ITP-I-09
1_3 Installation Method of Statement Document review Contractor Procedure R H N/A N/A Method of Statement
1_4 Shop Drawing Document review Contractor Drawing R H N/A N/A Shop Drawing
2 Execution
Material Receipt Inspection to be Project Requirement and
2_1 done on delivery visual inspection Specifications R+I I N/A N/A Material Receiving Report
2_8 GROUNDING SOIL RESISTIVITY TEST 4 Pole Digital —Ground project requirement and I+W T N/A N/A Test Report
resistivty tester specification
EQUIPMENT NO:
DESCRIPTION:
SYSTEM/SUBSYSTEM No:
REPORT No:
TEST EQUIPMENT
REMARKS:
WITNESSED / REVIEWED BY: CONTRACTOR QUALITY CONTROL (NEGEMCO) CONSULTANT (DAR) EMPLOYER (IF REQUIRED)
SIGNATURE:
PRINT NAME:
DATE:
GROUNDING CONTINUITY INSPECTION REPORT DOCUMENT NUMBERING:
TEST EQUIPMENT
Range: Serial Nº
CONTINUITY RESULT
AREA / ITEM / EQUIPMENT
ACCEPTED REJECTED
REMARKS:
WITNESSED /
CONTRACTOR QUALITY CONTROL (NEGEMCO) CONSULTANT (DAR) EMPLOYER APC (IF REQUIRED)
REVIEWED BY:
SIGNATURE:
PRINT NAME:
DATE:
DOCUMENT NUMBERING:
GROUNDING RESISTIVITY TEST REPORT
EQUIPMENT NO:
DESCRIPTION:
SYSTEM/SUBSYSTEM No:
REPORT No:
TEST EQUIPMENT
RESULT
LINE NO. LINE ORIENTATION DEPTH
READING R (Ω) Earth resistivity, ρ (Ω.m)
1 NORTH-SOUTH
6 EAST-WEST
10
11
12
RESULT :
REMARKS:
WITNESSED / REVIEWED BY: CONTRACTOR QUALITY CONTROL (NEGEMCO) ENGINEER (DAR) EMPLOYER (IF REQUIRED)
SIGNATURE:
PRINT NAME:
DATE:
GROUNDING INSTALLATION DOCUMENT NUMBERING:
INSPECTION
EQUIPMENT NO:
REPORT No:
1 Grounding cable installed and routed according to the lastest drawing and specifications
3 Grounding Cables and Electrode are buried the depth as per drawing and Specifications
Distance between each Grounding Electrode and location shall be according to drawings and
5
specifications
Ensure Earth Test Pit is not disturbed any other activities (traffic, passage ways) and it's correctly
6
installed.
7 Underground conduits stub up are properly installed according to drawings and specifications
8 Ensure the installation of ground bus bar is the same as approved drawing
Ensure Structural Steel, Supports, Equipments, Frames, Steel Column, Flexible Ducts, Cable Tray,
10
conduit & Piping Grounding installation
REMARKS:
WITNESSED /
CONTRACTOR (NEGEMCO) ENGINEER (DAR) EMPLOYER (IF REQUIRED)
REVIEWED BY:
SIGNATURE:
PRINT NAME:
DATE: