NCR/OBSERVATION LOG (CBPL)

Observation Observation
Obs.No. Issue Location Description Status Closing Remarks
Date Date

1 3-Jan-19 Tower C1 Dismantle honeycombed column Closed 24-Jan-19 Dismantle & Recasted

2 5-Feb-19 Tower B3 NC quality observation TB3, Slab Closed 26-Feb-19 Repaired & Rectified

3 18-Feb-19 Tower C1 Dismantle honeycombed column Closed 08-Mar-19 Dismantle & Recasted

4 19-Feb-19 Tower C1 NC Honeycombing in beam and column TC1 Closed 06-Mar-19 Repaired & Rectified

Tower NC compressive strength found below the required strength


5 6-Mar-19 Closed 09-Apr-19 Core Result Ok
TB1,TB2,TB3,TC1 TB1,TB2,TB3,TC1
6 13-Mar-19 Tower B2 NC Quality inspection report TB2 Basement Closed 24-Mar-19 Repaired & Rectified

7 15-Mar-19 B.Plant NC Quality inspection report Rejected sand Closed 04-Apr-19 Rectified

8 28-Mar-19 Tower B1 NC Dismantle honeycombed shear wall TB1, Basement Closed 13-Apr-19 Dismantle & Recasted

9 28-Mar-19 Tower C1 NCR TC1, Basement Closed 18-Apr-19 Repaired & Rectified

10 29-Mar-19 Tower B3 NC Quality obersvation TB3 ground floor Closed 16-Apr-19 Repaired & Rectified

11 2-Apr-19 Tower C1 NCR Quality obersvation TC1 ground floor Closed 27-Apr-19 Repaired & Rectified

12 16-Apr-19 Tower C1 NCR Dismantle column TC1, 2nd/F Closed 01-May-19 Dismantle & Recasted

13 16-Apr-19 B.Plant NC Quality Observation Report B.Plant Closed 28-Apr-19 Rectified

14 22-Apr-19 NTA NCR Pile head cover with PCC Closed 12-May-19 Rectified

15 22-Apr-19 Quality NCR Shuttering ply third party test Open Open

16 9-May-19 Tower C1 NCR Quality obersvationTC1 ,Basement Closed 23-Jun-19 Repairing Done

17 16-May-19 Tower B3 NC, Quality observation TB2, slab Closed 31-May-19 Repairing Done
NCR/OBSERVATION LOG (CBPL)
Observation Observation
Obs.No. Issue Location Description Status Closing Remarks
Date Date

18 1-Jun-19 Tower C1 NC, Quality observation TC1, Ist/F Closed 18-Jun-19 Repaired & Rectified

19 7-Jun-19 Tower B3 NC, Quality observation AAC Block work, TB3. G/F Closed 09-Jul-19 Repaired & Rectified

20 20-Jun-19 Tower C1 NC, Quality observation TB1, First floor slab Closed 28-Jul-19 Repaired & Rectified

21 25-Jun-19 Tower C1 NC, steel stacking & intermixing of aggregate Closed 05-Jul-19 Rectified

22 26-Jun-19 Tower C1, Tower B2 NC, Block work (TC1, G/F + TB2, G/F) Closed 17-Jul-19 Repaired & Rectified

23 8-Jul-19 Tower C1 NC, AAC Block work, TC1. G/F Closed 12-Aug-19 Repaired & Rectified

24 19-Jul-19 Tower B1 NC Dismantle honeycombing column, TB1 2nd floor Closed 26-Jul-19 Dismantle & Recasted

25 3-Aug-19 Tower TB1,TC1 NC, Concrete cube compressive strength found below required Open Open Core Failed & Carbon firbe
strength TC1, TB1 wraping is proposed

26 9-Aug-19 Tower B2/B3 Quality Walk Closed 05.10.2019

NC, Concrete cube compressive strength found below required


27 16-Aug-19 Tower TB1,TB2,TB3 Open Open Core to extracted
strength TB1, TB2,TB3
Tower B1 & Non Compliance report, (Concrete cube compressive strength
28 24-Aug-19 Open Open Core to extracted
Tower C1 found below required strength) TC1
29 2-Sep-19 Quality Submit Third Party Test Report Closed 18.09.2019 Report Submitted

30 21-Sep-19 Tower B1 Carbon Wraping of Tower B1 2nd floor Open Open


NC, Concrete cube compressive strength found below required
31 22-Oct-19 TOWER D1 LIFT PIT Open Open Core to extracted
strength TD1
NC, Concrete cube compressive strength found below required
32 22-Oct-19 Tower B1 Open Open Core to extracted
strength TB1 5TH FLOOR COLUMN

Total No Observation
NCR/OBSERVATION LOG (CBPL)
Observation Observation
Obs.No. Issue Location Description Status Closing Remarks
Date Date

Total Closed Observations-


Total Open Observartions-
ERVATION LOG (CBPL)
PMC/GPL
Representative
ERVATION LOG (CBPL)
PMC/GPL
Representative

32
ERVATION LOG (CBPL)
PMC/GPL
Representative

25
7