Construction of a new 33/11 kV, 2X5/6.66 MVA, regular type AIS Substation at Cumilla Cantonment under BBB-1,
Cumilla, BPDB. (Package No-05)
ABSTRACT COST OF
SECTION - 3 5,089,047.27
SWITCHYARD CIVIL WORKS
36
Supply,Installation & Commissioning of Lighting , set
Power Distribution Box: 63A TP MCCB (Main
Breaker),2nos. 6A SPMCB,2nos. 10A SPMCB,3nos. 1 3,000.00 4,000.00
16A SPMCB,1nos. 20A SPMCB,4nos. 40A
SPMCB,one spare
Emergency lighting rgency automated dc lighting
System in case of power failure for Control Room
building, Including: Supply,installation and
commisioning of of Emergency lighting System,
37 with all necessary accessories, complete in all respect Lot 1.00 7000.00 10000.00
as per approved drawing specification and accepted
by the Engineer-in-charge.
SECTION - 2
SL Description Unit Quantity Rate in Taka Total Amount Remarks
A) General Site Work
Site surface cleaning, all obstacle removal,
transporting & disposing (Include but not limit:
tree,grass,exising building,pole,tower,stepc Subcontractors need
1 tank,soak well,underground pilp& cable,etc.), Lot 1.00 200,000.00 200,000.00 to fully inspect the
Cleaning, transporting & disposing of cultivated site
soil,etc. as per drawing and direction of the
engineer-in-charge
B) Hydraulic Part
Supplying, fitting & fixing of food grade plastic
Overhead water tank(2000liter) on the top of the
control room building & underground water
reservoir (tank, 2000liter), 1set water lifting
pump, 1set suction pump and portable water
supply system, with all necessary accessories
(such as: column pipe (AP1-5L, grade B) with
flange, gasket,Non-return valve, pressure
gauge, 40 meter (131'-0'') long required marine
cable in a single length etc), complete in all
respect as per approved drawing [Design shall
be based on use of 10 persons per day] and
accepted by the Engineer-in-charge.
1 (Pump specification: capacity multistage sub- Lot 1.00 12,000.00 12,000.00
mersible water Pump Motor Set manufactured
according to DIN/NEMA/IEC/BS/VDE/JIS & ISO
9001 standard comprising of 2900 RPM, 3
Phase sub-mersible motor having Insulation:
Class F & Protection: IP68(Minimum) , suitable
for operation at 400 /230± 5% volt, 50 Hz AC.
Motor : 2 H.P. Suction X Delivery: 50mm
X50mm. Discharge : 50-300 liter/min. Head : 23
meter. Column pipe : 50 mm
Supplying, fitting and fixing of PP-R Pipe
meeting the perfomance and long-tem strength
requirements as per DIN 8077/78 or ASTM F
2983 including nipple, elbow, reducers, Tee, end
cap, plug, socket, Union, Gate Valve etc as per
manufacturer instuction . all complete accepted
by the Engineer-in -charge.
2
Formwork/shuttering(wooden)The
formwork must be rigid enough both in
and out of plane, to make the concrete
surface true to the designed shape and
size, along with prop and necessary
supports etc. all complete approved and
accepted by the Engineer. and removal
of form after hardening of the concrete &
the concrete strength meets the design
11 and specification requirements. The sqm 116.00 380.00 44,080.00
formwork support design and calculation
shall be submitted to the engineer for
review in advance before construction
and construction in accordance with the
approved design.
Steel Rail
14
Supplying of Steel heavy Rail
(44kg~50kg/m, for power
transformer installation, as per
Kg 858.00 130.00 111,540.00
drawing and direction of the
14 engineer-in-charge)
Formwork/shuttering (wooden),The
formwork must be rigid enough both in
and out of plane, to make the concrete
surface true to the designed shape and
size, along with prop and necessary
supports etc. all complete approved and
accepted by the Engineer. and removal
of form after hardening of the concrete &
the concrete strength meets the design
8 and specification requirements. The sqm 85.00 406.00 34,510.00
formwork support design and calculation
shall be submitted to the engineer for
review in advance before construction
and construction in accordance with the
approved design.
LA CT &Station trasformer
C) Foundation
Earth work in excavation of all kinds
of soils of foundation trenches including
leveling, ramming and preparing the
base, bailing out water and shoring if
necessary, providing centre line and
1 bench mark pillars, removing the spoils Cum 28.00 220.00 6,160.00
etc. to a lead not exceeding 60m. all
complete as per direction of the Engineer
in charge.
7 Formwork/shuttering (wooden),The
formwork must be rigid & flatness
enough both in and out of plane, to make
the concrete surface true to the designed
shape and size, and flat enough not need
to decorate, along with prop and
necessary supports etc. all complete
approved and accepted by the Engineer.
and removal of form after hardening of
the concrete & the concrete strength
meets the design and specification sqm 446.00 406.00 181,076.00
requirements. The formwork support
design and calculation shall be submitted
to the engineer for review in advance
before construction and construction in
accordance with the approved design.
Decorate of brickwall:
12MM THICK CEMENT PLASTER WITH
10 NEAT CEMENT FINISHING (N..C.F.) ; sqm 217.67 850.00
1 SEALER COAT PLUS 2 FINISHING COATS
OF approved colored weather coat
B) Demolish part
Demolish, transporting & disposing of Existing
old Boundary wall ,,as per drawing and direction
1 of the engineer-in-charge, all complete approved m 79.00 385.00
and accepted by the Engineer.
Remove the old painting of existing Boundary
2 wall and renevate the existing Boundary wall sqm 50.00 2,200.00
TOTAL COST =
t AIS Subtation
OPMENT BOARD (BPDB)
28,604.40
18,202.80
30,473.44
9,466.60
179,496.00
103,578.75
55,971.00
27,208.13
225,000.00
70,999.50
14,850.00
87,066.00
185,015.25
154,612.88
42,660.00
2,700.00
30,415.00
110,000.00
1,266,319.74