You are on page 1of 2

SARREAL JOSE PHILLIP MONROE ALABANG BUSINESS CENTER

411 MARIMBA BUILDING 8 BLDG PRIME ST.


RHAPSODY RESIDENCES BULI MUNTINLUPA
MUNTINLUPA METRO MANILA TIN 000-101-528-000-VAT
Billing Statement No.: 4232046977437
Meter No.: 514BAL001066
Route Seq.: 4230 20 0007 Print Seq.: 290093 Page 1 of 2

Your electric bill Customer Account Number (CAN) Due Date


Billing Period Bill Date 1969710262 09 May 2022
29 Mar 2022 to 28 Apr 2022 28 Apr 2022
Date of Meter Reading Electric Meter Number
28 Apr 2022 514BAL001066 Please Pay
Date of Next Meter Reading Current Reading
28 May 2022
Customer Type -
10,935
Previous Reading
� 3,334. 11

Residential 10,628
=
Actual Consumption Bill Computation Summary
Your rate this month 307 kWh Remaining Balance from previous bill 0.00
� 10.86 per kWh (see other bills due for payment under What Remains Unpaid;
See formula in Addtl Bill Information does not include bills under review and installment)
Charges for this billing period 3,334.11
Please see the back page of your bill for more details about your Generation 1,802.19
meter reading and consumption. Transmission 255.76
System Loss 165.53
Distribution (Meralco) 634.28
Subsidies 28.80
Your monthly consumption 28.9ºC Government Taxes
Universal Charges
356.31
61.06
Ave. temp this month 1.6 FiT-All (Renewable) 30.18
kWh deg higher than prev.

Total Amount Due � 3,334.11

kWh 346 421 335 307 - - - - - - - -

285 250 272 345 520 342 322 377 174 256 454 366

Your consumption explained Your typical consumption


This bill is 8% lower (-28kWh) vs 352 kWh 9.90 kWh � 108
previous billing period
Ave. monthly Ave. daily Ave. daily
This bill is 11% lower (-38kWh) vs consumption consumption cost this bill
same period last year (last 12 this bill period
months) period
Environmental Impact
Be energy efficient. Save and help take care of our environment
307 kWh 0.2186 tCO * 2 10 tree/s**
Electricity Used Equiv. GHG Emissions To Offset Emissions
*Using DOE’s 2015-2017 National Emission Grid Factor of 0.0007122 tCO /kWh 2
Please be informed that MERALCO may conduct a routine maintenance/inspection of our
**Per Arbor Day Foundation, 1 mature tree can absorb 48 pounds (0.0218 tonnes) of CO /year 2 customer metering facilities within your area this quarter.

Payment Instruction
jcbZ:uXjcbZ Please pay at any Meralco Business Center or through any Customer Account No. (CAN) Please Pay
ZlXZsrXZlXZ accredited payment partner before the due date.
cazSXSRcbcP
KnCI9FG3dvZ
CSCbkIF2c4X
1969710262 � 3,334.11
Zs:Z62I2FGR
ucSZNd81fQP Bfw:eUZcEIJYKJEZKEUJcEIFUw
Payment made after 28 Apr 2022 will be reflected
QR code contains on your next bill.
your CAN. BIR Permit No.: 0305-116-00036-BA/AR dtd: March 21, 2005

16211
Bill Reference No.: 22046976462 Local Application No.: 700892884 Billing Period: 29 Mar 2022 to 28 Apr 2022 Print Seq. 290093 Page 2 of 2

What you've paid


Shows recent payments already applied to this service excluding any overpayment
Continued
Billing Period Posting Date Payment Channels Amount Paid Rate Components Base Price Amount
28 Feb-28 Mar 2022 11 Apr 2022 Bayad Partner � 3,455.89 NPC Stranded Debts 307 kWh 0.0428 13.14
29 Jan-27 Feb 2022 11 Mar 2022 Bayad Partner � 4,557.96 DU Stranded Contract Costs 0.00
29 Dec-28 Jan 2022 11 Feb 2022 Bayad Partner � 3,578.19 Equalization Taxes & Royalties 0.00
29 Nov-28 Dec 2021 07 Jan 2022 Bayad Partner � 3,821.34 FiT-All (Renewable) 0.91% 30.18
29 Oct-28 Nov 2021 04 Dec 2021 Bayad Partner � 4,858.22
29 Sep-28 Oct 2021 04 Dec 2021 Bayad Partner � 0.08 FiT-All (Renewable) 307 kWh 0.0983 30.18
Energy Bill Amount
What remains unpaid VAT Sales
Base
2,910.25
VAT
332.62
No unpaid bill, thank you! VAT Zero Rated 0.00
Non-VAT 91.24

How your bill was computed Total Energy Amount 3,334.11


Service ID Number: 454199730103 Charges for this billing period � 3,334.11
Contract Holder: SARREAL JOSE PHILLIP MONROE
Service Address: 411 MARIMBA BUILDING 8 BLDG , RHAPSODY Additional Bill Information
RESIDENCES, BULI, MUNTINLU Voltage Level Class : Secondary
Your rate this month (price per kWh) is computed as Total Energy Amount
Metering Information divided by the Actual Consumption (in kWh)
Previous Current Note: The average temperature for the month represents the reading from
Meter Number Reading Reading Multi Registered the PAG-ASA weather station in Quezon City, Metro Manila.

514BAL001066 10628 10935 1 307 kWh


Rate Components Base Price Amount
Generation 54.05% 1,802.19
Generation Charge (PhP/kWh) 307 kWh 5.8724 1,802.83
Power Act Reduction 307 kWh -0.0021 -0.64
Transmission 7.67% 255.76
Transmission Charge(PhP/kWh) 307 kWh 0.8331 255.76
System Loss 4.96% 165.53
System Loss Charge (PhP/kWh) 307 kWh 0.5392 165.53
Distribution (Meralco) 19.02% 634.28
Distribution Charge (PhP/kWh) 307 kWh 1.6175 496.57
METERING CHARGE
Fixed Metering Charge (PhP/mo) 1.00 mo 5.0000 5.00
Metering Charge per kWh 307 kWh 0.3377 103.67
SUPPLY CHARGE
Fixed Supply Charge (PhP/mo) 1.00 mo 16.7300 16.73
Supply Charge per kWh 307 kWh 0.5085 156.11
Dist True-Up 1 (PhP/kWh) 307 kWh -0.2761 -84.76
Dist True-Up 2 (PhP/kWh) 307 kWh -0.1923 -59.04
Subsidies 0.86% 28.80
Lifeline Rate Subsidy (PhP/kWh 307 kWh 0.0937 28.77
Senior Citizen Subsidy 307 kWh 0.0001 0.03
Government Taxes 10.69% 356.31
Current RPT (PhP/kWh) 307 kWh 0.0066 2.03
Local Franchise Tax 2888.59 0.7500% 21.66
VALUE ADDED TAX
Generation Charge 1802.83 11.2300% 202.46
Power Act Reduction 0.00
Transmission Charge 255.76 11.3900% 29.13
System Loss Charge 165.53 11.2500% 18.62
Distribution Charge 634.28 12.0000% 76.11
Subsidies and Others 52.49 12.0000% 6.30
Universal Charges 1.83% 61.06
Missionary Elec for NPC-SPUG 307 kWh 0.1544 47.40
Missionary Elec for REDCI 307 kWh 0.0017 0.52
Environmental Fund 0.00
NPC Stranded Contract Costs 0.00

Tips for hassle free payment Automatic Debit Arrangement (ADA)


Authorize your bank to debit the bill amount from your account on the bills due date and remit the
Bring your electric bill every time you pay payment to Meralco. Visit your bank to enroll in this option. Meralco bill payments are accepted through
these accredited ADA partners.
Check payment should be payable to “Meralco” or “Manila Electric Company”. At the back of
check, write your Customer Account Number (CAN), Contact Person Name and Contact Number. Asia United Bank Philippine National Bank Robinsons Bank
Banco de Oro (BDO) Union Bank of the Philippines Citibank
Pay on or before due date Bank of the Philippine Islands (BPI) United Coconut Planters Bank Security Bank

Learn about Meralco’s authorized payment partners, energy savings, and safety. Visit our jcbZM7HWha9IPjcbZ
ZlXZbJLcHrxdPZlXZ All disputes which cannot be settled by the distribution utility to the satisfaction of the customer can be
website or any of our social media channels. ccbSSRuySTvxuaaaP
fvZMG78rncSJLTrfP
bDFRbJmSBL;fzJz58
elevated to the Energy Regulatory Commission (ERC). To contact the ERC, you may get in touch with ERC’s
ey0qDiTrsyBQl69U2
ffjSPySe;1pVwABI0 Consumer Affairs Service (CAS) through:
j6VMSKtrRJgz4YGFP
Sc3bZfeSJN;Qjbj9X
Zs:ZO7vnW5BAxqkR8
ucSZnXQFYT4k6uMi0
www.erc.gov.ph consumer@erc.ph 8687-5577 / 8689-5389
(Office hours, Mon-Fri except holidays)

You might also like