Foundation & PB
a 0 to 1.5m depth 5419.49 C.ft 15.00 81292.34
b 1.5m to 3.0 m depth 909.38 C.ft 17.00 15459.38
Supplying and filling of M Sand in basement in layers not exceeding
6"/(As per Drawing) in depth including watering, consolidation,
1.04.00 ramming etc., complete. As per Design Drawings / Technical
Specifications BIS standard codes, as directed by Engineer In charge
etc., complete in all respects.
Page 1 of 92
S.no Description of Work Qty Unit Rate Amount Remarks
Page 2 of 92
S.no Description of Work Qty Unit Rate Amount Remarks
Supply and Laying of 9" thk Brick masonry in CM 1:5 using bricks of
strength 75 KG/Sq.cm, as per IS1077:1992, Construction of brick
Masonry as per IS 2212:1991, 230 mm X 115 mm X 75 mm size
Laying in true line level and plumb and cleaning the surface with
necessary tool tackles etc. at all floors, all height, all levels and
3.01.00
all places including Lead and lift ,curing, scaffolding and working
platforms, racking/ flush jointing including chips 1:2:4 packing with
waterproofing compound between block work and RCC Beam etc.
complete, as per drawing/specification and as directed by Engineer in
charge.
Half brick masonry 4.5" thick partition walls in CM 1:4 using bricks of
strength 75 KG/Sq.cm, as per IS1077:1992, Construction of brick
Masonry as per IS 2212:1991, 230 mm X 115 mm X 75 mm size
Laying in true line level and plumb and cleaning the surface with
3.02.00
necessary tool tackles etc, reinforced with hoop iron 25mm by 15
gauge at every 4th course or 2 nos of 6 mm dia MS round rods at every
4th course embedded in CM including scaffolding, staging, curing, etc.,
complete excluding plastering at all levels and for all heights.
Page 3 of 92
S.no Description of Work Qty Unit Rate Amount Remarks
Plastering 15mm thick with cement mortar in proportion 1:4 with
cement and P Sand (particles shall be in the range less than 2.36mm
size) for the Internal surfaces of Walls, sides Columns, Jambs of
Windows & Doors etc in all floors, including chipping /hacking the
RCC surfaces as directed by the Engineer in charge to provide a good
key to the cement mortar. Add Rendercon Super as per the dose
recommended by the the manufacturer. Mixing to be done with
Measurement Boxes only. Providing and fixing plaster mesh made out
of G.I of nominal thickness of 0.35mm with a zinc coating of
4.02.00
120gms/Sft of Arpitha make or equal at the junctions of the block work
and RCC with galvanized nails with the mesh extending 150 mm on
either side of the junction, scaffolding, including 7 Days curing using
Sprinkler / Sprayer for all Vertical surfaces, Mortar Trays to be used for
mixing mortar, Mortar mixing shall not be allowed on the floor and
finishing in perfect line and level with sponge ready to receive putty,
primer and acrylic emulsion paint etc. complete. As per Design
Drawings / Technical Specifications BIS standard codes, as directed by
Engineer In charge etc., complete in all respects.
a Ground Floor 5528.24 Sq.ft 55.00 304053.45
b First Floor 8195.22 Sq.ft 60.00 491713.07
Page 4 of 92
S.no Description of Work Qty Unit Rate Amount Remarks
Painting the External wall surfaces at all floors with Two coats of
Weather shield Exterior Emulsion paints of approved brand a coats
of Primer .The primer shall be applied after cleaning the wall surfaces
5.03.00
and removing all undulations, cement mortar, cement slurry, etc. As per
Design Drawings / Technical Specifications BIS standard codes, as
directed by Engineer In charge etc., complete in all respects.
Page 5 of 92
S.no Description of Work Qty Unit Rate Amount Remarks
Providing and laying Glazed finish Vitrified tile wall cladding, using
size of tile 600 x 300mm x10mm thick As per IS 13712:2006 / ISO
13006 Standard (Shade and Quality to be approved by the Architect)
over cement mortar 1:3 (one part of cement, four parts of M sand), 18
mm thick, fixed with the cement paste, and all corners should be
finished with Miter joints finish, Mixing to be done with Measurement
Boxes only, on site cutting the tiles to set them perfectly to the size and
6.06.00
shape of the room, including supply and fixing of pvc beading at
corners, cleaning all the grey cement slurry from the joints before it
sets, pointing with laticrete aqua or equal of matching colour, finishing
to perfect line and level etc. Complete including final Acid / Soap wash.
As per Design Drawings / Technical Specifications BIS standard codes,
as directed by Engineer In charge etc., complete in all respects (Basic
cost as Rs. 65 /Sft Locations: Toilet Wall .
7.00.00 JOINERYS
7.02.00 Flush Door With Laminted finish
a Ground Floor 144.00 Sq.ft 750.00 108,000.00
b First Floor 148.00 Sq.ft 750.00 111,000.00
Providing & Fixing of Sliding Windows at all levels made out from
Unplasticised Poly Vinyl chloride frame (UPVC) of natural color
pristine white with outer frame of 56 x 48 x 30 mm shutter frame for
sliding Section 40 x 56 x 40 mm, shutter 67 x 38 x 51 mm with wall
thickness of 2mm (+ /-0.3mm) for sliders with locking system of push
lock in centre, sliding run over sliding rollers, and casement windows
7.03.00
with espag multipoint locking systems, gaskets made out of EPDM
(Ethylene Propylene Dimonmer) and all the joints should fusion welded
and applying silicon sealants (GE make or Wacker make) outside and
acrylic sealant inside including single glazing of 5mm thick clear float
glass rate inclusive of transportation, scaffolding, finishing the jambs
etc. complete as per drawing & direction.
Page 7 of 92
S.no Description of Work Qty Unit Rate Amount Remarks
7. The treated area shall be tested by ponding water for at least 7 days.
As per Design Drawings / Technical Specifications BIS standard codes,
as directed by Engineer In charge etc., complete in all respects.
Page 8 of 92
S.no Description of Work Qty Unit Rate Amount Remarks
11.09.00 E.B Earth Bit Work 1.00 Nos L.S 20,000.00
11.10.00 NMR Work For Civil 1.00 Nos L.S 30,000.00
11.11.00 NMR Work For Plumping & Eletrical Work 1.00 Nos L.S 15,000.00
11.12.00 Sevent Room Service Work For ( Civil, Plumping & Eletrical Work ) 1.00 Nos L.S 40,000.00
11.13.00 Deparies Cleaning & Floor Cleaning Work Work 1.00 Nos L.S 20,000.00
11.14.00 Compound Wall 460.00 R.ft 1200.00 552,000.00
TOTAL AMOUNT FOR SECTION - 11 3,427,000.00
Round off 2235.60
TOTAL AMOUNT 2,00,00,000/-
Page 9 of 92
PROPOSED CONSTRUCTION OF RAFEEQ MOHAMED VILLA AT ARASARKULAM IN PUTHUKOTTAI
A4, F4 Footing & servent Room Colums 1 5 4.750 4.750 6.000 676.875
0'41/2" Beams
B4 to E4 1 1 18.395 0.750 0.500 6.898
Page 10 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
A4, F4 Footing & servent Room Colums 1 5 4.750 4.750 1.000 112.813
2 M Sand Filling
For Footing
Page 11 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
0'41/2" Beams
B4 to E4 1 1 18.395 0.750 0.500 6.898
Page 12 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
3 PCC 1:4:18
For Footing
Page 13 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
0'41/2" Beams
B4 to E4 1 1 18.395 0.750 0.500 6.898
Page 14 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 15 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Plinth Beam
Horizontal Side
A4 to D4 GB3 Beam 1 1 26.312 0.750 1.500 29.601
Vertical Side
F1' to F2' GB1 Beam 1 1 24.100 0.750 1.000 18.075
North, West, South Sides NB1 Beam 1 8 1.500 0.375 1.500 6.750
Page 16 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Colum Concrete
Ground Floor
For Colum Concrete
Page 17 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Lintel Beam
Horizontal Side
Vertical Side
Page 18 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
North, West, South Sides NB1 Beam Sill Beam 1 8 1.500 0.375 0.333 1.499
Page 19 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
1112.510
Page 20 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Vertical Side
First Floor
First Floor Colum Concrete
Page 21 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Horizontal Side
Vertical Side
Page 22 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
North, West, South Sides NB1 Beam Sill Beam 1 8 1.500 0.375 0.333 1.499
Page 23 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
1112.510 C.ft
Vertical Side
Page 24 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
5 Shuttering Work
Page 25 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Vertical Side
F1' to F2' GB1 Beam 1 2 24.100 48.200 1.000 48.200
North, West, South Sides NB1 Beam 2 8 1.500 24.000 1.500 36.000
Page 26 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Vertical Side
F1' to F2' GB1 Beam 1 2 24.100 - 0.500 24.100
Page 27 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
North, West, South Sides NB1 Beam Sill Beam 2 8 1.500 - 0.333 7.992
Page 28 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 29 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Vertical Side
Page 30 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 31 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Horizontal Side
Vertical Side
North, West, South Sides NB1 Beam Sill Beam 2 8 1.500 - 0.333 7.992
Page 32 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 33 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Vertical Side
Page 34 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 35 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Horizontal Side
Page 36 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Vertical Side
Page 37 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Dinning & Staircase East & West Side Wall 1 2 37.000 0.750 8.750 242.813
Bed Room -1 Toilet North Side Wall 1 1 17.000 0.750 8.750 111.563
Page 38 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Bed Room -1 Toilet west Side Wall 1 1 10.500 0.750 8.750 68.906
Serevent Room & Toilet All Round Wall 1 1 54.000 0.750 13.500 546.750
Page 39 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Balcony North & South Side Wall 1 2 3.250 0.750 10.500 51.188
Bed Room - 2 & Study Room West Side Wall 1 1 24.750 0.750 8.500 157.781
Head Room Staircase West Side Wall 1 1 10.500 0.750 9.000 70.875
Page 40 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Bed Room - 4 Toilet South Side Wall 1 1 5.833 0.750 9.000 39.373
Bed Room - 4 Toilet west Side Wall 1 1 14.667 0.750 9.000 99.002
Bed Room - 4 Balcony East & West Side Wall 1 2 5.000 0.750 10.500 78.750
Bed Room -1 Toilet North & South Sides Wall 1 2 17.000 - 10.500 357.000
Page 41 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Horizontal Side
0.000
Page 42 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 43 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 44 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 45 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 46 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Staircase Area & Living Area All round 1 1 123.416 - 11.000 1357.576
Page 47 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 48 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 49 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Living Hall & Bed Room Front Extra Height 1 1 37.750 - 2.750 103.813
Page 50 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 51 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 52 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Page 53 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
282.00
Page 54 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
258.00
UPVC Window
UPVC Ventilators
Page 55 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
Laminated Door
All Toilet Door & Back Side Door 1 5 2.750 8.000 - 110.00
Page 56 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
All Toilet Door & Back Side Door 1 6 2.750 8.000 - 132.00
Steel Door
Page 57 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
1 23 1.000 - - 23.000
1 22 1.000 - - 22.000
Page 58 of 92
S.no Description of Work Nos L B D Qty Total Qty Unit
1 19 1.000 - - 19.000
1 18 1.000 - - 18.000
Page 59 of 92
BARBENDING SCHEDULE
Cutting Total 8
SI No Description Dia Set Nos
Length Length mm
i Footing Rods
1 A1 Footing Top & Bottom Rods 12 mm 1 2 10 7.50 150.00 -
2 Severent Room Colum Footing 12 mm 6 2 10 7.50 900.00 -
3 S.C Colum Matt Top & Bottom Rod 10 mm 14 2 4 5.50 616.00 -
4 C1, F1,C2,D2 Footing Top & Bottom Rod 12
mm 4 2 20 10.00 1,600.00 -
5 F2,C7 Footing 16 mm 1 2 12 10.50 252.00 -
6 A3,A2 Footing 12 mm 2 2 11 8.00 352.00 -
7 B3,E3,F3 Footing 12 mm 3 2 14 8.25 693.00 -
8 A4,F4 Footing 12 mm 2 2 8 6.75 216.00 -
9 B4,E4 Footing 12 mm 2 2 10 7.17 286.68 -
-
Colum Rods -
C1 Colum Main Rod ( 0'9" X 1'0" ) 12 mm 7 1 4 36.00 1,008.00 -
Lapping 12 mm 7 2 4 2.00 112.00 -
C1 Colum Main rod 16 mm 7 1 2 36.00 504.00 -
Lapping 16 mm 7 2 2 2.75 77.00 -
Striups 8 mm 7 1 52 3.00 1,092.00 1,092.000
C2 Colum Main Rod ( 0'9" X 1'3" ) 12 mm 2 1 4 36.00 288.00 -
Lapping 12 mm 2 2 4 2.00 32.00 -
C2 Colum Main Rod 16 mm 2 1 2 36.00 144.00 -
Lapping 16 mm 2 2 2 2.75 22.00 -
Striups 8 mm 2 1 52 3.50 364.00 364.000
C3 Colum Main Rod ( 0'9" X 1'3" ) 16 mm 1 1 6 36.00 216.00 -
Lapping 16 mm 1 2 6 2.75 33.00 -
Striups 8 mm 1 1 52 3.50 182.00 182.000
C4 Colum Main Rod ( 0'9" X 1'3" ) 16 mm 2 1 6 36.00 432.00 -
Lapping 16 mm 2 2 6 2.75 66.00 -
C4 Colum Main Rod 12 mm 2 1 2 36.00 144.00 -
Lapping 12 mm 2 2 2 2.00 16.00 -
Striups 8 mm 2 1 52 3.50 364.00 364.000
C5 Colum Main Rod ( 0'9" X 1'3" ) 16 mm 3 1 6 36.00 648.00 -
Lapping 16 mm 3 2 6 2.75 99.00 -
C5 Colum Main Rod 12 mm 3 1 2 36.00 216.00 -
Lapping 12 mm 3 2 2 2.00 24.00 -
Striups 8 mm 3 1 52 3.50 546.00 546.000
C6 Colum Main Rod ( 0'9" X 1'6" ) 20 mm 4 1 8 36.00 1,152.00 -
C6 Colum Main Rod Front Height 20 mm 2 1 8 3.00 48.00 -
Lapping 20 mm 4 2 8 3.67 234.69 -
Striups 8 mm 4 1 56 4.00 896.00 896.000
C7 Colum Main Rod ( 0'9" X 1'9" ) 20 mm 1 1 10 36.00 360.00 -
Lapping 20 mm 1 1 10 3.25 32.50 -
Striups 8 mm 1 1 52 4.50 234.00 234.000
S.C Colum Main Rod ( 0'9" X 0'9" ) 12 mm 14 1 4 10.50 588.00 -
Striups 8 mm 14 1 15 2.50 525.00 525.000
mm -
mm -
mm -
mm -
mm -
mm -
mm -
-
- 4,203.000
Total Length 4,203.000
Dia In Weight 504.360
Total Weight
Steel Metric Ton
Total Length 18,066.564
Dia In Weight 2,167.988
Total Weight
Steel Metric Ton
CHEDULE
10 12 16 20 25
Remark
mm mm mm mm mm
- - - - -
- 900.000 - - -
616.000 - - - -
- 1,600.000 - - -
- - 252.000 - -
- 352.000 - - -
- 693.000 - - -
- 216.000 - - -
- 286.680 - - -
- - - - -
- - - - -
- 1,008.000 - - -
- 112.000 - - -
- - 504.000 - -
- - 77.000 - -
- - - - -
- 288.000 - - -
- 32.000 - - -
- - 144.000 - -
- - 22.000 - -
- - - - -
- - 216.000 - -
- - 33.000 - -
- - - - -
- - 432.000 - -
- - 66.000 - -
- 144.000 - - -
- 16.000 - - -
- - - - -
- - 648.000 - -
- - 99.000 - -
- 216.000 - - -
- 24.000 - - -
- - - - -
- - - 1,152.000 -
- - - 48.000 -
- - - 234.688 -
- - - - -
- - - 360.000 -
- - - 32.500 -
- - - - -
- 588.000 - - -
- - - - -
-
RATE ANALYSIS
Date : 30/09/2023
S.no Description of Work Qty Unit Rate Amout
1 Earth Work Excavation
a Up to 1.50 m 1.00 Cu.m 15.00 15.00
b Up to 2.00 m 1.00 Cu.m 17.00 17.00
6200.00
175.74
-0.74
175.00
5945.80
4 Steel Reinforcement
Fe 550 Vizag Steel 1000.00 kg 80.00 80000.00
Binding Wire 12.00 kg 90.00 1080.00
Labour 1000.00 kg 6.00 6000.00
87080.00
Wastage 3% 1.00 Ton 2612.40 2612.40
Plant & machinery 1% 1.00 Ton 870.80 870.80
Lifting & Placing 1% 1.00 Ton 870.80 870.80
Over Head 10% 1.00 Cu.m 8708.00 8708.00
Profit 15% 1.00 Ton 13062.00 13062.00
Others -1.00 Ton 4.00 -4.00
113200.00
19 Ventilators
Upvc Ventilators With Fittings 10.76 Sq.ft 450.00 4842.00
Over Heads 2% 1.00 Cu.m 96.84 96.84
Profit 10% 1.00 Sq.m 484.20 484.20
Others 1.00 Sq.m 1.96 1.96
5425.00
510.83
-0.83
510.00
20 Grill Work
Ventilator & Window Grill ( Squre Rod )
17.00 Kg 130.00 2210.00
With Fixing Labour Charage
Grill Paintng Work 10.62 Sq.ft 18.00 191.16
Over Heads 10% 1.00 Cu.m 221.00 221.00
Profit 15% 1.00 Sq.m 331.50 331.50
Others 1.00 Sq.m 1.34 1.34
2955.00
278.25
1.75
280.00
21 Wheathering Coarse Work
Lime 17.50 Kg 7.00 122.50
Sand 5.00 C.ft 55.00 275.00
Brick Jelly 10.00 C.ft 15.00 150.00
Labour 10.76 Sq.ft 25.00 269.00
816.50
Conceyance & Wastage 3% 1.00 Cu.m 24.49 24.49
Lifting & Placing 2% 1.00 Cu.m 16.33 16.33
Over Heads 10% 1.00 Cu.m 81.65 81.65
Profit 15% 1.00 Cu.m 122.48 122.48
Others -1.00 Cu.m 1.45 -1.45
1060.00
99.81
0.19
100.00
R01
Date : 30/09/2023
Remarks Correction Remarks '
Title to be change
Compaction coefficient to be added
Cu.m
C.ft
Sq.m
Sq.ft
3.44 351.5625
14.124
Cu.m
C.ft
7.5
Cu.m
C.ft
M.Ton
Rate to be check
Cu.m
C.ft
Sq.m
Sq.ft
0.25
Sq.m
Sq.m
Sq.m
Sq.m
Sq.ft
check the coefficient
Sq.m
high rate
Sq.m
Sq.m
Sq.ft
Sq.m
Sq.ft
Sq.m
Sq.ft
Check the price of Marble 156.75
R.m
Sq.m
Sq.ft
Sq.m
Sq.ft
Sq.m
Sq.ft
Sq.m
Sq.ft
Sq.m
Sq.ft
Sq.m
Sq.ft
Sq.m
Sq.ft
R.m
R.ft
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
Cu.m
R.C.C Concreate M20 1:11/2:3
Cement 375.00 Kg 7.00 2625.00
Sand 14.00 C.ft 55.00 770.00
40mm Jelly 28.00 C.ft 47.00 1316.00
Labour 35.28 C.ft 35.00 1234.80
5945.80
Conceyance & Wastage 3% 1.00 Cu.m 178.37 178.37
Lifting & Placing 2% 1.00 Cu.m 118.92 118.92
Over Head 10% 1.00 Cu.m 594.58 594.58
Profit 15% 1.00 Cu.m 891.87 891.87
Others 1.00 Cu.m 0.46 0.46
7730.00 Cu.m
PROPOSED CONSTRUCTION OF RAFEEQ MOHAMED VILLA AT ARASARKULAM IN
PUTHUKOTTAI
1759.59