You are on page 1of 2

DELA CRUZ RICARDO MANUEL BALAGTAS BUSINESS CENTER

LOT 19 BLOCK 28 BLK MACARTHUR


AINA HOMES SAN FRANCISCO BALAGTAS
BULACAN BULACAN TIN 000-101-528-000-VAT
Billing Statement No.: 2133042854376
Meter No.: 120BAC009486
Route Seq.: 2130 08 0001 Print Seq.: * Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 2001634189 26 Apr 2023
15 Mar 2023 to 14 Apr 2023 14 Apr 2023
Date of Meter Reading Electric Meter Number
14 Apr 2023 120BAC009486 Please Pay
Date of Next Meter Reading Current Reading
14 May 2023
Customer Type -
3,444
Previous Reading
� 492. 54

Residential 3,377
=
Actual Consumption Bill Computation Summary
Your rate this month 67 kWh Remaining Balance from previous bill 0.00
� 7.45 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 492.54
Please see the back page of your bill for more details about your Generation 491.08
meter reading and consumption. Transmission 54.83
System Loss 42.25
Distribution (Meralco) 84.87
Subsidies -235.56
Your monthly consumption 26.9ºC Government Taxes
Universal Charges
47.03
14.93
Ave. temp this month 0.1 FiT-All (Renewable) 0.00
kWh deg higher than prev. Applied Credits -6.89

Total Amount Due � 492.54

kWh 94 29 25 67 - - - - - - - -

86 87 72 341 359 95 98 22 21 20 28 29

Your consumption explained Your typical consumption


This bill is more than 100% higher 74 kWh 2.16 kWh � 16.1
(+42kWh) vs previous billing period
Ave. monthly Ave. daily Ave. daily
This bill is 80% lower (-274kWh) vs consumption consumption cost this bill
same period last year (last 12 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
67 kWh 0.0477 tCO * 2 2 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZ:uXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZsrXZlXZ accredited payment partner before the due date.
cazSXSRcbcP
lsoLKDC;zqX
CScRjABHg6X
2001634189 � 492.54
Zs:Z3XI0fER
ucSZOlHUfQP Bfu:eqZVeYFveK:ZJfUKBeIJUw
Payment made after 14 Apr 2023 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 23043400613 Local Application No.: 788307973 Billing Period: 15 Mar 2023 to 14 Apr 2023 Print Seq. * Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
15 Mar-14 Apr 2023 14 Apr 2023 Meralco Headquarters � 6.89 Equalization Taxes & Royalties 0.00
14 Feb-14 Mar 2023 24 Mar 2023 Bayad Partner � 143.11
FiT-All (Renewable) 0.00% 0.00
14 Feb-14 Mar 2023 15 Mar 2023 Meralco Headquarters � 10.34
15 Jan-13 Feb 2023 14 Feb 2023 Meralco Headquarters � 168.41 FiT-All (Renewable) 0.00
15 Dec-14 Jan 2023 02 Feb 2023 Bayad Partner � 821.25
15 Dec-14 Jan 2023 15 Jan 2023 Meralco Headquarters � 1.80
Energy Bill Amount
Base VAT
What remains unpaid VAT Sales
VAT Zero Rated
Non-VAT
440.29
0.00
14.93
44.21

No unpaid bill, thank you!


Total Energy Amount 499.43
Applied Credits -6.89
How your bill was computed Overpayment -6.89
Service ID Number: 470322010101
Contract Holder: DELA CRUZ RICARDO MANUEL Charges for this billing period � 492.54
Service Address: LOT 19 BLOCK 28 BLK , AINA HOMES, SAN Additional Bill Information
FRANCISCO, BULACAN , BULACA
Voltage Level Class : Secondary
Metering Information Breakdown of Applied Credits:
Previous Current Base VAT TOTAL
Meter Number Reading Reading Multi Registered Overpayment 6.15 0.74 6.89
VAT details after application of credits:
120BAC009486 3377 3444 1 67 kWh Base VAT
VAT Sales 434.34 43.47
Rate Components Base Price Amount VAT Zero Rated
VAT Exempt
0.00
14.73
Generation 98.33% 491.08 TOTAL BILL AMOUNT 492.54
Your rate this month (price per kWh) is computed as Total Energy Amount
Generation Charge (PhP/kWh) 67 kWh 7.3295 491.08 divided by the Actual Consumption (in kWh)
Power Act Reduction 0.00 Note: The average temperature for the month represents the reading from
the PAG-ASA weather station in Quezon City, Metro Manila.
Transmission 10.98% 54.83
Transmission Charge(PhP/kWh) 67 kWh 0.8184 54.83 Additional Account Information
System Loss 8.46% 42.25 Payments or credits in excess of your previous billing were either
applied to your current charges or shall be applied to your future
System Loss Charge (PhP/kWh) 67 kWh 0.6306 42.25 bills.

Distribution (Meralco) 16.99% 84.87


Distribution Charge (PhP/kWh) 67 kWh 0.9803 65.68
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 67 kWh 0.3351 22.45
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.3800 16.38
Supply Charge per kWh 67 kWh 0.4979 33.36
Dist True-Up 4 (PhP/kWh) 67 kWh -0.8656 -58.00
Subsidies -47.17% -235.56
Lifeline Discount 673.03 -35.00% -235.56
Government Taxes 9.42% 47.03
Current RPT (PhP/kWh) 67 kWh 0.0061 0.41
Local Franchise Tax 437.88 0.5500% 2.41
VALUE ADDED TAX
Generation Charge 491.08 10.4500% 51.32
Power Act Reduction 0.00
Transmission Charge 54.83 11.2900% 6.19
System Loss Charge 42.25 10.5400% 4.45
Distribution Charge 84.87 12.0000% 10.18
Subsidies and Others -232.74 12.0000% -27.93
Universal Charges 2.99% 14.93
Missionary Elec for NPC-SPUG 67 kWh 0.1783 11.95
Missionary Elec for REDCI 67 kWh 0.0017 0.11
Environmental Fund 0.00
NPC Stranded Contract Costs 0.00
NPC Stranded Debts 67 kWh 0.0428 2.87
DU Stranded Contract Costs 0.00

Tips for hassle free payment Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bills due date and remit the
Bring your electric bill every time you pay payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
these accredited ADA partners.
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Asia United Bank Philippine National Bank Robinsons Bank
Banco de Oro (BDO) Union Bank of the Philippines Citibank
Pay on or before due date Bank of the Philippine Islands (BPI) United Coconut Planters Bank Security Bank

Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5389
(Office hours, Mon-Fri except holidays)

You might also like