Balance Stretches ( From Kalamboli Junction (115/800 ) to BARC Junction (140/690) on Sion-Panvel Highway BOT
Project)
BILL OF QUANTITIES (BOQ)
Item Rate
Description Unit Qty Amount
No. In figure In words
Sub Estimate Nos. 1: Site Clearance
1.01 Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and scaffolding
wherever necessary, sorting the dismantled material, disposal of
unserviceable material and stacking the serviceable material with
all lifts and lead as directed etc. complete.