You are on page 1of 2

ADELA DOLLENTE TAGAYTAY EXTENSION OFFICE

9030 @ LUMAMPONG HALAYHAY BGY GEN. EMILIO AGUINALDO


LUMAMPONG HALAYHAY TAGAYTAY CITY
INDANG 4120 CAVITE TIN 000-101-528-000-VAT

20M FR OF P# CA1-6 Billing Statement No.: 4111104970549


Meter No.: 33AYN38681
Route Seq.: 4110 75 0001 Print Seq.: * Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 1226842515 03 Nov 2021
23 Sep 2021 to 22 Oct 2021 23 Oct 2021
Date of Meter Reading Electric Meter Number
22 Oct 2021 33AYN38681 Please Pay
Date of Next Meter Reading Current Reading
22 Nov 2021
Customer Type -
2,163
Previous Reading
� 1,460. 70

Residential 2,004
=
Actual Consumption Bill Computation Summary
Your rate this month 159 kWh Remaining Balance from previous bill 0.00
� 9.19 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 1,460.70
Please see the back page of your bill for more details about your Generation 804.58
meter reading and consumption. Transmission 112.65
System Loss 61.91
Distribution (Meralco) 271.56
Subsidies 11.74
Your monthly consumption 28.0ºC Government Taxes
Universal Charges
151.00
31.63
Ave. temp this month 1.0 FiT-All (Renewable) 15.63
kWh deg lower than prev.

Total Amount Due � 1,460.70

kWh 114 121 104 152 134 137 145 145 161 159 - -

105 119 - - - 490 178 134 138 147 157 107

Your consumption explained Your typical consumption


This bill is 1% lower (-2kWh) vs 136 kWh 5.3 kWh � 48.7
previous billing period
Ave. monthly Ave. daily Ave. daily
This bill is 8% higher (+12kWh) vs consumption consumption cost this bill
same period last year (last 12 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
159 kWh 0.1132 tCO * 2 5 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZ:uXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZsrXZlXZ accredited payment partner before the due date.
cazSXSRcbcP
mX9IAD3;b4Z
SCcRsKC0g4X
1226842515 � 1,460.70
Zs:ZFZHFGER
ucSZ;FHTv1P Bfw:eUJbwIZdwDeu:fVuBwYZUw
Payment made after 23 Oct 2021 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 21105082095 Local Application No.: 654332348 Billing Period: 23 Sep 2021 to 22 Oct 2021 Print Seq. * Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
23 Aug-22 Sep 2021 29 Sep 2021 Meralco Online � 1,474.22 Environmental Fund 0.00
23 Jul-22 Aug 2021 29 Aug 2021 Meralco Online � 1,314.83 NPC Stranded Contract Costs 0.00
23 Jun-22 Jul 2021 01 Aug 2021 Meralco Online � 1,300.85 NPC Stranded Debts 159 kWh 0.0428 6.81
23 May-22 Jun 2021 30 Jun 2021 Meralco Online � 1,203.90 DU Stranded Contract Costs 0.00
23 Apr-22 May 2021 30 May 2021 Meralco Online Equalization Taxes & Royalties 0.00
� 1,161.72
23 Mar-22 Apr 2021 04 May 2021 Meralco Online � 1,286.41 FiT-All (Renewable) 1.07% 15.63

What remains unpaid FiT-All (Renewable)


Energy Bill Amount
159 kWh 0.0983 15.63

No unpaid bill, thank you! Base VAT


VAT Sales 1,269.81 143.63
VAT Zero Rated 0.00
How your bill was computed Non-VAT
Total Energy Amount
47.26
1,460.70
Service ID Number: 409851010101
Contract Holder: DOLLENTE, ADELA Charges for this billing period � 1,460.70
Service Address: 9030 @ LUMAMPONG HALAYHAY LUMAMPONG
HALAYHAY LUMAMPONG HALAYHAY I Additional Bill Information
Voltage Level Class : Secondary
Metering Information
Previous Service ID Number (SIN) : 117678901
Previous Current
Meter Number Reading Reading Multi Registered Your rate this month (price per kWh) is computed as Total Energy Amount
divided by the Actual Consumption (in kWh)
33AYN38681 2004 2163 1 159 kWh Note: The average temperature for the month represents the reading from
the PAG-ASA weather station in Quezon City, Metro Manila.
Rate Components Base Price Amount
Generation 55.08% 804.58
Generation Charge (PhP/kWh) 159 kWh 5.0435 801.92
ACRM Recovery (PhP/kWh) 159 kWh 0.0191 3.04
ICERA Refund (PhP/kWh) 159 kWh -0.0024 -0.38
Transmission 7.71% 112.65
Transmission Charge(PhP/kWh) 159 kWh 0.7085 112.65
System Loss 4.24% 61.91
System Loss Charge (PhP/kWh) 159 kWh 0.3894 61.91
Distribution (Meralco) 18.59% 271.56
Distribution Charge (PhP/kWh) 159 kWh 1.0012 159.19
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 159 kWh 0.3377 53.69
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.7300 16.73
Supply Charge per kWh 159 kWh 0.5085 80.85
Dist True-Up (Php/kWh) 159 kWh -0.2761 -43.90
Subsidies 0.80% 11.74
Lifeline Rate Subsidy (PhP/kWh 159 kWh 0.0737 11.72
Senior Citizen Subsidy 159 kWh 0.0001 0.02
Government Taxes 10.34% 151.00
Current RPT (PhP/kWh) 159 kWh 0.0066 1.05
Local Franchise Tax 1263.49 0.5000% 6.32
VALUE ADDED TAX
Generation Charge 801.92 11.2000% 89.82
ACRM Recovery 3.04 7.8000% 0.24
ICERA Refund -0.38 17.3300% -0.07
Transmission Charge 112.65 10.5500% 11.88
System Loss Charge 61.91 11.1200% 6.88
Distribution Charge 271.56 12.0000% 32.59
Subsidies and Others 19.11 12.0000% 2.29
Universal Charges 2.17% 31.63
Missionary Elec for NPC-SPUG 159 kWh 0.1544 24.55
Missionary Elec for REDCI 159 kWh 0.0017 0.27

Tips for hassle free payment Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bills due date and remit the
Bring your electric bill every time you pay payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
these accredited ADA partners.
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of Asia United Bank Philippine National Bank
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Banco de Oro (BDO) Security Bank
Bank of the Philippine Islands (BPI) Union Bank of the Philippines
Pay on or before due date Citibank United Coconut Planters Bank
Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5389
(Office hours, Mon-Fri except holidays)

You might also like