You are on page 1of 2

ACHANZAR EMALINE EBIA STA.

MARIA BUSINESS CENTER


734 DOOR 1 BLOCK 4 ST PROVINCIAL
GUMAOC EAST SANTA MARIA
SAN JOSE DEL MONTE CITY 3023 BULACAN TIN 000-101-528-000-VAT

INFRONT OF PIA STORE Billing Statement No.: 2143035393607


Meter No.: 717BAG024382
Route Seq.: 2140 01 0001 Print Seq.: 37421 Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 1891031698 03 Apr 2023
22 Feb 2023 to 22 Mar 2023 22 Mar 2023
Date of Meter Reading Electric Meter Number
22 Mar 2023 717BAG024382 Please Pay
Date of Next Meter Reading Current Reading
22 Apr 2023
Customer Type -
1,241
Previous Reading
� 6. 49

Residential 1,234
=
Actual Consumption Bill Computation Summary
Your rate this month 7 kWh Remaining Balance from previous bill 0.00
� 0.93 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 6.49
Please see the back page of your bill for more details about your Generation 51.65
meter reading and consumption. Transmission 5.96
System Loss 4.52
Distribution (Meralco) 28.02
Subsidies -85.15
Your monthly consumption 26.8ºC Government Taxes
Universal Charges
-0.07
1.56
Ave. temp this month 0.5 FiT-All (Renewable) 0.00
kWh deg higher than prev.

Total Amount Due � 6.49

kWh 6 7 7 - - - - - - - - -

33 43 43 35 25 19 21 14 7 7 8 5

Your consumption explained Your typical consumption


Your consumption (in kWh) is the 13 kWh 0.24 kWh � 0.22
same vs previous billing period
Ave. monthly Ave. daily Ave. daily
This bill is 84% lower (-36kWh) vs consumption consumption cost this bill
same period last year (last 12 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
7 kWh 0.0050 tCO * 2 0 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZ:uXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZsrXZlXZ accredited payment partner before the due date.
cazSXSRcbcP
yI3pDl72zvZ
SSCRjAC8frX
1891031698 � 6.49
Zs:ZC2I0fER
ucSZ:n8TnQP Bfw:fUZbeYFYwK:w:eVZbeYJUw
Payment made after 22 Mar 2023 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 23035414251 Local Application No.: 783115664 Billing Period: 22 Feb 2023 to 22 Mar 2023 Print Seq. 37421 Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
23 Jan-21 Feb 2023 23 Feb 2023 Meralco Online � 6.65 Equalization Taxes & Royalties 0.00
23 Dec-22 Jan 2023 25 Jan 2023 Meralco Online � 6.59
FiT-All (Renewable) 0.00% 0.00
23 Nov-22 Dec 2022 30 Dec 2022 Bayad Partner � 6.52
23 Oct-22 Nov 2022 24 Nov 2022 Bayad Partner � 7.40 FiT-All (Renewable) 0.00
23 Sep-22 Oct 2022 04 Nov 2022 Bayad Partner � 7.20
23 Aug-22 Sep 2022 18 Oct 2022 Bayad Partner � 7.60
Energy Bill Amount
Base VAT
What remains unpaid VAT Sales
VAT Zero Rated
Non-VAT
5.07
0.00
1.56
-0.14

No unpaid bill, thank you!


Total Energy Amount 6.49
How your bill was computed Charges for this billing period � 6.49
Service ID Number: 462041280101
Contract Holder: ACHANZAR EMALINE EBIA
Additional Bill Information
Service Address: 734 BLOCK 4 ST DOOR 1, GUMAOC EAST, Voltage Level Class : Secondary

GUMAOC EAST, SAN JOSE DEL MON Your rate this month (price per kWh) is computed as Total Energy Amount
divided by the Actual Consumption (in kWh)
Note: The average temperature for the month represents the reading from
Metering Information the PAG-ASA weather station in Quezon City, Metro Manila.
Previous Current
Meter Number Reading Reading Multi Registered
717BAG024382 1234 1241 1 7 kWh
Rate Components Base Price Amount
Generation 795.84% 51.65
Generation Charge (PhP/kWh) 7 kWh 7.3790 51.65
Power Act Reduction 0.00
Transmission 91.83% 5.96
Transmission Charge(PhP/kWh) 7 kWh 0.8514 5.96
System Loss 69.65% 4.52
System Loss Charge (PhP/kWh) 7 kWh 0.6460 4.52
Distribution (Meralco) 431.74% 28.02
Distribution Charge (PhP/kWh) 7 kWh 0.9803 6.86
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 7 kWh 0.3357 2.35
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 7 kWh 0.4986 3.49
Dist True-Up 4 (PhP/kWh) 7 kWh -0.8656 -6.06
Subsidies -1312.02% -85.15
Lifeline Discount 85.15 -100.00% -85.15
Government Taxes -1.08% -0.07
Current RPT (PhP/kWh) 7 kWh 0.0059 0.04
Local Franchise Tax 5.04 0.5000% 0.03
VALUE ADDED TAX
Generation Charge 51.65 10.7900% 5.57
Power Act Reduction 0.00
Transmission Charge 5.96 10.9600% 0.65
System Loss Charge 4.52 10.8100% 0.49
Distribution Charge 28.02 12.0000% 3.36
Subsidies and Others -85.08 12.0000% -10.21
Universal Charges 24.04% 1.56
Missionary Elec for NPC-SPUG 7 kWh 0.1783 1.25
Missionary Elec for REDCI 7 kWh 0.0017 0.01
Environmental Fund 0.00
NPC Stranded Contract Costs 0.00
NPC Stranded Debts 7 kWh 0.0428 0.30
DU Stranded Contract Costs 0.00

Tips for hassle free payment Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bills due date and remit the
Bring your electric bill every time you pay payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
these accredited ADA partners.
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Asia United Bank Philippine National Bank Robinsons Bank
Banco de Oro (BDO) Union Bank of the Philippines Citibank
Pay on or before due date Bank of the Philippine Islands (BPI) United Coconut Planters Bank Security Bank

Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5389
(Office hours, Mon-Fri except holidays)

You might also like