Sl. No DESCRIPTION OF WORK UNIT QTY RATE AMOUNT
I EARTHWORK EXCAVATION:
1.1 Excavation in all types of soil including dense/loose soil,
disintegrated and weathered soft rock including demolition of
any existing concrete portion with suitable mechanical
excavator and manually wherever required upto required level
as shown in the drawing .Carting away and disposing the same
of an approved location. The rate shall include for installing
and maintaining proper approved dewatering system to ensure
clear working area including necessary shoring & strutting to
avoid soil collapse. The contractor shall be paid only for the
excavation on the basis of plan area x depth mentioned in the
relevant drawing.
The rate shall also include satisfying all safety norms,
general house keeping .
FILLING:
1.2 Refilling in foundation and basement with good available CFT 3006.00 10 30060.00
excavated earth in layer of 150mm well watered rammed and
consolidated etc complete quarried from a good quarry, free
from clays, lumps, vegetation roots, pebbles and other foreign
impurities.
1.3 Filling in foundation and basement with good filling EARTH in CFT 4250.80 35 148778.00
layer of 150mm well watered rammed and consolidated etc
complete quarried from a good quarry, free from clays, lumps,
vegetation roots, pebbles and other foreign impurities. The
sample of filling EARTH is to be approved by Development
Manager/Client Engineer incharge.
V MASONRY WORK
5.1 BRICK WORK
Brickwork in 230mm thick with Cement Mortar 1:5,using Best
quality locally available bricks having a crushing strength of
minimum 50kg/Sqcm including all scaffolding, curing etc.
complete. The thickness of joints should not exceed 12mm
and each brick layer to be in one line and level and the brick
wall so constructed shall be true to plumb.
Brickwork in 230mm thick with Cement Mortar 1:5,using Best cft 122.00 175 21350.00
quality locally available bricks having a crushing strength of
minimum 50kg/Sqcm including all scaffolding, curing etc.
complete. The thickness of joints should not exceed 12mm
and each brick layer to be in one line and level and the brick
wall so constructed shall be true to plumb.In all Levels
6.1.2 Providing and fixing second class teakwood Frame of size 100 sft 126.00 850 107100.00
x 75mm flush shutter 40mm thick solid core dehyde phenol
bonded fixed door frame with 3nos of 125mm oxidised brass
hinges. The rate to be quoted will include cost of 6 Nos M.S
Hold fasts of size 150mm x 150mm x 6mm, cost of Brass
Tower bolts 2Nos 150mm long and with Godrej make central
lock with diplomatic handle etc complete apart from one No
Stainless Steel padlock. All the furniture fittings should be of
approved make and should bear I.S.Mark. The rate quoted
should also include cost of one coat of preservatiive paint and
one coat of primer and cost of Grouting fasts with M20
Concrete.
6.3 UPVC-Ventilator
UPVC - as per manufactures specification sft 32.00 750 24000.00
.
6.3 UPVC-French ventillator
UPVC - as per manufactures specification sft 77.00 1500 115500.00
Riser
8.2.2 Providing and laying Granite flooring 25mm thick approved sft 54.00 280 15120.00
Granite stone machine cut,machine polished about 150 mm
height riser into full length of step. Riser to be bedding over
cement sand mortar in ratio of 1:5 including cleaning and
preparing the surface for bedding, spreading neat cement
slurry using minimum cement about 2 kg/Sq.m over cement
mortar bed ,joint to be cleaned and grouted with approved
matching colour , polishing, cleaning, curing and complete as
directed(basic cost Rs 100 per sft)
Landing
8.2.3 Providing and laying Granite flooring 25mm thick in landing and sft 198.00 280 55440.00
passage bedding over cement sand mortar in ratio of 1:5
including cleaning and preparing the surface for bedding,
spreading neat cement slurry using minimum cement about 2
kg/Sq.m over cement mortar bed ,joint to be cleaned and
grouted with approved matching colour , polishing, cleaning,
curing and complete as directed in landing(basic cost Rs 100
per sft)
8.3 Flooring with Ceramic Tiles in toilet sft 198.00 120 23760.00
Prepare the surface and provide 300mm x 300mm Anti skid
ceramic tiles flooring of approved manufacture and shade
bedded in cement mortar 1 : 3 including cleaning and
preparing the surface for bedding, including pointing the joints
with 3mm epoxy grouting , cleaning with Acid with all lead, lifts
etc., in all floors.(basic cost Rs 50 per sft)
8.4 Dadoing Walls with glazed tiles -1'0" x1'0" in toilet sft 1018.00 130 132340.00
Dadoing to wall with glazed tiles -1'0" x1'0" tiles of approved
pattern size/quality/shade over CM 1:4 12mm thick with
necessary cement grout for proper binding of tiles to mortar
including pointing the joints and closing the voids with white
cement, cleaning etc.complete. (basic cost Rs 70 per sft)
Staircase handrail
10.2 Providing and fixing brushed stainless steel baluster buffed rft 85.00 950 80750.00
neatly comprising 50 mm dia stainless steel hand rail brushed
and buffed neatly and resting over 25mm dia stainless steel
vertical pipe at 900 mm center to center embedded at this
bottom in concrete by chipping, chipping erecting the pipe to
plumb grouting etc complete. the gap between the vertical
posts are fixing with additional horizontal posts as mentioned
above , all as shown in the drawing complete.and finishes to
be done as per Architects approval.
TOTAL 7581812.86
X MISCELLANEOUS:
11.01 Construction of Over head water Tank with Two
Compartments With RCC raft and walls with steel
reinforcement as per structural dwgs. Floor and walls shall be
plastered with water proof compound for leak proof with Tiles
For Floor & Wall. Rate includes cost of all materials, labour,
man hole cover, etc. complete
14 Compound Wall
14.01 9" thick wall 6'-0" heigh with 7'0" c/c 230mm Pile Plastered on rft 117.13 3100 363087.50
the both sides. (Estimated cost
only-Actual cost wil be calculated based on work executed)
Supply and installation rain water harvesting pit of height h' No's 2.00 14000 28000.00
high -made of ferro cement chamber with necessary filling
material, along with 10' auger pit
14.02 P.C.C Works
Providing and laying in position cement concrete of specified sft 143.14 160 22902.40
grade ex-cluding the cost of
centering and shuttering – All work upto plinth level: 1:4:8
below foudation (1 cement : 4 coarse sand: 8 graded stone
aggregate of 40mm nominal size)
14.04 Compound wall M S Gate size of (16'4 1/2"x6'0") No's 1.00 80000 80000.00
14.05 MS Wicket gate size of (7'0" x 6'0") No's 1.00 22000 22000.00
15 Supply and Fixing of Balcony Glass Railing (As per Elevation) rft 67.25 1850 124412.50
Exclusions: