Shoulder 0.9 No shoulder Pavement Composition: The composition assumed for earlier single lane road is Assumed Actual Bituminous 50 25 mm Thick Only Granular 300 125 mm Thick Only Thus SN 2.02 Calculate accordingly The Distress on Existing single lane pavement taken in the year 2014 when construction started Assumed Actual
Roughness 3.5 m/km
As per DPR existing road condition was Cracking 5 found in very poor condition and hence all Raveling 10 these factors on more downside can be considered. Rutting 4 mm
Earlier single lane road Assumed Actual
Rise Fall 30m/ Km ok Average Horizontal Curvature 150 deg/Km ok Speed Limit 45 Km/Hr 25 Km/hr Altitude 0
Drain Type No Change in drainage effect No Drain was there