1.

Foundation Verificati
Plate Load Test on the

2. HDPE Liner 2 mm-In


3.Clean Washed Sand Abov
4.Installation of Ano
By Cathodic Protection Vendo

5.Final sand layer shall be laid after completio


• After final compaction, surface shall be leveled by using

Construction Sequ
tion Verification Test
oad Test on the Outer Ring Wall

ner 2 mm-Installation
d Sand Above HDPE Liner
lation of Anode Ribbon
otection Vendor

er completion of Cathodic protection works.


eveled by using the hand tools (Aluminum frame)

ruction Sequence