Earlier Single Lane Road Assumed Actual

Pavement Width 3.75 3.75


Shoulder 0.9 No shoulder
Pavement Composition: The composition assumed for earlier single lane road is Assumed Actual
Bituminous 50 25 mm Thick Only
Granular 300 125 mm Thick Only
Thus SN 2.02 Calculate accordingly
The Distress on Existing single lane pavement taken in the year 2014 when construction started Assumed Actual

Roughness 3.5 m/km


As per DPR existing
road condition was
Cracking 5 found in very poor
condition and hence all
Raveling 10 these factors on more
downside can be
considered.
Rutting 4 mm

Earlier single lane road Assumed Actual


Rise Fall 30m/ Km ok
Average Horizontal Curvature 150 deg/Km ok
Speed Limit 45 Km/Hr 25 Km/hr
Altitude 0

Drain Type No Change in drainage effect No Drain was there