Top 1
Grade Beam along 1
Extra Bottom 1
Stirrup (10mm) 1
GB1 1
Extra Top 1
Grade Beam along 2
Extra Bottom 1
Stirrup (10mm) 1
GB1 1
Extra Top 1
Grade Beam along 3
Extra Bottom 1
Stirrup (10mm) 1
GB1 1
Extra Top 1
Grade Beam along 4
Extra Bottom 1
Stirrup (10mm) 1
GB2 1
Extra Top 1
Grade Beam along A
Extra Bottom 1
Stirrup (10mm) 1
GB2 1
Extra Top 1
Grade Beam along C
Extra Bottom 1
Stirrup (10mm) 1
GB2 1
Extra Top 1
Extra Top 1
Grade Beam along D
Extra Bottom 1
Extra Bottom 1
Stirrup (10mm) 1
GB2 1
Extra Top 1
Grade Beam along E Extra Top 1
Extra Bottom 1
Extra Bottom 1
B1 1
Extra Top 1
Floor Beam along 1
Extra Bottom 1
Stirrup (10mm) 1
B2 1
1
Extra Top 1
Floor Beam along 2
Extra Top 1
Extra Bottom 1
Floor Beam along 2
Stirrup (10mm) 1
B2 & B1 1
Extra Top 1
Floor Beam along 3 Extra Top 1
Extra Bottom 1
Stirrup (10mm) 1
B1 1
Extra Top 1
Floor Beam along 4
Extra Top 1
Stirrup (10mm) 1
B1 1
Floor Beam along A Extra Top 1
Stirrup (10mm) 1
B1 1
Floor Beam along B Extra Top 1
Stirrup (10mm) 1
B1 1
Floor Beam along C Extra Top 1
Stirrup (10mm) 1
B1 1
Floor Beam along D Extra Top 1
Stirrup (10mm) 1
B1 1
Floor Beam along E Extra Top 1
Stirrup (10mm) 1
B1 1
Roof Beam along 1 Extra Top 1
Stirrup (10mm) 1
B2 1
Extra Top 1
Roof Beam along 2 Extra Top 1
Extra Bottom 1
Stirrup (10mm) 1
B2 & B1 1
Extra Top 1
Extra Top 1
Roof Beam along 3
Extra Bottom 1
Extra Bottom 1
Stirrup (10mm) 1
B1 1
Extra Top 1
Roof Beam along 4 Extra Top 1
Extra Bottom 1
Stirrup (10mm) 1
B1 1
Roof Beam along A
Roof Beam along A
Stirrup (10mm) 1
B1 1
Roof Beam along B
Stirrup (10mm) 1
B1 1
Roof Beam along C
Stirrup (10mm) 1
B1 1
Roof Beam along D
Stirrup (10mm) 1
B1 1
Roof Beam along E
Stirrup (10mm) 1
B1 1
Extra Top 1
Landing 1st Floor
Extra Bottom 1
Stirrup (10mm) 1
Total
Collapsible Gate
Size
Location Work At Length
mm
Security Door, Front CG1 2250
Total Grill work
1. Steel Work
1.STEEL BEAM
Description Width Thick
mm mm
L Section Angle 100 3
Total
3. PURLIN
Description Width Depth
mm mm
4. SHEET
Description Width Depth
mm mm
Polythene Laying
Size
Breath Depth Quantity Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
Brick Solling
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
CC Work
Size
Quantity Total Volume
Breath Depth Volume (Cum.)
(No's) (Cum)
mm mm
Shuttering Work
Size
Quantity Total Volume
Breath Depth Volume (Sqm.)
(No's) (Sqm.)
mm mm
300 3 4.41 4.41
300 6 10.98 10.98
375 4 10.95 10.95
375 1 2.7375 2.7375
300 1 6.18 6.18
0 0
1700 6 18.36 18.36
1700 5 14.025 14.025
1650 6 28.9575 28.9575
1650 5 24.13125 24.13125
1650 2 6.93 6.93
900 1 51.9075 51.9075
1200 2 138.42 138.42
1200 1 20.0016 20.0016
10133.087232 2 205.3589137164 205.3589137164
3481 1 18.981893 18.981893
425 3 1.9125 1.9125
425 5 2.7625 2.7625
425 2 0.8925 0.8925
425 1 0.5525 0.5525
425 9 6.885 6.885
425 5 3.825 3.825
425 4 4.59 4.59
425 2 0.6375 0.6375
425 1 0.8925 0.8925
425 1 1.08375 1.08375
475 9 7.695 7.695
475 5 4.275 4.275
475 2 0.7125 0.7125
3250 2 12.35 12.35
1500 1 16.7775 16.7775
150 38 8.55 8.55
otal Shuttering Work 636.7249067164
RCC Casting
Size
Breath Depth Quantity Total Volume
Volume (Cu.M.)
(No's) (Cu.M.)
mm mm
1550 300 3 3.7665 3.7665
1250 300 6 4.6125 4.6125
1350 300 4 3.483 3.483
1750 325 1 1.4503125 1.4503125
1350 225 1 0.516375 0.516375
350 1950 6 1.740375 1.740375
350 1950 5 1.4503125 1.4503125
300 2925 6 1.974375 1.974375
300 2925 5 1.6453125 1.6453125
300 2925 6 1.974375 1.974375
300 2925 5 1.6453125 1.6453125
300 2175 4 0.97875 0.97875
300 375 1 6.4884375 6.4884375
300 250 2 8.65125 8.65125
300 250 1 1.2501 1.2501
9832.9181589 125 2 24.1715698797 24.1715698797
3775 125 1 2.371171875 2.371171875
1675 75 2 0.5904375 0.5904375
125 150 3 0.084375 0.084375
125 150 5 0.121875 0.121875
125 150 2 0.039375 0.039375
125 150 1 0.024375 0.024375
125 150 9 0.30375 0.30375
125 150 5 0.140625 0.140625
125 150 3 0.151875 0.151875
125 150 4 0.05625 0.05625
125 150 1 0.039375 0.039375
125 150 1 0.0478125 0.0478125
475 125 9 0.961875 0.961875
475 125 5 0.4453125 0.4453125
475 125 4 0.178125 0.178125
1500 125 1 2.0971875 2.0971875
250 150 1 0.20971875 0.20971875
3100 125 2 1.35625 1.35625
Total RCC Work 75.0186230047
Sand Filling
Size
Quantity Total Volume
Breath Depth Volume (Cu.M.)
(No's) (Cu.M.)
mm mm
Plaster Work
Size
Quantity
Breath Area (Sqm.) Total Area (Sqm.)
(No's)
mm Side
Paint Work
Size
Quantity
Breath Area (Sqm.) Total Area (Sqm.)
(No's)
mm Side
Grill Work
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
1350 9 18.225 18.225
1350 5 8.1 8.1
600 4 5.76 5.76
450 2 0.405 0.405
2100 1 3.78 3.78
2100 1 4.7775 4.7775
375 25 3.515625 3.515625
Total Grill work 44.563125
Door Installation
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
2100 2 3 15.12 15.12
2100 2 5 21 21
2100 2 2 6.3 6.3
2100 1 1 2.1 2.1
Total Door Installation 11 44.52
Thai Aluminium
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
1350 9 18.225 18.225
1350 5 8.1 8.1
600 4 5.76 5.76
450 2 0.405 0.405
375 25 3.515625 3.515625
Total 36.005625
Tiles Work
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
Reinforcement Work
Length of bar
No. of Bar NO of Side (ft) Unit wt Total (Kgs)
8 1 4.33 0.48 48
8 1 4.33 0.48 48
10 1 5.33 0.48 149
10 1 5.33 0.48 149
12 1 6.33 0.48 142
12 1 6.33 0.48 142
10 1 6.77 0.48 31
10 1 6.77 0.48 31
36 2 18.50 0.48 641
32 2 16.33 0.48 498
4 1 41.00 1.17 385
2 1 41.00 0.48 79
100 1 1.20 0.19 45
100 1 5.33 0.19 200
16 1 51.00 1.17 3833
124 1 3.18 0.19 297
124 1 5.33 0.19 497
4 1 41.00 1.17 385
6 1 41.00 0.48 237
98 1 3.73 0.19 138
98 1 5.33 0.19 197
4 1 41.00 1.17 770
2 1 41.00 0.75 247
99 1 1.15 0.19 86
99 1 4.67 0.48 889
8 1 41.00 0.75 740
98 1 2.78 0.19 154
98 1 4.67 0.19 258
4 1 41.00 1.17 385
2 1 41.00 0.48 79
123 1 1.15 0.19 53
123 1 4.33 0.19 200
4 1 41.00 1.17 193
2 1 41.00 0.75 62
123 1 1.15 0.19 27
123 1 4.33 0.19 100
4 1 61.30 0.75 184
0 1 17.79 0.75 0
0 1 8.61 0.48 0
187 1 4.26 0.19 150
4 1 61.30 0.75 184
0 1 0.00 0.75 0
0 1 0.00 0.48 0
187 1 4.26 0.19 150
4 1 72.62 0.75 218
0 1 0.00 0.75 0
0 1 0.00 0.48 0
218 1 4.26 0.19 175
4 1 72.62 0.75 218
1 1 25.00 0.48 12
0 1 0.00 0.48 0
218 1 4.26 0.19 175
4 1 34.25 0.48 66
0 1 0.00 0.75 0
0 1 0.00 0.48 0
103 1 4.26 0.19 82
4 1 46.87 0.75 141
0 1 0.00 0.75 0
0 1 0.00 0.48 0
141 1 4.26 0.19 113
4 1 46.87 0.75 141
1 1 22.71 0.48 11
1 1 3.99 0.75 3
1 1 12.19 0.48 6
1 1 9.15 0.75 7
141 1 4.26 0.19 113
4 1 46.87 0.75 141
1 1 37.62 0.75 28
1 1 6.31 0.48 3
1 1 18.24 0.75 14
1 1 12.96 0.48 6
4 1 76.37 0.75 230
1 1 36.14 0.48 17
1 1 11.67 0.48 6
202 1 5.00 0.19 190
4 1 92.20 0.75 277
2 1 92.20 0.48 89
1 1 32.47 0.48 16
1 1 28.67 0.75 22
1 1 23.33 0.75 18
277 1 4.80 0.19 249
6 1 73.87 0.75 333
1 1 32.47 0.48 16
1 1 28.67 0.75 22
1 1 23.33 0.75 18
222 1 4.80 0.19 200
6 1 87.87 0.75 396
2 1 18.33 0.48 18
1 1 8.59 0.75 6
264 1 4.80 0.19 238
4 1 57.47 0.75 173
1 1 6.42 0.48 3
172 1 4.80 0.19 156
4 1 14.50 0.75 44
1 1 9.92 0.48 5
44 1 4.80 0.19 39
4 1 59.47 0.75 179
1 1 20.92 0.48 10
178 1 4.80 0.19 161
4 1 59.47 0.75 179
1 1 20.92 0.48 10
178 1 4.80 0.19 161
4 1 59.47 0.75 179
1 1 20.92 0.48 10
178 1 4.80 0.19 161
4 1 76.37 0.75 230
1 1 23.00 0.48 11
229 1 5.00 0.19 215
4 1 92.20 0.75 277
1 1 11.17 0.48 5
1 1 14.50 0.75 11
1 1 11.67 0.75 9
277 1 4.80 0.19 249
5 1 73.87 0.75 278
1 1 19.22 0.75 14
1 1 41.56 0.48 20
1 1 28.33 0.75 21
1 1 11.67 0.48 6
222 1 4.80 0.19 200
4 1 87.87 0.75 264
2 1 18.83 0.48 18
1 1 29.00 0.75 22
1 1 11.67 0.75 9
264 1 4.80 0.19 238
4 1 57.47 0.75 173
172 1 4.80 0.19 156
4 1 14.50 0.75 44
44 1 4.80 0.19 39
4 1 59.47 0.75 179
178 1 4.80 0.19 161
4 1 59.47 0.75 179
178 1 4.80 0.19 161
4 1 59.47 0.75 179
178 1 4.80 0.19 161
4 2 14.63 0.75 88
1 2 4.20 0.75 6
1 2 4.20 0.75 6
44 2 4.80 0.19 79
. Steel Work
1.STEEL BEAM
Length No of side Nos Weight
mm Kg
39500 1 1 93.02 3.95
5 5 216.71
2.5 1 5 121.87
4. SHEET
Thickness No of side Nos Weight
mm Kg
1 20.16
1 20.16
otal 40.32
1 20.16
7500 200 1 18 18
Total Back Filling 22.5
Pedastal 1500
In mm
Diff. in PL-EGL 600
Floor Ht. 6600
Lap 3150
12525
Total
41 in ft.
Pedastal 1500
In mm
Diff. in PL-EGL 600
Floor Ht. 9640
Lap 3150
15565
Total
51 in ft.
ENVIRONMENT & INFRASTRUCTURE MANAGEMENT SO
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhak
Tel: +88029113078, +8801708459575; Email: office@eim
Civil Works
SL. NO.
7
8
10
11
12
13
14
15
16
17
18
19
20
21
22
Total
CIVIL WORKS
VAT (15%)
GRAND TOTAL AMOUNT
ENVIRONMENT & INFRASTRUCTURE MANAGEMENT SOLUTIO
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhaka-1215,
Tel: +88029113078, +8801708459575; Email: office@eimslbd.com
Civil Works
DESCRIPTION
Earth work in excavation of all kinds of soils of foundation trenches including leveling, ramming and preparing th
base, bailing out water and shoring if necessary and disposal of cutting earth to be deposited at suitable plac
(Within 30 m from the working place) etc. all complete.as per design, drawing and direction of the Engineer-in
charge.
Providing and laying double layer polythene sheet weighing 1.00kg per 6.5 sqm under footing, mat, below floo
slab, grade beam etc. all complete as per direction of EIC.
One layer of brick flat soling under foundation, floor slab, grade beam, ramp and all other areas where require
as per design with 1st class bricks in/c preparation of bed and filling the interstices with local sand, leveling in/c
costs of tools and plants etc. all complete as per direction of the engineer-in-charge.
Mass concrete works in floor, ramp, foundation and all other required area as per design with mixing ratio
1:1.5:3 with OPC cement (BDS EN-197-1-CEM I), 50% Sylhet sand (F.M. 2.4), 50% Local sand (F.M. 1.2) and picke
jhama chips including breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 day
including the supply of water, electricity and other charges and costs of tools and plants etc. all complete an
accepted by the Engineer.
Shuttering Work with new wood plunk, new joint sheet as joint materials, new plain sheet including fiiting, fixing
necessary propoing(Bamboo good quality), Steel pin, 24 no. GI Wire etc all completed and accepted by th
Engineer in Cahage.
Reinforcement cement concrete works of mixing ratio 1:1.2:2.5 having specified compressive strength minimum
f'c=4000 psi or 27.5 MPa (*for normal concrete) at 28 days cylinder strength with cement confirming BDS EN 197
1-CEM I standard, best quality sylhet sand having F.M=2.4 (min.), Stone chips with size 20 mm downgraded and
should be well graded crushed stone chips including breaking chips and screening through proper sieve analysis
making , placing in position, placing of reinforcement in position; concrete mixing with mixer machine , casting i
forms , compacting by vibrator machine and curing at least for 28 days. All complete including cost of testin
materials and concrete & other charges as per direction of the engineer in charge .
Sand filling/Back Filling in foundation trenches, and plinth with fine sand or filling sand having min. F.M 0.8 in 15
mm layers including leveling, watering and consolidating each layer up to finished level to achieve standar
compaction as per design standard.
125mm Brick Masonry work with first class brick, cement BDS EN-197-1-CEM I, best quality local sand (F.M.1.2
mortar preparation with ratio 1:4 and making bond with connected wall including necessary scaffolding, rakin
out joint, cleanning, and soaking the bricks for at least 24 hours before use and washing of sand curing at least fo
7 days in all floor including cost of water, electricity, and other charges etc all complete and accepted by th
Engineer.
250mm Brick Masonry work with first class brick, cement BDS EN-197-1-CEM I, best quality local sand (F.M.1.2
mortar preparation with ratio 1:4 and making bond with connected wall including necessary scaffolding, rakin
out joint, cleanning, and soaking the bricks for at least 24 hours before use and washing of sand curing at least fo
7 days in all floor including cost of water, electricity, and other charges etc all complete and accepted by th
Engineer.
Minimum 12 mm thick Plaster with cement (BDS EN-197-1-CEM I), sand (F.M. 1.2) having mortar ratio (1:4) t
wall both inner-and outer surface, finishing the corner and edges in/c sand cleaning like seieving and washing an
curing at least for 7 days, all complete in all respect as per drawing and direction of the engineer-in-charge.
Supply & Works of Weather coat on out side wall of approved best quality like (Berger) or equivalent and colo
approved by relating authority in a sealed container, made from water based powder mixed with water (1:1
applying 85 no stone before applying primer coat like sealer to achive smoot surface, and then apply primer coa
(sealer), curing the same after 7 days, then 1st coat applied and curing the same for 7 (seven) days etc., an
further apply 2nd coat taking care and cleaning the surface fully from grease, oily substances, old paints, lim
wash, fungus, algae etc., sand papering the surface before applying 1st and 2nd coat, complete as per direction o
the engineer-in-charge.
Supplying & works of Plastic emulsion paint of approved best quality (Berger or equivalent) and color approved
by relating authority,supplied with a sealed container, made from water based powder mixed with water (1:1),
applying 85 no stone before applying primer coat like sealer to achive smoot surface, and then apply primer coat
(sealer), curing the same after 7 days, then 1st coat applied and curing the same for 7 (seven) days etc., and
further apply 2nd coat taking care and cleaning the surface fully from grease, oily substances, old paints, lime
wash, fungus, algae etc., sand papering the surface before applying 1st and 2nd coat, complete as per direction o
the engineer-in-charge.
Supplying & works of Enamel paint of grill approved best quality (Berger or equivalent) and color delivered from
authorized local agent of the manufacturer in a sealed container, applying to Grill two coats over a primer or
sealer coat elapsing specified time for drying/recoating (these sealer should be applied over red oxide) with
specified brand like (Berger or equivalent) including cleaning drying, making free from dirt, grease, wax,
removing all chalked & scaled materials, fungus, mending good the surface defects, sand papering the surface
and necessary scaffolding, spreading by brush/ roller/spray etc. all complete in all floor as per direction of the
engineer-in-charge.
Floor Finishing (Required area mentioned in the drawing) with 1-1.5" thick cement Sylhet mortar with ne
cement finishing having water/cemet ratio of grouting 0.4 including water supply, labor cost, all complete an
accepted by Engineer
Supplying, fitting and fixing window grill made of ½” x ½” M.S. solid bar 5.5” c/c with outer frame of 1.5” x ¼” F.
bar with applying red oxide over grill surface as per design approved and accepted by the Engineer.
Supplying fitting and fixing of rolling shutter of any design and shape made of 24 SWG G.P. sheet unit minimum
69 mm width having 10 mm and 12 mm dia circular folding at ends, rolled in machine, locked together properl
to form rolling shutter, top of the shutter to be fitted with circular spring made of 22 BWG sheet, containing bes
quality spring made in china, nutted with 38 mm G.I. pipe at one end and the other end nutted to shutte
including fitting the G.I. pipe again with 375x300x6 mm pankha at ends with side guide channel (side channe
consist of 50x100x6 mm M.S. plate with 2x19x3 mm F.I. bar, middle channel (if any) consist of 2x150x6 mm M.S
plate with 2x19x6 mm fixed to wall or column with clamps embedded in R.C.C. part by cement concrete (1:2:4
including cutting holes (minimum 3x25x6 mm) mending the damages, finishing, curing, bottom end of shutte
fitted to folded G.P. sheet (min 125 mm width in two layers), which is again fitted to 25x25x3 mm angle, providin
handle with F.I. bar 25x6 mm and locking arrangement in both sides, painting two coats with approved color an
brand of synthetic enamel paint over a coat of priming etc. complete in all respect accepted by the engineer. [rat
is excluding the cost of painting]
Supplying, fitting and fixing of Aluminium sliding window as per the U.S. Architectural Aluminium Manufacturer
Association (AAMA) standard specification having 1.2 mm thick outer bottom (size 75.50 mm, 32mm), 1.2 mm
thick outer top (size 75.50 mm, 16.80 mm), 1.2 mm thick shutter top (size 33 mm.26.80, 22 mm), 1.2 mm thic
shutter bottom (size 60mm, 24.40 mm), 1.2 mm thick outer side (size 75.50 mm,19.90 mm), 1.2 mm thick slidin
fixed side (size 31 mm, 26 mm),1.2 mm thick shutter lock (size 49.20 mm 26.20 mm) and 1.2 mm thick inter loc
(size 34.40 mm, 32.10 mm) sections all aluminium members (total weight kg/sqm) will be anodized to aluminium
bronze/silver colour with a coat not less than 15 micron in thickness and density of 4 mg per square cm etc
including all accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene
bolts and nuts including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fittin
of accessories, making grooves and mending good damages, carriage, and electricity complete in all respect a
per drawing and accepted by the Engineer.
Supplying, fitting, fixing of homogeneous floor tiles of size 16"x16" with approved brand (RAK, AKIJ, Best Quality
China) and color with cement (BDS EN-197-1-CEM I) sand (F.M. 1.2) mortar 1:4 base raking out joint with white
cement/putty including cutting and laying tiles in proper way, finishing, and curing for 14 days with care etc. all
completed and accecpted by the Engineer in Charge.
Special cement concrete works as Patent Stone with mixing ratio 1:1.2:2.2 of thickness 2.5" on roof for dam
proofing with net cement finishing using standard required amount of damp proofing admixture (250ml/Bag
with the best quality sylhet sand having F.M=2.4 (min.) , 5 mm or down graded crushed stone pie chips an
cement standard BDS EN 197-1-CEM I including breaking chips and screening through proper sieve analysis
making , placing in position, placing of reinforcement in position; concrete mixing with mixer machine , casting i
forms , compacting by vibrator machine and curing at least for 21 days. All complete and accepted by th
Engineer in Charge.
Admixture For Damp Proof (250 ml per Bag of cement) named Foam Lube or equivalent availabe in market.
Supplying, fabrication and fixing to details as per design M.S deformed bar as reinforcement of required size an
length for all types of RCC work in/c straightening the rod, removing rusts, cleaning, cutting, hooking, bending
binding with 24 no. GI wire, placing the bars in position, in/c lapping, spacing and securing them in position b
concrete blocks, metal chairs, etc. complete as per specifications, drawings and direction of the Engineer-in
charge. (60G Deformed Bar with 420 Mpa Yield Strength)
CO2, Gas Type Fire Extinguisher, Capacity 5kg, with filling agent 99% Co2 Gas, Cylinder size D114*H475, thicknes
Ck45-4mm, neck Ring, Flat bottom, Brush Vulve with top hanger loop, black hose and working pressure 150 Ba
with fitting fixing all completed as per Engineer in Charge.
Total
CIVIL WORKS
VAT (15%)
GRAND TOTAL AMOUNT
OLUTION (EIMS) LIMITED
a-1215, Bangladesh
mslbd.com
g (New Construction)
Client: UNICEF Bangladesh
Date: 13/9/2018
613,703
613,703
92,055
705,758
UNICEF GAVI HSS-2 PROGRAMME
Civil Works
DESCRIPTION OF WORK Quantity Unit
Earth Excavation 13.50 m3
Polythene Laying 9.00 m2
Brick Solling 28.64 m2
CC Work 0.30 m3
Shuttering Work 100.95 m2
RCC Casting 11.0745 m3
Sand Filling 16.57 m3
125mm Brick Masonry Work 36.54 m2
250mm Brick Masonry Work 2.4675 m3
Plaster Work 130.070436 m2
Weather Coat 70.74 m2
Plastic Paint 61.370436 m2
Enamel Paint 11.7 m2
Net Cement Finishing (Floor) 2.31 m2
Grill Work 4.14 m2
Shutter Door Installation 3.78 m2
Thai Aluminium 4.14 m2
Tiles 17.955436 m2
Patent Stone 20 m2
Damp Proof Admixture 9.2803472586 Litre
Reinforcement Work 1519.58 kg
Fire Extinguisher 1 Nos
Earth Excavation
Size
Location Work At Length
mm
Foundation
Excavation for Footing Below EGL 1500
Polythene Laying
Size
Location Work At Length
Location Work At
mm
Foundation
Below EGL 1500
Total Polythene Laying
Brick Solling
Size
Location Work At Length
mm
Foundation
Below Footing 1500
Below GB 15600
Floor Area 3400
Total Solling work
CC Work
Size
Location Work At Length
mm
Generator Platform
GF 2200
Total CC Work
Shuttering Work
Size
Location Work At Length
mm
Footing 5100
Column Upto PL 1800
PL to 1st Floor 1500
GB 16800
FB 16800
GF Floor Side 18000
Top Floor Slab 5300
Sunshade R/s 1500
1050
Door Sunshade 2200
Lintel WH 1050
W1 1500
Door 2200
Total Shuttering work
RCC Casting
Size
Location Work At Length
mm
Sand Filling
Size
Location Work At Length
mm
PL
Back Filling Footing 1500
PL 4400
Deduct Footing 1200
Column 375
Sand Filling
Outside 15600
Parapet Wall 15600
Deduct R/S 1800
HW 750
W1 1200
Total Brick Work
GF Above GB 17000
Stair 2100
Total Brick Work
Plaster Work
Size
Location Work At Length
mm
Outside
Outside Outside Wall 18000
Parapat wall 18000
Sunshade (Door) 2100
Sunshade (Window) 1500
1050
Deduct R/S 1800
HW 750
W1 1200
Total
Paint Work
Size
Location Work At Length
mm
Weather Coat
Outside Outside Wall 18000
Parapat wall 18000
Sunshade (Door) 2100
Sunshade (Window) 1500
1050
Deduct Outside Wall 1800
Parapat wall 750
W1 1200
Total Weather Coat
Plastic Paint
Inside Inside wall 17200
Ceiling 4206
Deduct R/S 1800
HW 750
W1 1200
Total Plastic Paint
EE
Enamel Paint W1 1200
HW 750
Steel shutter door 1800
Total Enamel Paint
Grill Work
Size
Location Work At Length
mm
GF W1 1200
HW 750
Total Grill Work
Thai Aluminium
Size
Location Work At Length
mm
Tiles
Size
mm
Patent Stone
Size
Location Work At Length
mm
Reinforcement Work
Main Bar No. of Item
Footing For Footing (12mm) F1 4
Column Below GB Main Reinforcement(16mm) 4
Seimic Hook (10mm) 4
Tie (10mm) 4
Column Above Top Main Reinforcement(16mm) 4
Seimic Hook(10mm) 4
Tie (10mm) 4
Grade Beam Main GB1(16mm) 2
2
Stirrup (10mm) 1
Floor Slab Long Rod (10mm) 1
Short Rod (10mm) 1
Floor Beam B1 (16mm) 2
2
Stirrup (10mm) 1
Slab Roof Slab 1
1
Lintel 1
1
Sunshade (Door) 1
1
Total Reinforcement
Earth Excavation
Depth
Quantity Volume Total Volume
Breath (No's) (Cu.M.) (Cu.M.)
mm
h Excavation 13.50
Polythene Laying
Depth
Quantity Volume Total Volume
Breath mm (No's) (Sqm.) (Sqm.)
Quantity Volume Total Volume
(No's) (Sqm.) (Sqm.)
mm
Brick Solling
Depth
Quantity Volume Total Volume
Breath mm (No's) (Sqm.) (Sqm.)
mm
CC Work
Depth
Quantity Volume Total Volume
Breath mm (No's) (Cum.) (Cum.)
mm
Shuttering Work
Depth
Quantity Volume Total Volume
Breath mm (No's) (Sqm.) (Sqm.)
mm
RCC Casting
Depth
Quantity Volume Total Volume
Breath mm (No's) (Cu.M.) (Cu.M.)
mm
Sand Filling
Depth
Quantity Volume Total Volume
Breath mm (No's) (Cu.M.) (Cu.M.)
mm
Plaster Work
Depth
Breath mm Quantity Area (Sqm.) Total Area (Sqm.)
(No's)
mm
Paint Work
Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm
Grill Work
Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm
1350 2No's 3.24 3.24
600 2 0.9 0.9
Grill Work 4.14
Thai Aluminium
Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm
Tiles
Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm
Patent Stone
Depth
Quantity
Breath mm Area (Sqm.) Total Area (Sqm.)
(No's)
mm
4000 1 20 20
nt Stone Work 20
mp Proof Admixture
No. of Bag Of
Size Admixture
Cement Total Amount in
Required per
Area in Total Volume (Litre)
Bag(ml)
Sft Cft
1400.203 91.8768484772 22.0504436345 250 5.5126109086
215.299 62.7956058333 15.0709454 250 3.76773635
dmixture 9.2803472586
einforcement Work
Length of bar
No. of Bar NO of Side (ft) Unit wt Total (Kgs)
12 2 4.5 0.27067 116.928814171
4 1 7.5 0.48107 57.7278421702
15 1 4.3333333333 0.18792 48.8581997534
15 1 2.25 0.18792 25.3686806412
4 1 10.3333333333 0.48107 79.5361381011
23 1 3.25 0.18792 56.0964515687
23 1 1.50 0.18792 25.8906699548
4 1 17.4166666667 0.48107 67.0284389642
4 1 14.0833333333 0.48107 54.2000295931
95 1 2.92 0.18792 51.96693611
33 1 15.83 0.18792 97.234081381
41 1 12.50 0.18792 95.5553637485
4 1 17.4166666667 0.48107 67.0284389642
4 1 14.0833333333 0.48107 54.2000295931
95 1 2.9166666667 0.18792 51.96693611
45.48 2 15.2 0.18792 259.8113696671
37.48 2 18.5333333333 0.18792 261.0641440197
4 1 24 0.18792 18.0399506782
48 1 1.4 0.18792 12.6279654747
3 1 15.5 0.18792 8.7381011097
31 1 1.6666666667 0.18792 9.709001233
nforcement 1519.58
753.2
ENVIRONMENT & INFRASTRUCTURE MANAGEMENT SOLUTION (EIMS) LIMITED
Flat. 5B, 126/3, Monipuripara, Airport Road, Tejgaon, Dhaka-1215, Bangladesh
Tel: +88029113078, +8801708459575; Email: office@eimslbd.com
Civil Works
SL. NO. DESCRIPTION Unit Quantity Rate Taka Remarks
Earth work in excavation of all kinds of soils of foundation trenches including leveling, ramming and preparing the base, bailing out
1 water and shoring if necessary and disposal of cutting earth to be deposited at suitable place (Within 30 m from the working place) Cum 26.01 470 12,224
etc. all complete.as per design, drawing and direction of the Engineer-in-charge.
2 Providing and laying double layer polythene sheet weighing 1.00kg per 6.5 sqm under footing, mat, below floor slab, grade beam Sqm 9.36 25 234
etc. all complete as per direction of EIC.
One layer of brick flat soling under foundation, floor slab, grade beam, ramp and all other areas where required as per design with
3 1st class bricks in/c preparation of bed and filling the interstices with local sand, leveling in/c costs of tools and plants etc. all Sqm 9.36 420 3,932
complete as per direction of the engineer-in-charge.
Mass concrete works in floor, ramp, foundation and all other required area as per design with mixing ratio 1:1.5:3 with OPC cement
4 (BDS EN-197-1-CEM I), 50% Sylhet sand (F.M. 2.4), 50% Local sand (F.M. 1.2) and picked jhama chips including breaking chips, Cum 1.40 8,300 11,656
screening, mixing, laying, compacting to levels and curing for at least 7 days including the supply of water, electricity and other
charges and costs of tools and plants etc. all complete and accepted by the Engineer.
Brick works with first class bricks in cement sand (F.M. of sand 1.2) mortar (1:4) in foundation and plinth, filling the joints/interstices
5 fully with mortar, racking out the joints, cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7 Cum 13.23 6,700 88,644
days etc. all complete including cost of water, electricity and other charges and accepted by the Engineer.(Cement: CEM-I/A-M)
Shuttering Work with new wood plunk, new joint sheet as joint materials, new plain sheet including fiiting, fixing, necessary
6 propoing(Bamboo good quality), Steel pin, 24 no. GI Wire etc all completed and accepted by the Engineer in Cahage.
Sqm 9.36 510 4,775
Reinforcement cement concrete works of mixing ratio 1:1.2:2.5 having specified compressive strength minimum f'c=4000 psi or
27.5 MPa (*for normal concrete) at 28 days cylinder strength with cement confirming BDS EN 197-1-CEM I standard, best quality
7 sylhet sand having F.M=2.4 (min.), Stone chips with size 20 mm downgraded and it should be well graded crushed stone chips Cum 1.51 14,070 21,314
including breaking chips and screening through proper sieve analysis , making , placing in position, placing of reinforcement in
position; concrete mixing with mixer machine , casting in forms , compacting by vibrator machine and curing at least for 28 days. All
complete including cost of testing materials and concrete & other charges as per direction of the engineer in charge .
Sand filling/Back Filling in foundation trenches, and plinth with fine sand or filling sand having min. F.M 0.8 in 150 mm layers
8 including leveling, watering and consolidating each layer up to finished level to achieve standard compaction as per design Cum 22.16 610 13,518
standard.
Floor Finishing (Required area mentioned in the drawing) with 1-1.5" thick cement Sylhet mortar with net cement finishing having
9 Sqm 95.84 430 41,211
water/cemet ratio of grouting 0.4 including water supply, labor cost, all complete and accepted by Engineer.
Supplying, fabrication and fixing to details as per design M.S deformed bar as reinforcement of required size and length for all
types of RCC work in/c straightening the rod, removing rusts, cleaning, cutting, hooking, bending, binding with 24 no. GI wire,
10 Kgs 164.78 95 15,654
placing the bars in position, in/c lapping, spacing and securing them in position by concrete blocks, metal chairs, etc. complete as
per specifications, drawings and direction of the Engineer-in-charge. (60G Deformed Bar with 420 Mpa Yield Strength)
11 Additional Coarse sand, khoa & Brick bats use in soak pit by the direction of Engineer-in-charge. set 1.00 2,000 2,000
12 Inspection Pit of dimension 2'x2' with 1st class bricks with cement and sand including earthwork, brickwork, pit slab, finishing work Nos 4.00 4,000 16,000
all completed as per direction of Engineer in charge.
Total 231,163
Summary
Total Civil work 231,163
Civil Works
SL.NO DESCRIPTION OF WORK Quantity Unit
1 Earth Excavation 26.008 m3
2 Polythene Laying 9.363 m2
3 Brick Solling 9.363 m2
4 CC Work 1.404 m3
5 Brick work in Foundation 13.230 m3
6 Shuttering Work 9.363 m2
7 RCC Casting 1.515 m3
8 Sand Filling 22.161 m3
9 Net Cement Finishing 95.840 m2
10 Reinforcement Work 164.781 kgs
Earth Excavation
Size
Location Work At Length
mm
Foundation
Septic Tank Below EGL 2350
500
Soak Pit 0.7854
Total Earth cutting
Polythene Laying
Size
Location Work At Length
mm
Foundation
Septic Tank Below EGL 3750
500
Total Polythene Laying
Brick Solling
Size
Location Work At Length
mm
Foundation
Septic Tank Below EGL 3750
500
Total Brick solling
CC Work
Size
Location Work At Length
mm
Foundation
Septic Tank Below GL 3750
500
Total CC Work
Shuttering Work
Size
Location Work At Length
mm
Septic Tank Below EGL 3750
500
Total Shuttering Work
RCC Casting
Size
Location Work At Length
mm
Septic Tank Below EGL 2350
500
Soak Pit Below EGL 3.1416
250
600
Total RCC Work
Sand Filling
Size
Location Work At Length
mm
Reinforcement Wo
Main Bar No. of Item
Septic Tank 2
2
4
3
4
Total Reinforcement
Earth Excavation
Size
Quantity Total Volume
Breath Depth Volume (Cu.M.)
(No's) (Cu.M.)
mm mm
Polythene Laying
Size
Breath Depth Quantity Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
Brick Solling
Size
Quantity
Breath Depth Area (Sqm.) Total Area (Sqm.)
(No's)
mm mm
Shuttering Work
Size
Quantity Total Volume
Breath Depth Volume (Sqm.)
(No's) (Sqm.)
mm mm
2350 1 8.8125 8.8125
1100 1 0.55 0.55
Total Shuttering Work 9.3625
RCC Casting
Size
Quantity Total Volume
Breath Depth Volume (Cu.M.)
(No's) (Cu.M.)
mm mm
3750 112.5 1 0.99140625 0.99140625
1100 112.5 1 0.061875 0.061875
1550 375 1 0.001826055 0.001826055
375 1550 4 0.58125 0.58125
600 112.5 -3 -0.1215 -0.1215
Total RCC Work 1.514857305
Sand Filling
Size
Quantity Total Volume
Breath Depth Volume (Cu.M.)
(No's) (Cu.M.)
mm mm
Bill of Quantities of One storied RCC building for EPI Renovation and
Project: UNICEF GAVI Programme (HSS-2)
Location: Civil Surgeon Office, Shariatpur Sadar, Sariatpur
i. 1C-2x2.5mm2 BYM cable with 2.5mm² (BYA) ECC wire through through minimum 1'' thick PVC pipe
ii. 1C-2x4mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC Pipe
iii. 1C-2x6mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC pipe
iv. 1C-2x10mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC pipe
v 1C-4x16mm2 BYM Cable with 6mm2 (BYA) ECC through minimum 1.5'' thick PVC pipe or trench.
6 Light Fittings:
a Saucer light fitting with shade, brass holder, bracket earth terminal and necessary wiring etc. (without lamp).
i.
b Security Light
Water tight light fitting with cast aluminium base, splited aluminium cover, brass holder, earth terminal, wiring etc. (without lamp).
i.
Bill of Quantities of One storied RCC building for EPI Renovation and Extension (Electr
oject: UNICEF GAVI Programme (HSS-2)
cation: Civil Surgeon Office, Shariatpur Sadar, Sariatpur
1C-2x2.5mm2 BYM cable with 2.5mm² (BYA) ECC wire through through minimum 1'' thick PVC pipe
1C-2x4mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC Pipe
1C-2x6mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC pipe
1C-2x10mm2 BYM cable with 4mm2 (BYA) ECC through minimum 1'' thick PVC pipe
1C-4x16mm2 BYM Cable with 6mm2 (BYA) ECC through minimum 1.5'' thick PVC pipe or trench.
t Fittings:
Saucer light fitting with shade, brass holder, bracket earth terminal and necessary wiring etc. (without lamp).
Crescent Cat No. CP-8R Equivalent Product Like as Shwash/Gloria.
Security Light
Water tight light fitting with cast aluminium base, splited aluminium cover, brass holder, earth terminal, wiring etc. (without lamp).
Crescent Cat No. CBH-20 or equivalent product like as Shwash/Gloria
o Transfer Switch
MCB of required rating for over load and instaneous short circuit release, auto start and auto change over to load within 10 secduring normal power failure and auto
aland
for auto change
Internal over toWorks
Electrical normal supply within 5 minites after restoration of normal power supply indicator for three phase ON-OFF - Trip etc complete.
Total Electric work including VAT (15%)
Total
Word: Eight Lakh Thirty One Thousand Five Hundred Twenty Four BDT Only.