1 3-Jan-19 Tower C1 Dismantle honeycombed column Closed 24-Jan-19 Dismantle & Recasted
2 5-Feb-19 Tower B3 NC quality observation TB3, Slab Closed 26-Feb-19 Repaired & Rectified
3 18-Feb-19 Tower C1 Dismantle honeycombed column Closed 08-Mar-19 Dismantle & Recasted
4 19-Feb-19 Tower C1 NC Honeycombing in beam and column TC1 Closed 06-Mar-19 Repaired & Rectified
7 15-Mar-19 B.Plant NC Quality inspection report Rejected sand Closed 04-Apr-19 Rectified
8 28-Mar-19 Tower B1 NC Dismantle honeycombed shear wall TB1, Basement Closed 13-Apr-19 Dismantle & Recasted
9 28-Mar-19 Tower C1 NCR TC1, Basement Closed 18-Apr-19 Repaired & Rectified
10 29-Mar-19 Tower B3 NC Quality obersvation TB3 ground floor Closed 16-Apr-19 Repaired & Rectified
11 2-Apr-19 Tower C1 NCR Quality obersvation TC1 ground floor Closed 27-Apr-19 Repaired & Rectified
12 16-Apr-19 Tower C1 NCR Dismantle column TC1, 2nd/F Closed 01-May-19 Dismantle & Recasted
14 22-Apr-19 NTA NCR Pile head cover with PCC Closed 12-May-19 Rectified
15 22-Apr-19 Quality NCR Shuttering ply third party test Open Open
16 9-May-19 Tower C1 NCR Quality obersvationTC1 ,Basement Closed 23-Jun-19 Repairing Done
17 16-May-19 Tower B3 NC, Quality observation TB2, slab Closed 31-May-19 Repairing Done
NCR/OBSERVATION LOG (CBPL)
Observation Observation
Obs.No. Issue Location Description Status Closing Remarks
Date Date
18 1-Jun-19 Tower C1 NC, Quality observation TC1, Ist/F Closed 18-Jun-19 Repaired & Rectified
19 7-Jun-19 Tower B3 NC, Quality observation AAC Block work, TB3. G/F Closed 09-Jul-19 Repaired & Rectified
20 20-Jun-19 Tower C1 NC, Quality observation TB1, First floor slab Closed 28-Jul-19 Repaired & Rectified
21 25-Jun-19 Tower C1 NC, steel stacking & intermixing of aggregate Closed 05-Jul-19 Rectified
22 26-Jun-19 Tower C1, Tower B2 NC, Block work (TC1, G/F + TB2, G/F) Closed 17-Jul-19 Repaired & Rectified
23 8-Jul-19 Tower C1 NC, AAC Block work, TC1. G/F Closed 12-Aug-19 Repaired & Rectified
24 19-Jul-19 Tower B1 NC Dismantle honeycombing column, TB1 2nd floor Closed 26-Jul-19 Dismantle & Recasted
25 3-Aug-19 Tower TB1,TC1 NC, Concrete cube compressive strength found below required Open Open Core Failed & Carbon firbe
strength TC1, TB1 wraping is proposed
Total No Observation
NCR/OBSERVATION LOG (CBPL)
Observation Observation
Obs.No. Issue Location Description Status Closing Remarks
Date Date
32
ERVATION LOG (CBPL)
PMC/GPL
Representative
25
7