Bill No : 1 -Construction of Flyover

Sl. No. Description Unit Quantity Rate Amount

Earthwork in Excavation of foundation for


structures in all types of soil including lead and
6.01
lifts complete as per Tech. Spec. Cl. 304 MORTH
(Fifth Rev)
a) ordinary soil Cu.m. 3,517.00
b) in soft /Weathered Rock Cu.m. 1,319.00

Back Filling behind abutments, wing walls, return


walls and foundation trenches with Selected
6.02 Granular Material of approved quality complete Cu.m. 1,485.00
with all leads as per Tech. Spec. Cl.710.1.4 of
IRC:78and lifts complete

Providing and laying Filter Media behind


abutments, box structures, wing walls & return
walls with well packed material to the specified
thickness with smaller size towards the soil and
6.03
bigger size towards the wall complete with all
leads and lifts as per drawings and Technical
Specifications Clauses 305, 309, 2504, Section
2200 and Clause 710.1.4 of IRC:78
Cu.m. 542.00

Cement Concrete in Leveling Course including


centering and shuttering but excluding
6.04
reinforcement all complete as per Tech. Spec.Cl.
1500, 1700 & 2100 MORTH (Fifth Rev)
a) M15 Grade - Leveling Course Cu.m. 128.00
b) M15 Grade - Below Approach Slab Cu.m. 16.00
Cement Concrete Grade M30 in Sub-Structures
6.05 and Foundation as per Tech. Spec. Cl. 1700.
MORTH (Fifth Rev)
a) in Foundation Cu.m. 790.00
b) in Sub-Structure Cu.m. 1,191.00

Cement Concrete Grade M30 in Super Structures


6.06
as per Tech. Spec. Cl. 1700. MORTH (Fifth Rev)
a) in RC Girder Cu.m. 360.00

Cement Concrete Grade M40 in Super Structures


6.07
as per Tech. Spec. Cl. 1700. MORTH (Fifth Rev)
a) in footpath / Kerb , Pedestals etc Cu.m. 12.00

PSC Cement Concrete Grade M40 in Super


6.08 Structure as per Tech. Spec. Cl. 1700. MORTH
(Fifth Rev)
a) in PSC I Girder Cu.m. 481.00

Providing, cutting, bending and fixing in position


of HYSD / TMT bar reinforcement in reinforced
6.09 cement concrete structures complete as per
Tech. Spec. Cl 1600 MORTH (Fifth Rev) with
CORROSION PROTECTION
a) in Foundation MT 72.00
b) in Sub-Structure MT 120.00
c) in Super-Structure MT 156.00

Providing High Tensile Steel Strands including all


accessories for stressing and jacking operations
6.10 MT 14.00
and grouting etc. complete as per Technical
Specifications Section - 1800MORTH (Fifth Rev)
Providing Weep Holes in abutments, return walls,
with 100mm dia AC pipes complete as per
6.11 No's 574.00
drawing and Tech. Spec. Cl. 2706 MORTH (Fifth
Rev)

6.12 Providing and fixing Expansion Joint

a) Strip seal jt. in PSC Girder catering to


Rmtr 96.00
maximum horizontal movement upto 70 mm

Providing and Fixing 20mm Thick Compressible


Fibre Board in expansion joint complete including
6.13 cost and conveyance of all materials, labour, Rmtr 57.00
fixing in position, etc., complete as per drawing
and Tech. Spec. Cl. 2605 MORTH (Fifth Rev)

Providing and fixing Tar Paper Bearing complete


6.14 Sq.m 14.00
as per drawing and IRC:SP:13-1973.

Providing, supplying, fitting and fixing in position


true to line and level Elastomeric Bearings
6.15 Cu.Cm. 5,90,848.00
conforming to IRC:83 (part-II) section IX complete
as per Tech. Spec. Cl. 2000 MORTH (Fifth Rev)

Proving and fixing Drainage Spouts complete as


6.16 No's 18.00
per Tech. Spec. Cl. 2705 MORTH (Fifth Rev)

Reinforced Cement Concrete M - 30 Grade in


Approach Slab including Reinforcement and
6.17 form work complete as per drawings and Tech. Cu.m. 47.00
Spec. Cl.1500, 1600, 1700 & 2704 MORTH (Fifth
Rev)

Providing and Filling Joint Sealing Compound as


per drawings with coarse sand and 6 percent
bitumen by weight (0.083 kg/m bitumen)
6.18 including cost and conveyance of all materials, Rmtr 28.00
labour, fixing in position, etc., complete as per
drawing and Tech. Spec. Cl. 2605 MORTH (Fifth
Rev)

Providing and laying Wearing Course on top of


deck complete as per Tech.Spec.Cl.515 & 2702
6.19 Sq.m 1,474.00
MORTH (Fifth Rev) - 65mm Thick (40BC+ 25
Asphaltic)

Construction of Crash Barrier M40 Grade incl.


cost of all materials, labour, lead, lifts, loading,
6.20 Rmtr 348.00
unloading etc., Excluding Reinforcement
complete

6.21 PVC Utility pipes (150 dia) Rmtr 348.00

Providing and Applying 2 coats of Enamel Paint


to plastered concrete surface complete as per
6.22 Sq.m 870.00
Tech.Spec Cl. 800 MORTH (Fifth Rev) for RC Crash
barrier

Providing and applying 2 coats of Protective


6.23 paint to exposed concrete surface as per Sq.m 1,535.00
Tech.Spec Cl. 800 MORTH (Fifth Rev)

Painting details of Structure and span


6.24 arrangements as Tech.Spec.Cl. 800 MORTH (Fifth No's 1.00
Rev)
Provide and Lay Boulder Apron / Floor complete
6.25 Cu.m. 3,486.00
as per Tech. Spec. Cl. 2503.MORTH (Fifth Rev)

Provide and Lay Stone Pitching as per Tech. Spec.


6.26 Cu.m. 405.00
Cl. 2504.MORTH (Fifth Rev)

6.27 RC Railings rmtr 150.00

Providing and fixing 150 mm dia. GI pipe of


approved quality for drainage purposes
including clamping arrangement with the
6.28 Rmtr 120.00
structure as per Tech. Spec. Cl 2705, 2708 and
2709 MORTH (Fifth Rev) and as directed by
Engineer all complete.
Bill No : 1A - CONSTRUCTION OF RE WALL AT APPROACHES
Sl. No. Description Unit Quantity Rate Amount

CONSTRUCTION OF REINFORCED EARTH RETAINING STRUCTURES


Construction of earthwork in layers, assembling and
erection of reinforcing elements and placing of facia
6.29 panels and all associated components as per Additional
Technical Specification A-16, approved design and
drawing of specialised firm

a) Excavation for RE wall cum 764.00

b) Providing and laying M-35 grade RCC facia panels


6.30 including reinforcement and reinforcing elements (with sqm 4,806.00
Geogrids) with all fixtures and accesories complete

c) Providing levelling pad in cement concrete M-20


grade below facia panels, including earthwork in
excavation, backfilling and profiling of fore slope
6.31 cum 170.00
complete as per approved design, drawing and Technical
Specifications Sections 300, 1500, 1700 and
2100.MORTH (Fifth Rev)

d) Providing Filter Media Behind Reinforced Earth Panel


with well packed material to specified thickness with
smaller size towards the soil and bigger size towards the
6.32 cum 2,884.00
wall complete with all leads and lifts as per approved
design, drawings and Technical Specifications Clauses
305 and 2504.MORTH (Fifth Rev)

e) Providing, Filling, grading and compaction with


6.33 selected soil meeting approved design parameters in cum 24,030.00
layers in soil reinforced zone complete.

f) Providing and laying in position RCC Crash Barrier with


Friction Slab complete as per the approveddrawing and
6.34 Lm 1,060.00
Technical Specifications Clause 809 and Sections 1000
and 1600.MORTH (Fifth Rev)
FLY OVER
SECTION C-C

CONSULTANT: CLIENT : PROJECT :


"Consultancy Services for Preparation of Feasibility-Cum-Preliminary Design
HORIZONTAL SCALE 1:2000
LRP CONSULTANTS CONSORTIUM PVT.LTD. NATIONAL HIGHWAYS for 4/6-laning of Selected Stretches of NH to be executed as BOT (Toll) Project
GENERAL ARRANGEMENT Revision: R0
R-606,New Rajendra Nagar, AUTHORITY OF INDIA on DBFO Pattern under NHDP Phase III" DRAWING OF FLYOVER
New Delhi - 110 060. Group "C" Solapur (Km 232/6 of NH-09) to Bijapur of NH - 13
G-5 & 6, Sector 10, Dwaraka, AT CH:7+550
Ph No.: 011 - 65024482
VERTICAL SCALE 1:200 New Delhi. - 110 075 Package No: NHAI/DBFO II/DPR/11
DATUM (M)

SCHEMATIC
SCHEMATIC
SCHEMATIC
OGL 20m LEFT

CHAINAGE(m)
P.ROW

OGL 20m RIGHT

SUPERELEVATION (%)
VERTICAL ALIGNMENT
EXISTING ROAD LEVEL
452
454
456
458
460
462
464
466
468
470
472
474
476
478

PROPOSED ROAD LEVEL

HORIZONTAL ALIGNMENT
SOLAPUR

P.ROW
7+000 465.492 464.753 465.713
7+000

Ref. Dwg.No.
7+010 465.394 464.718 465.548

LRPCC/NHAI/HW/MISC/
Median Open @ 7+000
7+020 465.571 464.677 465.384

TS-01
7+030 465.747 464.635 465.220
7+040 465.893 464.608 465.056

P.ROW
7+050 466.017 464.599 464.892
7+060 466.119 464.679 464.727
7+070 466.321 464.818 464.563
7+080 466.521 464.611 464.399
P.ROW

7+090 466.719 464.359 464.235

VERTICAL SCALE 1:200


7+100
7+100 466.917 464.746 464.071

HORIZONTAL SCALE 1:2000


7+110 466.967 465.208 463.907
7+120 467.016 465.667 463.742
7+130 467.063 465.990 463.578
7+140 467.110 466.205 463.414
P.ROW

7+150 467.192 466.360 463.250


7+160 467.203 466.483 463.086
7+170 467.194 466.605 462.922
7+180 467.179 466.489 462.757
P.ROW

CONSULTANT:
7+190 467.158 466.015 462.593
7+200
7+200 467.129 465.486 462.429
7+204
7+210 467.173 465.151 462.267

New Delhi - 110 060.


7+220 467.217 465.033 462.121

Ph No.: 011 - 65024482


7+230 467.260 465.042 461.990

R-606,New Rajendra Nagar,


7+240 467.047 464.773 461.877
P.ROW

7+250 466.584 464.467 461.780


7+260 466.121 464.160 461.699
7+270 465.658 463.851 461.635
7+280 465.296 463.540 461.588
P.ROW

7+290 464.943 463.183 461.557 7+300


7+300 464.693 462.829 461.543
7+310 464.531 462.616 461.545

LRP CONSULTANTS CONSORTIUM PVT.LTD.


7+320 464.097 462.402 461.564
Ch.=7329.476
7+330 463.650 462.174 461.600 L=460.303

K=60.361
Lv=250.000m
7+340 463.202 461.948 461.652
P.ROW

SOLAPUR BYPASS

7+350 462.755 461.750 461.721

CLIENT :
7+360 462.307 461.480 461.806
7+370 461.876 461.195 461.907
7+380 461.443 460.908 462.026
P.ROW

7+390 460.972 460.614 462.161 7+400


7+400 460.707 460.385 462.312 Start of Service Road
7+410 460.536 460.172 462.480 @ Ch.7+408 (Both Side)
7+420 460.276 459.956 462.665
7+430 459.992 459.739 462.866

New Delhi. - 110 075


7+440 459.530 459.520 463.084
P.ROW

G=2.5

7+450 459.068 459.293 463.318


7+454
00%

G-5 & 6, Sector 10, Dwaraka,


7+460 458.797 459.030 463.566

AUTHORITY OF INDIA
NATIONAL HIGHWAYS
7+470 458.613 458.794 463.816
7+480 458.431 458.551 464.066

L=52m
P.ROW

G=2.500%
7+490 458.252 458.300 464.316 7+500
7+500 458.083 458.173 464.566
7+506
7+510 457.982 458.089 464.813

PROJECT :
7+520 457.905 458.005 465.026
7+530 457.791 457.920 465.197
7+540 457.586 457.718 465.326
P.ROW

Ch.=7566.016
7+550 457.381 457.508 465.413 L=466.217
KM-362

3
KM62
7+560 457.181 457.314 465.459 Flyover
K=-24.000

7+570 456.968 457.221 465.463


Lv=120.000m

CH:7+568
7+580 456.686 457.020 465.426
P.ROW

7+590 456.419 456.672 465.347 7+600


7+600 456.164 456.260 465.226

(PHASE-III)
7+610 456.121 456.324 465.064
7+620 456.145 456.414 464.860
7+626
7+630 456.173 456.493 464.617
7+640 456.202 456.572 464.367
P.ROW

Prop. FLYOVER @ 7+568

7+650 456.214 456.639 464.117


7+660 456.171 456.782 463.867
102.000) SECTION OF NH-13 TO BE EXECUTED AS BOT (TOLL) ON
7+670 456.126 456.886 463.617
7+680 456.083 456.989 463.367
DESIGN, BUILD, FINANCE & OPERATION (DBFO) PATTERN UNDER NHDP
REPORT FOR 4/6 LANING FROM SOLAPUR TO BIJAPUR / (Km 0.000 - Km
CONSULTANCY SERVICES FOR FEASIBILITY CUM PRELIMINARY DESIGN
P.ROW

7+690 456.023 457.212 463.117 7+700


7+700 7+701 455.905 457.098 462.867
EC 7+701
7+710 455.973 456.919 462.617
7+720 455.991 456.741 462.367
7+730 455.978 456.616 462.117
7+740 455.965 456.589 461.867
P.ROW

7+750 455.953 456.596 461.617


7+760 455.946 456.625 461.367
7+770 455.935 456.654 461.117
7+780 455.909 456.683 460.867
FROM KM 7+000 TO KM 8+000
P.ROW

7+790 455.903 456.711 460.617


& L- SECTION

7+800
G=-2.5

7+800 455.899 456.713 460.367


00%

7+810 455.818 456.653 460.117


PROPOSED PLAN
L=376m
G=-2.500%

7+820 455.708 456.592 459.867


7+830 455.598 456.520 459.617
7+840 455.489 456.436 459.367
P.ROW

7+850 455.112 456.227 459.117


7+860 454.344 455.128 458.867
7+870 453.536 454.086 458.617
NGRJ

7+880 453.293 453.125 458.367


Minor Bridge
P.ROW

7+890 454.101 454.552 458.117


7+890
7+900
N
7+900 454.733 455.004 457.867
7+910 454.726 454.873 457.617
7+920 454.486 454.753 457.367
7+930 454.310 454.588 457.117
7+940 454.161 454.382 456.867
P.ROW

7+950 454.032 454.176 456.617


LRP/NH-13/R & H/PP/8

7+960 453.923 453.970 456.367


7+970 453.914 453.800 456.117
7+980 453.852 453.629 455.867
P.ROW

7+990 453.777 453.461 455.617 8+000


8+000 8+002 453.686 453.447 455.367 End of Service RoadSide)