BACKFILLING AND COMPACTION CHECKLIST

PROJECT TITLE REPORT NO.


JOB NO. DATE
DRAWING NO. LOCATION
CHECKED BY
S/No. ITEMS TO BE CHECKED CONTRACTOR REMARKS
ACC REJ N/A
1 Approved Method Statement and ITP being followed?

2 HSE risks and requirements recognised and documented?

3 Fill material Source is approved?

4 Fill material test reports filed for every 1000m³?

5 Fill material clean and confirms to requirments ?

6 Properly mixed and moisture content maintained before placing?

7 Layer thickness as per specification?

8 Proper compacting equipments are used?

9 Tests are made in sufficient locations as per specification?

9 All perimeters of exisiting structure are properly compacted?

10 Field Density and moisture content test reports filed?

11 Calibration of testing equipments verified?

LEGEND ACC : ACCEPTED REJ : REJECTED N/A : NOT APPLICABLE

COMPLETED BY

COMPANY

SIGNATURE

NAME

DATE