Professional Documents
Culture Documents
Payment Instruction
jcbZ:uXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZsrXZlXZ accredited payment partner before the due date.
cazSXSRcbcP
58M8KnC:PqZ
3S3byKCtg4X
0428125118 � 77,786.80
Zs:Z3RItfGR
ucSZrf8PxQP BfZKEqJbwYJduFEwqFUKBwYJUw Subject to CWT and/or FWV deduction if submitted with BIR Form 2307 and/or
Payment made after 14 Apr 2023 will be reflected BIR Form 2306. Please refer to Addtl Bill Information for more details.
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005
16210
Bill Reference No.: 23043160341 Local Application No.: 788061385 Billing Period: 15 Mar 2023 to 14 Apr 2023 Print Seq. 78264 Page 2 of 2
107FA003624 87428 94177 1 6749 kWh Previous Service ID Number (SIN) : 722130002
107FA003624 0.000 29.407 1 29.407 kW Subject to CWT deduction amounting to 1,383.83, and FWV deduction
amounting to 3,384.39 if with submitted BIR Forms 2307 and 2306
Rate Components Base Price Amount respectively
Your rate this month (price per kWh) is computed as Total Energy Amount
Generation 64.72% 49,466.80 divided by the Actual Consumption (in kWh)
Generation Charge (PhP/kWh) 6749 kWh 7.3295 49,466.80
Additional Account Information
Transmission 10.29% 7,866.08 Payments or credits in excess of your previous billing were either
Transmission Charge(PhP/kW/mo) 29.407 kW 267.4901 7,866.08 applied to your current charges or shall be applied to your future
bills.
System Loss 5.57% 4,255.92
System Loss Charge (PhP/kWh) 6749 kWh 0.6306 4,255.92
Distribution (Meralco) 6.04% 4,618.43
DISTRIBUTION CHARGE
Distribution Demand Charge 29.407 kW 232.2000 6,828.31
Distribution Energy Charge 6749 kWh 0.1339 903.69
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 354.7800 354.78
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 363.7300 363.73
Dist True-Up 4 (PhP/kWh) 6749 kWh -0.5678 -3,832.08
Subsidies 1.16% 885.46
Lifeline Rate Subsidy(PhP/kWh) 6749 kWh 0.1311 884.79
Senior Citizen Subsidy 6749 kWh 0.0001 0.67
Government Taxes 10.25% 7,832.82
Current RPT (PhP/kWh) 6749 kWh 0.0061 41.17
Local Franchise Tax 67133.86 0.8250% 553.85
VALUE ADDED TAX
Generation Charge 49466.80 10.4500% 5,169.28
Transmission Charge 7866.08 11.2900% 888.08
System Loss Charge 4255.92 10.5400% 448.57
Distribution Charge 4618.43 12.0000% 554.21
Subsidies and Others 1480.48 12.0000% 177.66
Universal Charges 1.97% 1,503.68
Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5389
(Office hours, Mon-Fri except holidays)