You are on page 1of 28

Summary of Tender Offer (Civil)

Construction of a new 33/11 kV, 2X10/13.33MVA, regular type AIS Substation at Brahmanbaria
under BB-Brahmon Baria, BPDB(Package No-02)
Section Summary content Amount Remarks
ABSTRACT COST OF CIVIL WORKS of
SECTION - 1 8,019,175.24
CONTROL BUILDING
SECTION - 2 ABSTRACT COST OF GENERAL WORKS 3,100,937.00
ABSTRACT COST OF SWITCHYARD CIVIL
SECTION - 3 5,753,109.47
WORKS
ABSTRACT COST OF CIVIL WORKS OF
SECTION - 4 377,495.14
GUARD POST
ABSTRACT COST OF CIVIL WORKS OF
SECTION - 5
Boundary wall 1,628,798.90
Total Amount 18,879,515.75
Price Offer For Brahmanbaria AIS Subtation

Client :BANGLADESH POWER DEVELOPMENT BOARD (BPDB)

ABSTRACT COST OF CIVIL WORKS of CONTROL BUILDING


SECTION - 1
SL Description Unit Quantity Rate in Taka Total Amount Remarks
A) CIVIL WORKS
Conducting survey work for layout of
structures in accordance with design
1 sqm 235.00 24.00 5,640.00
and drawings.

Earth work in excavation of all kinds


of soils of foundation trenches
including leveling, ramming and
preparing the base, bailing out water
2 Cum 130.00 220.00 28,600.00
and shoring if necessary, providing
centre line and bench mark pillars,
removing the spoils etc. to a lead not
exceeding 60m. all complete as per
direction of theinEngineer
Earth filling in charge.
foundation trenches
and plinth in 150 mm layer with earth
available within 90 m of the building
site, watering, leveling and
3 consolidating each layer up to finished Cum 130.00 140.00 18,200.00
level etc. all complete as per direction
of the engineer-in-charge.

Sand Khoa Consolidation (2:1) in


foundation trenches or floor: 200mm
4 down well graded brick-chips and Cum 15.00 4,239.00 63,585.00
sand (F.M.0.8)

Sand filling in foundation trenches and


plinth with coarse sand having min.
F.M 0.8 in 150 mm layers including
leveling, watering and consolidating
5 each layer up to finished level (to be Cum 92.00 2,000.00 184,000.00
used when required as per design
supplied by the design office only) etc.
all complete as per direction of the
engineer-in-charge.
One layer of brick flat soling in
foundation or in floor with first class
or picked jhama bricks including
6 preparation of bed and filling the Sqm 204.00 350.00 71,400.00
interstices with local sand, leveling
etc. complete and accepted by the
Engineer.
Mass concrete (1:3:6) in foundation or
floor with cement, sand (F.M. 1.2) and
picked jhama chips including breaking
chips, screening, mixing, laying,
7 compacting to levels and curing for at Cum 5.70 5,000.00 28,500.00
least 7 days including the supply of
water, electricity and other charges
and costs of tools and plants etc. all
complete and accepted by the
Engineer.
Providng and(Cement: CEM-II/A-
laying double layer
M).Mass concrete
polythene sheet in 1.00kg
weighing foundation
per
(1:2:4) with brick chips and local
6.5 sqm under pile cap and pit bottom sand
8 Sqm 995 40.00 39,800.00
of F.M.
slab etc.1.2
all complete as per direction
of EIC.
ramp proof course (1:2:4) with brick
9 chips and 50% Sylhet sand (F.M. 2.2) Sqm 11.57 980.00 11,338.60
and 50% local sand (F.M. 1.2).
250 mm thick brick work in Super
structure with 1st class bricks in
cement (Scan/Holcim) mortar (1:6)
including filling the interstices with
mortar, racking out joints, cleaning
10 and soaking the bricks before use, cum 83.00 4,000.00 332,000.00
curing for at least 7 days etc. complete
as per direction of the Engineer-in-
charge.

125 mm thick brick work in Super


structure with 1st class bricks in
cement mortar (1:4) including filling
11 the interstices with mortar, racking out sqm 97.00 800.00 77,600.00
joints, cleaning and soaking the bricks
before use, curing for at least 7 days
etc. complete as per direction of the
Reinforcement cement concrete works
Engineer-in-charge.
using wooden material as shutter ,
having specified compressive strength
f'c =3500 or f'c =3000 psi at 28 days
on standard cylinder , with with
cement (Scan/Fresh) confirming to
BDS 232 & ASTM standard , best
quality coarse sand , 20 mm down well
graded crushed stone chips including -
breaking chips and screening through
proper sieves , making , placing in
position the centering and shuttering ,
making shuttering water tight , placing
of reinforcement in ,position; concrete
mixing with mixer machine , casting
in forms , compacting by vibrator
machine and curing at least for 28
days , removing
a) Footing (1:1.5:3,centering shuttering
f'c=3000psi) using
etc. all
Stone complete including cost of Cum
chips 32.25 10,000.00 322,458.75
water , electricity , testing of materials
12 b)
andColumn (1:1.5:3,&f'c=3500psi)
and concrete using
other charges as Cum 15.50 10,000.00 154,977.19
Stone chips
per direction of the engineer in
charge
c) Ground
. Beam (1:1.5:3, f'c=3000psi)
using Stone chips Cum 14.09 10,000.00 140,943.75
d) Floor Beam (1:1.5:3,f'c=3000psi)
using Stone chips Cum 15.05 10,000.00 150,483.75

e) Roof Beam(1:1.5:3, f'c=3000psi)


using Stone chips Cum 9.87 10,000.00 98,660.63
f) Roof & 1st Slab (1:1.5:3,
f'c=3000psi) using Stone chips Cum 67.45 10,000.00 674,465.63
g) Lintel and Sunshad (1:2:4,
f'c=3000psi) using Stone chips Cum 3.49 10,000.00 34,890.00
h) Stair (1:1.5:3, f'c=3000psi) using
stone chips cum 2.80 10,000.00 28,000.00
i) Ground slab (1:2:4, f'c=3000psi)
using stone chips Cum 32.36 10,000.00 323,621.25
Supplying, fabrication and fixing to
details as per design M.S deformed bar
as reinforcement of required size and
length for all types of RCC work in/c
straightening the rod, removing rusts,
-
cleaning, cutting, hooking, bending,
13 binding with 22 B.W.G. GI wire,
placing the bars in position, in/c
lapping, spacing and securing them in
position by concrete blocks, metal
chairs,grade
60 etc. (GPH/
completeAKS/KSRM)
as per
specifications,
deformed drawings
bar with and fy
minimum direction
= 412 kg 39680.00 75.00 2,976,000.00
of the Engineer-in-charge.
Mpa
Formwork/shuttering (wooden) The
formwork must be rigid enough both
in and out of plane, to make the
concrete surface true to the designed
shape and size, along with prop and
necessary supports etc. all complete
14 sqm 995 300.00 298,500.00
approved and accepted by the
Engineer. and removal of form after
hardening of the concrete & the
concrete strength meets the design and
specification requirements. The
formwork support design and
calculation
Supplying, shall
fittingbeandsubmitted to the
fixing mirror
engineer
polished for review
floor tiles in
onadvance
35 mmbefore
thick
construction
cement and construction
sand (F.M.1.2) in
mortar (1:2)
accordance with the
base and raking approved
out design
the joints with -
white cement and colored pigment
including cutting and laying tiles in
proper way and finishing with care etc,
all complete as per direction of the
a. Floor Tiles (900*900mm) Sqm 94.02 1,300.00 122,227.95
15 engineer-in-charge.
a. Floor Tiles(600*600mm) Sqm 100.00 1,100.00 110,000.00
b. Toilet Floor Tiles 300*300 Sqm 6.81 1,080.00 7,357.50
c. Stair Tiles Sqm 22.24 1,300.00 28,908.75
d. SKIRTING
(Height 150mm, APPROVED
QUALITY HOMOGENOUS WALL rm 90.00 280.00 25,200.00
TILES)

Supplying, fitting and fixing Wall tiles


on 35 mm thick cement sand (F.M.1.2)
mortar (1:2) base and raking out the
16 joints with white cement and colored Sqm 20.37 951.00 19,371.87
pigment including cutting and laying
tiles in proper way and finishing with
care etc, all complete as per direction
Supplying, fitting
of the engineer-in-charge. and fixing
Architectural Wall tiles (mirpur
ceramics facing bricks)size
200x62.5x12mm on 35 mm thick
17 cement sand (F.M.1.2) mortar (1:2) Sqm 118.80 1,200.00 142,560.00
base and raking out the joints with
white cement and colored pigment
including cutting and laying tiles in
proper
Minimum way12 andmm
finishing
thick with
cementcaresand
etc,
all complete
(F.M. as perfinishing
1.2) plaster directionto of the
plinth
engineer-in-charge.
wall (1:6) in/c washing of sand,
18 finishing the edges and corners and Sqm 1632.61 100.00 163,261.40
curing at least for 7 days, . all
complete in all respect as per drawing
and
PLASTERdirection
WITH of NEAT
the engineer-in-
CEMENT
19 charge. Sqm 188.00 170.00 31,960.00
FINISHING (N.C.F.)(Floor )
SKIRTING WITH PLASTER WITH
20 NEAT CEMENT FINISHING RM 52.10 180.00 9,378.00
(N..C.F.)150MM HEIGHT

Syppling & works of Plastic emulsion


paint of approved best quality and
colour delivered from authorized local
agent of the manufacturer in a sealed
container, applying to wall and ceiling
in two coats over a coat of brand
specified primer or sealer elapsing
specified time for drying/recoating
21 including cleaning drying, making free Sqm 852.80 160.00 136,448.44
from dirt, grease, wax, removing all
chalked & scaled materials, fungus,
mending good the surface defects,
sand papering the surface and
necessary scaffolding, spreading by
brush/ roller/spray etc. all complete in
all floor as per direction of the
engineer-in-charge.
Supply & Works of Wheather coat on
out side wall of approved quality and
colour delivered from authorized local
agent of the manufacturer in a sealed
container, made from water based
powder mixed with water (1:1),
22 applying first coat, curing the same Sqm 401.01 180.00 72,181.80
after six hours for 24 hours, second
coat applied and curing the same for 7
(seven) days etc, taking care and
cleaning the surface fully from grease,
oily substances, old paints, lime wash,
fungus, algae etc., sand papering the
surface before
Supplying, applying
fitting and 1stfixing
and 2ndof
coat, complete as per direction
Aluminium sliding window as per of the
the
engineer-in-charge.
U.S. Architectural Aluminium
Manufacturer’s Association (AAMA)
standard specification having 1.2 mm
thick outer bottom (size 75.50 mm,
32mm), 1.2 mm thick outer top (size
75.50 mm, 16.80 mm), 1.2 mm thick
shutter top (size 33 mm.26.80, 22
mm), 1.2 mm thick shutter bottom
23 (size 60mm, 24.40 mm), 1.2 mm thick Sqm 32.67 2500.00 81,675.00
outer side(size 75.50 mm,19.90 mm),
1.2 mm thick sliding fixed side (size
31 mm, 26 mm),1.2 mm thick shutter
lock (size 49.20 mm 26.20 mm) & 1.2
mm thick inter lock (size 34.40 mm,
32.10 mm) sections all Aluminium
members (Total weight kg/sqm) will
be anodized to Aluminium
Bronze/Silver color with a coat not
less than 15 micron in thickness and
Supplying,
density of 4fitting
mg perand square
fixing window
cm etc.
& verendaall
including grills of any design
accessories made
like sliding
24 with
door key12 lock,
x12 sliding
mm sqdoor barwheel,
in/c Sqm 32.67 1642.00 53,644.14
fabricating,
sliding doorweldingmohiar,cost sliding
of electricity
door
& tools & bolts
neoprene, plants&etc.nutscomplete for all
in/c sealants,
floors
keepingas per direction
provision & offitting
the engineer-
5 mm
Supplying,
thick Tai fitting
in-charge. glassand fixing curtain
including labour
25 (vertical blind)fitting
as per ofdirection of the Sqm 32.67 430.00 14,048.10
charge for accessories,
engineer-in-charge.
making grooves & mending good
Supplying, fitting and fixing vertical
damages, carriage, and &electricity
rolling shutter(Manual electric
complete
operation in
) all
of respect
any designas per anddrawing
shape
and direction of the engineer-in-
made of 24 SWG G.P. sheet unit
charge.
minimum 69 mm width having 10 mm
and 12 mm dia circular foding at ends,
rolled in machine, locked together
properly to form rolling shutter, top of
the shutter to be fitted with circular
spring box made of 22 BWG sheet,
containing best quality spring made in
26 China, nutted with 38 mm G.I. pipe at Sqm 10.40 2,000.00 20,800.00
one end and the other end nutted to
shutter including fitting the G.I. pipe
again with 375 mm * 300 mm * 6 mm
M.S. plate with 2 mm *19 mm * 3 mm
F.I. bar, middle channel consist of 2
mm *150 mm * 6 mm M.S. plate with
2 mm *19 mm *6 mm fixed to wall or
column with clamps enbedded in
R.C.C. part by cement concrete
(1:1.5:3) including cutting holes
(minimum 3 mm * 25mm *6mm )
mending the
Supplying, fittingdamages,
and fixing finishing,
Swing
curing,
door bottom end of shutter fitted to
(1500*2100,wooden,Double
folded
shutter)G.P.
withsheet (min 125accessories,
necessary mm width
in two layers),
complete in all which
respectisasagain fitted to
per approved
27 25 mm * 25mm *3mm
drawing specification and accepted angle,
by Sqm 6.30 5,000.00 31,500.00
providing handle with F.I. bar 25 mm*
the Engineer-in-charge.
6 mm and locking arrangement in both
sides, painting two coats with
approved colour and brand of
synthetic enamel paint over a coat of
priming etc. complete in all respect as
per approved drawing specification
and accepted by the Engineer-in-
charge.
Supplying, fitting and fixing Swing
door (1000*2100,wooden, Single
shutter) with necessary accessories,
complete in all respect as per approved
28 drawing specification and accepted by Sqm 4.20 9,479.00 39,811.80
the Engineer-in-charge.

Supplying, fitting and fixing Swing


door (750/1000*2100,pvc, Single
shutter) with necessary accessories,
complete in all respect as per approved
29 drawing specification and accepted by Sqm 3.68 6,194.92 22,797.31
the Engineer-in-charge.

Supplying, fitting and fixing gypsum


board ceiling of 9 mm thick board
laminated by mechanical hot press
with a milk white PVC membrane
with Aluminium T-bar frame in
natural anodized finish at 600 x 600
mm in grid suspended from ceiling by
30 sqm 196.94 1,050.00 206,784.38
12 SWG double ply wire fixed to the
ceiling by rowel plug, screws, hooks,
nails etc. maintaining straight lines and
desired finished level a bottom face
with vertical wooden strut as required
including making holes in slab

Stair case railing Ver 25mm & Top 50


31 mm SS Pipe Rm 13.40 6,000.00 80,400.00
Drainage System with Bulding Side
Apron (Drainage trench net section
size: 500mm*600mm (average).
R.C.C MIXED RATIO (1:1.5:3)
CASTING WITH 20mm DOWN
32 Rm 65.00 2,000.00 130,000.00
GRADED STONE CHIPS
STRENGTH fc=3000 psi ; 60 grade
(GPH/ AKS/KSRM) deformed bar
with minimum fy = 412 Mpa).).
Including construction and all
materials & tools, complete in all
LIME TERRACING
respect as per approved design &
(2:2:7=LIME:SHURKI:75MM
drawing BRICK
DOWN and accepted
CHIPS),by the enginner-
MINIMUM
in-charge.
THICKNESS SHALL BE 25MM AT
THE LOWER POINT OF THE ROOF
WITH A SLOPE OF 1:50, THE
TOP OF THE TERRACING SHALL
BE COVERED WITH LAYER OF
BITUMINOUS PAINT
,sueki from 1st class brick and
minimum lime content 500kg per 2.83
33 cubic meter (stone lime brounght at sqm 238.19 230.00 54,784.28
site ,not being pownered in open air
and to be slaked on presence of
engineer-in-charge and to be measured
in volume three days after slaking for
using in the mix)in the proportion
7:2:2(brick chip:surki:lime)including
preparation of the mix on the ground
by making a suitable platform under
proper polythene cover,cutting the mix
twice daily with limewater (1:10)at
least for 7 days until the mix attain
desirable consisttency laying the mix
in proper slope ,beating the same with
standard "koppa"for minimum 7 days
to gain maximum
consoildation ,making ghoondy and
neat finishing with lime surki mortar
(1:2)and curing for 21 days providing
polythene cover after each day work
and cleaning etc.complete in all
respect accepted by the enginner-in-
charge.
Supplying, fitting and fixing of Hot-
Rolled Steel climbing ladder with
guard for exterior wall conforming to
ASTM A36, with a minimum yield
strength of 250Mpa, including the cost
of testing, application of red/grey-
oxide primer & premium synthetic
enamel paint (of approved best quality
34 and colour delivered from authorized Lot 1.00 7,000.00 7,000.00
local agent of the manufacturer in a
sealed container, having highly water
resistant, high bondibilty and flexiblity
property; using specified brand thinner
applying to metallic surface by spray
machine in two coats over single coat
anti-corrosive coating including
cleaning, drying, making free from
dirt, grease,fitting
Supplying, wax removing
and fixingallofchalked
Hot-
and
Rolledscaled
Steelmaterials) etc.,
cover plate forallVoid.
complete
in any floors as per approved
conforming to ASTM A36, with a drawing
specification
minimum yield andstrength
accepted
of by the
250Mpa,
Engineer-in-charge.
including the cost of testing of plates,
application of red/grey-oxide primer &
premium synthetic enamel paint (of
approved best quality and colour
delivered from authorized local agent
of the manufacturer in a sealed
container, having highly water
resistant, high bondibilty and flexiblity
property; using specified brand thinner
35 applying to metallic surface by spray Kg 120.00 100.00 12,000.00
machine in two coats over single coat
anti-corrosive coating including
cleaning, drying, making free from
dirt, grease, wax removing all chalked
and scaled materials) etc., all complete
in any floors as per approved drawing
specification and accepted by the
Engineer-in-charge.

Supply fabrication and Installation of


Pre-embedded iron , including the
cost of application of red/grey-oxide
36 primer & premium synthetic enamel Kg 335.00 70.00 23,450.00
paint, all complete in any floors as per
approved drawing specification and
accepted
Supply &by the Engineer-in-charge.
installation LED Electronic
37 sign board for the substation control Nos 1.00 2,200.00 2,200.00
room as per direction of the engineer-
in-charge.
Supply,installation and commisioning
of Building lighting System (including
lamps, wires, buried pipes, Switch &
38 socket etc.) complete in all respect as sqm 436.80 700.00 305,760.00
per design & direction of the
engineer-in-charge. (Calculate
according to the floor area of the
Supply,Installation & Commissioning
control building)
of Lighting , Power Distribution Box: set
20A TP MCB (Main Breaker),2nos. 1 2,500.00 2,500.00
6A SPMCB,1nos. 10A SPMCB,2nos.
16A SPMCB,1nos. 20A SPMCB,one
39 spare
Supply,Installation & Commissioning set
of Lighting , Power Distribution Box:
63A TP MCCB (Main Breaker),2nos. 1 3,000.00 3,000.00
6A SPMCB,2nos. 10A SPMCB,3nos.
16A SPMCB,1nos. 20A SPMCB,4nos.
40A SPMCB,one spare
Emergency lighting rgency automated
dc lighting System in case of power
failure for Control Room building,
40 Including: Supply,installation and Lot 1.00 7000.00 7,000.00
commisioning of of Emergency
lighting System,with all necessary
accessories, complete in all respect as
per approved&drawing
Installation specification
Commissioning of
and accepted
Vertical by theelectrode:Copper
grounding Engineer-in-
charge.
teel grounding rod 16mm in diameter
41 and 4000 mm in length with drill bit, Unit 40.00 700.00 28,000.00
connector, bolt and other
accessories,The connection
method:Exothermic welding of
Installation & Commissioning
Copper wire:185mm2(for
42 grounding),The connection rm 200.00 400.00 80,000.00
method:Exothermic welding;with
earthwork
Installation & Commissioning of
Vertical grounding electrode,Copper
wire 125/150/185/240mm2 in 根
43 4 700.00 2,800.00
diameter and 17000 mm in depth with Unit
boring, connector, bolt and other
accessories
Installation & Commissioning of
Vertical grounding electrode,Copper
wire 125/150/185/240mm2 in 根
44 4 700.00 2,800.00
diameter and 30000 mm in depth with Unit
boring, connector, bolt and other
access
45 C Channel steel instlation work for kg 489.00 120.00 58,680.00
panel foundation
Supply,Installation & Commissioning
of roof lightning belt(round steel Meter 80 500.00 40,000.00
10mm in diameter)

Supply,Installation & Commissioning


of copper rod(copper rod 10mm in Meter 24 700.00 16,800.00
46 diameter)
Supply,Installation & Commissioning
of lightning rod(copper rod 10mm in piece 2 1,100.00 2,200.00
diameter)
Supply,Installation & Commissioning
of lightning electrode(round steel piece 2 1,100.00 2,200.00
12mm in diameter,4m)
TOTAL COST 8,019,175.24
Price Offer For Brahmanbaria AIS Subtation

Client :BANGLADESH POWER DEVELOPMENT BOARD (BPDB)

General Work

SECTION - 2
SL Description Unit Quantity Rate in Taka Total Amount Remarks
A) General Site Work
Site surface cleaning, all obstacle removal, transporting & disposing
(Include but not limit: tree,grass,exising building,pole,tower,stepc
tank,soak well,underground pilp & cable,etc.), Cleaning, transporting Subcontractors need to
1 & disposing of cultivated soil,etc. as per drawing and direction of the Lot 1.00 1,300,000.00 1,300,000.00
fully inspect the site
engineer-in-charge

Land Development,Soil/Sand filling and leveling,including


purchase of soil/Sand, as per drawing and direction of the engineer-
2 in-charge. Cum 80.00 1,400.00 112,000.00

Approved Quality Gravel filling,as per drawing and direction of the


3 engineer-in-charge. Cum 20.00 8,500.00 170,000.00

RCC Road , Including Road surface, base, earthwork, complete in


all respect as per approved drawing and accepted by the Engineer-in-
4 charge. Sqm 234.00 550.00 128,700.00

Substation Gate 4 m wide steel gate with access doors for people,
including brick column on both sides of the gate which finished by
tile, the sign of substation name and BPDB logo should be installed one push &pull and one
5 on the gate, construction in accordance with approved drawings lot 2.00 60,000.00 120,000.00
open up

Landscaping & Gardening Tree Plantation, gardening and


6 butification for substation areas as per BPDB's requirment Sqm 50.00 300.00 15,000.00
Chain Link Fence with Gate, brickwork & RCC
Foundation , including earthwork, complete in all respect as per
7 approved drawing and accepted by the Engineer-in-charge. Rm 80.00 1,800.00 144,000.00

B) Hydraulic Part -
Supplying, fitting & fixing of food grade plastic Overhead water
tank(2000liter) on the top of the control room building &
underground water reservoir (tank, 2000liter), 1set water lifting
pump, 1set suction pump and portable water supply system, with all
necessary accessories (such as: column pipe (AP1-5L, grade B) with
flange, gasket,Non-return valve, pressure gauge, 40 meter (131'-0'')
long required marine cable in a single length etc), complete in all
respect as per approved drawing [Design shall be based on use of 10
persons per day] and accepted by the Engineer-in-charge.
(Pump specification: capacity multistage sub-mersible water Pump
Motor Set manufactured according to DIN/NEMA/IEC/BS/VDE/JIS
1 & ISO 9001 standard comprising of 2900 RPM, 3 Phase sub- Lot 1.00 12,000.00 12,000.00
mersible motor having Insulation: Class F & Protection:
IP68(Minimum) , suitable for operation at 400 /230± 5% volt, 50 Hz
AC. Motor : 2 H.P. Suction X Delivery: 50mm X50mm. Discharge :
50-300 liter/min. Head : 23 meter. Column pipe : 50 mm

Supplying, fitting and fixing of PP-R Pipe meeting the perfomance


and long-tem strength requirements as per DIN 8077/78 or ASTM F
2983 including nipple, elbow, reducers, Tee, end cap, plug, socket,
Union, Gate Valve etc as per manufacturer instuction . all complete -
accepted by the Engineer-in -charge.

2
19 mm dia, minimum wall thickness 3.5mm, sustaining minimum
water pressure PN 16, standard dimension ratio (SDR) 7.4
Rm 10.00 300.00 3,000.00

25 mm dia, minimum wall thickness 4.4mm, sustaining minimum


water pressure PN 16, standard dimension ratio (SDR) 7.4 Rm 10.00 246.00 2,460.00

Supplying, fitting and fixing of G.I. pile with all special fittings, such
as bends, elbows, sockets, reducing sockets Tee, unions, jam-nuts etc.
including cutting trecches where necessary and fitting the same with
earth duly rammed and fixing in walls with holder bats and making
hole in floors, walls and consequent mending good the damages etc. -
all complete in all respects approved and accepted by the Engineer-in
-charge.

3
50 mm dia G.I. pipe with all thickness 3.65mm, outside diameter min
57.3mm, weight 5.38kg/m, can withstand min 50kg/cm2 hydraulic
pressure. Rm 15.00 450.00 6,750.00
3

100 mm dia G.I. pipe with all thickness 3.65mm, outside diameter
min 107.3 mm, weight 10.42kg/m, can withstand min 50kg/cm2
hydraulic pressure. Rm 15.00 980.00 14,700.00

Supplying, Installation & commissioning of Water purification


system which should be use for 10 persons per day, as per BPDB's
4 requirement. Lot 1.00 25,000.00 25,000.00

C) Drainage System Part -


1 Drain pipe DN300 Concrete pipe,including earthwork Rm 10 1100 11,000.00
2 Drain pipe DN200 Concrete pipe,including earthwork Rm 10 1100 11,000.00
3 Supplying &fixing Sewage pipe DN110 Concrete Pipe,including Rm 30 900 27,000.00
earthwork

Supplying &fixing Roof drop pipe DN100 UPVC pipe,100mm


inside dia best quality upvc soil,waste and ventilation pipehaving
specific gravity 1.35-1.45,wall thickness 3.5-4.4mm,and other
4 physical,chemical,fire resistivity properties etc.as per BSTIn Rm 50 650 32,500.00
approved manufacturer standards or ASTM ,BS/ISO/IS standards
fitting in position with socket etc.approved and accepted by the
engineer in charge(10 users)

Construction of Septic tank of 4.6 x 2.55 x 2.35 m with brick work in


cement mortar (1:6)having a lining of minimum 125mm R.C.C cast
against the walls as per approved type plan over a brick flat soling
and 150mm thick cement reinforced cement flooring (1:2:4)with
125mm thick walls in partition and 12mm thick cement
plaster(1:4)with N.C.F to insides of wall on floor and all around
outside walls by 450mm height at top incluiding supply,fitting and
fixing of two R.C.C.tees and providing 450mm dia water sealed
5 Nos 1.00 130000 130,000.00
heavy type C.I manhole cover with locking/unlocking arrangment and
100mm thick R.c.c.(1:2:4)top slab,including centering shutter
fabricating casting and curing ect complete up to required depth
including necessary earth work in excavation and shoring bailing out
water and side filling including the cost of all materials (such as RCC,
reinforcement etc.), operations and incidental chargrs.etc.all compete
as per drawing & type plan approved and accepted by the engineer-in
-charge.

Construction of Soak well of Φ2.5m diameter with 250mm thick


solid brick work(5m deep) and 250mm honey comb brick with
cement mortar (1:6) as per design over R.C.C (1:2:4) well curb with
1% reinforcement up to the depth as per drawing with 450mm dia
water sealed heavy tpye.C.I. manhole cover with locking arrangment
dilling the well up to the required depth with graded khoa and sand
6 Nos 1.00 60000 60,000.00
including suppying and fabricating M.S.rod,casting,curing,
including necessary earth work in excavation,side filling and bailing
out water including cost of all materials etc.all compete as per
drawing,design approved and accepted by the engineer-in -
charge(rate is including cost of reinforcement and fabrication,binding
and placing)(10 users)

RCC drainage trench Net section size: 500mm*600mm (average).


R.C.C MIXED RATIO (1:1.5:3) CASTING WITH 20mm DOWN
GRADED STONE CHIPS STRENGTH fc=3000 psi ; 60 grade
7 (GPH/ AKS/KSRM) deformed bar with minimum fy = 412 Rm 30.00 2200 66,000.00
Mpa).Including construction and all materials & tools, complete in all
respect as per approved design & drawing and accepted by the
enginner-in-charge.

Brickwall drainage trench Net section size: 500mm*600mm


(average). Including construction and all materials & tools, complete
8 in all respect as per approved design & drawing and accepted by the Rm 30.00 800 24,000.00
enginner-in-charge.

D) Bathroom ware Supply, Installation & Commissioning -


Washbasin All sanitary wares shall be of European standard high
quality or equivalent to size 600mmX500mmX855mm , 26.9 kg. All
fittings for sanitary wares shall be in accordance with European
1 Nos 2.00 15000.00 30,000.00
standard high quality JIS A 5514 or equivalent .All accessories and
visible sanitary wares such as faucets, flush valves and flushing pipes
shall be nickel chromium plated.
2 CP shower Mixture including shower head only Nos 2.00 2500.00 5,000.00

Supplying, fitting and fixing super quality 600 x 125 mm coloured


3 glass (plate) shelf having 5 mm thickness with fancy C.P. brackets, Nos 2.00 1200.00 2,400.00
screws and frames including making holes in walls and mending good
the damages with cement mortar (1:4) etc. all complete approved and
accepted by the Engineer.
Supplying, fitting and fixing standard size soap tray including
making holes in walls and mending good the damages with cement
4 Nos 2.00 250.00 500.00
mortar (1:4) etc. all complete approved and accepted by the Engineer.
(C.P. soap tray)
Supplying, fitting and fixing medium quality C.P. Towel rail of 600
mm long and 20 mm in dia with C.P. holder including making holes
5 Nos 2.00 500.00 1,000.00
in walls and mending good the damages with cement mortar (1:4) etc.
all complete approved and accepted by the Engineer.

Supply and fitting-fixing cleansing shower for ablution including


6 holder of following types: Fixed type 100 mm CP shower rose. all Nos 1.00 1000.00 1,000.00
complete and accepted by the Engineer.

Supplying, fitting and fixing 125 mm dia stainless steel floor grating
in traps or in drains including making holes in walls/floors and
7 Nos 1.00 257.00 257.00
mending good the damages with cement mortar (1:4) etc. all complete
approved and accepted by the Engineer.

Supplying, fitting and fixing Special/Fancy quality C.P. concealed/


8 Surface Angle stop cock etc. complete approved and accepted by the Nos 1.00 870.00 870.00
Engineer. 12 mm CP surface mounted angle stop cock (general)

Supplying, fitting and fixing best quality faucets etc. complete


9 Nos 2.00 1000.00 2,000.00
approved and accepted by the Engineer. 12 mm CP bib cock
Supplying, fitting and fixing Special/Fancy quality C.P. concealed/
10 surface stop cock with all necessary hardware and consumables Nos 1.00 1000.00 1,000.00
approved and accepted by the Engineer

11 Supplying, fitting and fixing Jet spray,all complete approved and Nos 1.00 800.00 800.00
accepted by the Engineer.
12 Supplying, fitting and fixing Water closet, all complete approved Nos 1.00 12000.00 12,000.00
and accepted by the Engineer.
Toilet Partitions In Melamine coated plywood toilet
13 partitions,with hardware fully equipped for proper operation. all Sqm 1.00 1800.00 1,800.00
complete approved and accepted by the Engineer.
Supplying, fitting and fixing Squatting pan, all complete approved
14 Nos 1.00 1500.00 1,500.00
and accepted by the Engineer.
E) Fire fighting part -
Supply, fitting and fixing Fire extinguiser equipment(As per
Scope of Works, Technical Specification and -
GTP)
1 Fire extinguisher Dry chemical type fire extinguisher Nos 2.00 10000.00 20,000.00 Unit price item
2 Fire extinguisher CO2 fire extinguisher Nos 2.00 10000.00 20,000.00 Unit price item
3 Fire extinguisher Foam type fire extinguisher Nos 2.00 10000.00 20,000.00 Unit price item
F) HVAC part -

Supply, Installation & Commissioning Intelligent low noise axial


1 fan NDF-5F/ZS, air volume 6600m3/h, wind pressure 73Pa; speed Nos 1.00 4200.00 4,200.00 Unit price item
960r/min, power 0.37KW/380V, noise ≤43dB(A), galvanized steel
wire fence, peripheral rain cover, with all necessary accessories, all
complete approved and accepted by the engineer in charge.
Supply, Installation & Commissioning Exhaust Fan, with all
2 necessary accessories, all complete approved and accepted by the Nos 1.00 1500.00 1,500.00 Unit price item
engineer in charge.

Supply, Installation & Commissioning of Split type Air


3 Condition of capacity Nos 4.00 140000 560,000.00 Unit price item
48000BTU, 3 phase, including MCB and all other
accessories. (As per Scope of Works,
Technical Specification and GTP), all complete approved and
accepted by the engineer in charge.
Total Amount 3,100,937.00
Price Offer For Brahmanbaria AIS Subtation

Client :BANGLADESH POWER DEVELOPMENT BOARD (BPDB)

ABSTRACT COST OF SWITCHYARD CIVIL WORKS

SECTION - 3
Rate in
SL Description Unit Quantity Total Amount Remarks
Taka
A) 2 Nos Power Transformer Foundation
Earth work in excavation of all kinds of soils of foundation trenches
including leveling, ramming and preparing the base, bailing out water
and shoring if necessary, providing centre line and bench mark pillars,
1 removing the spoils etc. to a lead not exceeding 60m. all complete as Cum 90.00 220.00 19,800.00
per direction of the Engineer in charge.

Earth filling in foundation trenches and plinth in 150 mm layer with


earth available within 90 m of the building site, watering, leveling and
2 consolidating each layer up to finished level etc. all complete as per Cum 90.00 140.00 12,600.00
direction of the engineer-in-charge.

Sand filling in foundation trenches and plinth with coarse sand


having min. F.M 0.8 in 150 mm layers including leveling, watering and
consolidating each layer up to finished level (to be used when required
3 as per design supplied by the design office only) etc. all complete as per Cum 18.00 500.00 9,000.00
direction of the engineer-in-charge.

Approved Quality Gravel filling , as per drawing and direction of


4 Cum 7.20 8,500.00 61,200.00
the engineer-in-charge.
Sand Khoa Consolidation (2:1) in foundation trenches or floor: 50mm
5 down well graded brick-chips and sand (F.M.0.8) Cum 18.00 4,239.00 76,302.00
One layer of brick flat soling in foundation or in floor with first class
or picked jhama bricks including preparation of bed and filling the
6 interstices with local sand, leveling etc. complete and accepted by the Sqm 45.00 300.00 13,500.00
Engineer.

Mass concrete (1:3:6) in foundation or floor with cement, sand (F.M.


1.2) and picked jhama chips including breaking chips, screening,
mixing, laying, compacting to levels and curing for at least 7 days
including the supply of water, electricity and other charges and costs of
7 tools and plants etc. all complete and accepted by the Engineer. Cum 2.40 6,147.00 14,752.80
(Cement: CEM-II/A-M).

Providng and laying double layer polythene sheet weighing 1.00kg per
8 6.5 sqm under pile cap and pit bottom slab etc. all complete as per Sqm 116.00 40.00 4,640.00
direction of EIC.

Reinforcement cement concrete works using wooden material as


shutter , having specified compressive strength f'c 20 Mpa at 28 days
on standard cylinder , with with cement (Scan/Fresh) confirming to
BDS 232 & ASTM standard , best quality coarse sand , 20 mm down
well graded crushed stone chips including breaking chips and screening
through proper sieves , making , placing in position the centering and
shuttering , making shuttering water tight , placing of reinforcement
in ,position; concrete mixing with mixer machine , casting in forms ,
compacting by vibrator machine and curing at least for 28 days ,
removing centering shuttering etc. all complete including cost of water ,
9 -
electricity , testing of materials and and concrete & other charges as per
direction of the engineer in charge .

a) Footing (1:1.5:3) using Stone chips Cum 36.00 9,154.00 329,544.00


Supplying, fabrication and fixing to details as per design M.S
deformed bar as reinforcement of required size and length for all
types of RCC work in/c straightening the rod, removing rusts, cleaning,
cutting, hooking, bending, binding with 22 B.W.G. GI wire, placing the
bars in position, in/c lapping, spacing and securing them in position by
concrete blocks, metal chairs, etc. complete as per specifications, -
drawings and direction of the Engineer-in-charge.
10

60 grade (GPH/ AKS/KSRM) deformed bar with minimum fy = 412


Mpa Kg 3500.00 70.00 245,000.00
Formwork/shuttering(wooden)The formwork must be rigid enough
both in and out of plane, to make the concrete surface true to the
designed shape and size, along with prop and necessary supports etc. all
complete approved and accepted by the Engineer. and removal of form
after hardening of the concrete & the concrete strength meets the design
and specification requirements. The formwork support design and
11 calculation shall be submitted to the engineer for review in advance sqm 116.00 380.00 44,080.00
before construction and construction in accordance with the approved
design.

Minimum 12 mm thick cement sand (F.M. 1.2) plaster finishing to


plinth wall (1:5) in/c washing of sand, finishing the edges and corners
and curing at least for 7 days, . all complete in all respect as per
12 drawing and direction of the engineer-in-charge. Sqm 12.00 190.00 2,280.00

Supplying, fabrication & Installation of HOT DIP GALVANISED Pre-


13 embedded iron Kg 132.00 200.00 26,400.00
Steel Rail -
Supplying of Steel heavy Rail (44kg~50kg/m, for power transformer
installation, as per drawing and direction of the engineer-in-charge) Kg 858.00 130.00 111,540.00
14
Installation of Steel Rail, all complete approved and accepted by the
engineer in charge. Kg 858.00 130.00 111,540.00

B) 10 Nos Granty Tower Foundation & 2 Nos EM Tower -


Earth work in excavation of all kinds of soils of foundation trenches
including leveling, ramming and preparing the base, bailing out water
and shoring if necessary, providing centre line and bench mark pillars,
1 removing the spoils etc. to a lead not exceeding 60m. all complete as Cum 141.00 220.00 31,020.00
per direction of the Engineer in charge.

Earth filling in foundation trenches and plinth in 150 mm layer with


earth available within 90 m of the building site, watering, leveling and
2 consolidating each layer up to finished level etc. all complete as per Cum 141.00 140.00 19,740.00
direction of the engineer-in-charge.
Sand Khoa Consolidation (2:1) in foundation trenches or floor: well
3 graded brick-chips and sand (F.M.0.8) Cum 29.00 4,039.00 117,131.00

Mass concrete (1:3:6) in foundation or floor with cement, sand (F.M.


1.2) and picked jhama chips including breaking chips, screening,
mixing, laying, compacting to levels and curing for at least 7 days
including the supply of water, electricity and other charges and costs of
tools and plants etc. all complete and accepted by the Engineer.
4 (Cement: CEM-II/A-M).Mass concrete in foundation (1:2:4) with brick Cum 4.80 6,147.00 29,505.60
chips and local sand of F.M. 1.2

Providng and laying double layer polythene sheet weighing 1.00kg per
5 6.5 sqm under pile cap and pit bottom slab etc. all complete as per Sqm 65.00 40.00 2,600.00
direction of EIC.
Reinforcement cement concrete works using wooden material as
shutter , having specified compressive strength f'c 20 Mpa at 28 days
on standard cylinder , with with cement (Scan/Fresh) confirming to
BDS 232 & ASTM standard , best quality coarse sand , 20 mm down
well graded crushed stone chips including breaking chips and screening
through proper sieves , making , placing in position the centering and
shuttering , making shuttering water tight , placing of reinforcement
in ,position; concrete mixing with mixer machine , casting in forms ,
compacting by vibrator machine and curing at least for 28 days ,
removing centering shuttering etc. all complete including cost of water ,
6 -
electricity , testing of materials and and concrete & other charges as per
direction of the engineer in charge .

a) Casting (1:1.5:3) using Stone chips Cum 44.00 10,154.00 446,776.00


Supplying, fabrication and fixing to details as per design M.S
deformed bar as reinforcement of required size and length for all
types of RCC work in/c straightening the rod, removing rusts, cleaning,
cutting, hooking, bending, binding with 22 B.W.G. GI wire, placing the
bars in position, in/c lapping, spacing and securing them in position by
concrete blocks, metal chairs, etc. complete as per specifications, -
7 drawings and direction of the Engineer-in-charge.
7

60 grade (GPH/ AKS/KSRM) deformed bar with minimum fy = 412


Mpa Kg 3500.00 75.00 262,500.00

Formwork/shuttering (wooden),The formwork must be rigid enough


both in and out of plane, to make the concrete surface true to the
designed shape and size, along with prop and necessary supports etc. all
complete approved and accepted by the Engineer. and removal of form
after hardening of the concrete & the concrete strength meets the design
8 and specification requirements. The formwork support design and sqm 132.00 406.00 53,592.00
calculation shall be submitted to the engineer for review in advance
before construction and construction in accordance with the approved
design.

Minimum 12 mm thick cement sand (F.M. 1.2) plaster finishing to


plinth wall (1:5) in/c washing of sand, finishing the edges and corners
9 and curing at least for 7 days, . all complete in all respect as per Sqm 10.00 213.00 2,130.00
drawing and direction of the engineer-in-charge.

Suppply & Installation of Foundation Anchor Bolt;HOT DIP


GALVANISED, Class 5.6 Pre-embedded Anchor Bolt, with nut &
10 washers, complete in all respect as per approved drawing specification Kg 777.00 100.00 77,700.00
and accepted by the Engineer-in-charge.
C) LA CT &Station trasformer Foundation -
Earth work in excavation of all kinds of soils of foundation trenches
including leveling, ramming and preparing the base, bailing out water
and shoring if necessary, providing centre line and bench mark pillars,
1 removing the spoils etc. to a lead not exceeding 60m. all complete as Cum 28.00 220.00 6,160.00
per direction of the Engineer in charge.

Earth filling in foundation trenches and plinth in 150 mm layer with


earth available within 90 m of the building site, watering, leveling and
2 consolidating each layer up to finished level etc. all complete as per Cum 28.00 140.00 3,920.00
direction of the engineer-in-charge.

Mass concrete (1:3:6) in foundation or floor with cement, sand (F.M.


1.2) and picked jhama chips including breaking chips, screening,
mixing, laying, compacting to levels and curing for at least 7 days
including the supply of water, electricity and other charges and costs of
3 tools and plants etc. all complete and accepted by the Engineer. Cum 1.18 6,147.00 7,253.46
(Cement: CEM-II/A-M).Mass concrete in foundation (1:2:4) with brick
chips and local sand of F.M. 1.2

Providng and laying double layer polythene sheet weighing 1.00kg per
4 6.5 sqm under pile cap and pit bottom slab etc. all complete as per Sqm 16.00 40.00 640.00
direction of EIC.
Reinforcement cement concrete works using wooden material as
shutter , having specified compressive strength f'c 20 Mpa at 28 days
on standard cylinder , with with cement (Scan/Fresh) confirming to
BDS 232 & ASTM standard , best quality coarse sand , 20 mm down
well graded crushed stone chips including breaking chips and screening
through proper sieves , making , placing in position the centering and
shuttering , making shuttering water tight , placing of reinforcement
in ,position; concrete mixing with mixer machine , casting in forms ,
5 - -
compacting by vibrator machine and curing at least for 28 days ,
removing centering shuttering etc. all complete including cost of water ,
electricity , testing of materials and and concrete & other charges as per
direction of the engineer in charge .

a) Casting (1:1.5:3) using Stone chips Cum 10.00 10,154.00 101,540.00


Supplying, fabrication and fixing to details as per design M.S
deformed bar as reinforcement of required size and length for all
types of RCC work in/c straightening the rod, removing rusts, cleaning,
cutting, hooking, bending, binding with 22 B.W.G. GI wire, placing the
bars in position, in/c lapping, spacing and securing them in position by - -
6 concrete blocks, metal chairs, etc. complete as per specifications,
drawings and direction of the Engineer-in-charge.

60 grade (GPH/ AKS/KSRM) deformed bar with minimum fy = 412


Mpa Kg 600.00 75.00 45,000.00
Formwork/shuttering (wooden),The formwork must be rigid enough
both in and out of plane, to make the concrete surface true to the
designed shape and size, along with prop and necessary supports etc. all
complete approved and accepted by the Engineer. and removal of form
after hardening of the concrete & the concrete strength meets the design
and specification requirements. The formwork support design and
7 calculation shall be submitted to the engineer for review in advance sqm 70.00 406.00 28,420.00
before construction and construction in accordance with the approved
design.
Minimum 12 mm thick cement sand (F.M. 1.2) plaster finishing to
plinth wall (1:5) in/c washing of sand, finishing the edges and corners
8 and curing at least for 7 days, . all complete in all respect as per Sqm 2.00 213.00 426.00
drawing and direction of the engineer-in-charge.

Suppply & Installation of Foundation Anchor Bolt;HOT DIP


GALVANISED, Class 5.6 Pre-embedded Anchor Bolt, with nut &
9 washers, complete in all respect as per approved drawing specification Kg 35.28 100.00 3,528.00
and accepted by the Engineer-in-charge.
D) 5 Nos VCB foundation -
Earth work in excavation of all kinds of soils of foundation trenches
including leveling, ramming and preparing the base, bailing out water
and shoring if necessary, providing centre line and bench mark pillars,
removing the spoils etc. to a lead not exceeding 60m. all complete as
1 per direction of the Engineer in charge. Cum 45.90 220.00 10,098.00

Earth filling in foundation trenches and plinth in 150 mm layer with


earth available within 90 m of the building site, watering, leveling and
2 consolidating each layer up to finished level etc. all complete as per Cum 45.90 140.00 6,426.00
direction of the engineer-in-charge.
Mass concrete (1:3:6) in foundation or floor with cement, sand (F.M.
1.2) and picked jhama chips including breaking chips, screening,
mixing, laying, compacting to levels and curing for at least 7 days
including the supply of water, electricity and other charges and costs of
tools and plants etc. all complete and accepted by the Engineer.
3 (Cement: CEM-II/A-M).Mass concrete in foundation (1:2:4) with brick Cum 1.63 6,147.00 10,019.61
chips and local sand of F.M. 1.2

Providng and laying double layer polythene sheet weighing 1.00kg per
4 6.5 sqm under pile cap and pit bottom slab etc. all complete as per Sqm 22.00 40.00 880.00
direction of EIC.
Reinforcement cement concrete works using wooden material as
shutter , having specified compressive strength f'c 20 Mpa at 28 days
on standard cylinder , with with cement (Scan/Fresh) confirming to
BDS 232 & ASTM standard , best quality coarse sand , 20 mm down
well graded crushed stone chips including breaking chips and screening
through proper sieves , making , placing in position the centering and
shuttering , making shuttering water tight , placing of reinforcement
in ,position; concrete mixing with mixer machine , casting in forms ,
compacting by vibrator machine and curing at least for 28 days ,
removing centering shuttering etc. all complete including cost of water ,
5 - -
electricity , testing of materials and and concrete & other charges as per
direction of the engineer in charge .

a) Casting (1:1.5:3) using Stone chips Cum 12.00 9,000.00 108,000.00


Supplying, fabrication and fixing to details as per design M.S
deformed bar as reinforcement of required size and length for all
types of RCC work in/c straightening the rod, removing rusts, cleaning,
cutting, hooking, bending, binding with 22 B.W.G. GI wire, placing the - -
6 bars in position, in/c lapping, spacing and securing them in position by
concrete blocks, metal chairs, etc. complete as per specifications,
drawings and direction of the Engineer-in-charge.
60 grade (GPH/ AKS/KSRM) deformed bar with minimum fy = 412
Mpa Kg 800.00 75.00 60,000.00
Formwork/shuttering (wooden),The formwork must be rigid enough
both in and out of plane, to make the concrete surface true to the
designed shape and size, along with prop and necessary supports etc. all
complete approved and accepted by the Engineer. and removal of form
after hardening of the concrete & the concrete strength meets the design
7 and specification requirements. The formwork support design and sqm 70.00 406.00 28,420.00
calculation shall be submitted to the engineer for review in advance
before construction and construction in accordance with the approved
design.

Minimum 12 mm thick cement sand (F.M. 1.2) plaster finishing to


plinth wall (1:5) in/c washing of sand, finishing the edges and corners
8 and curing at least for 7 days, . all complete in all respect as per Sqm 5.00 223.00 1,115.00
drawing and direction of the engineer-in-charge.

Suppply & Installation of Foundation Anchor Bolt;HOT DIP


GALVANISED, Class 5.6 Pre-embedded Anchor Bolt, with nut &
9 washers, complete in all respect as per approved drawing specification Kg 26.00 110.00 2,860.00
and accepted by the Engineer-in-charge.
E) Switchyard Steel Part -
Installation of Steel Structures & Accessories all complete in all
1 respect as per drawing and direction of the engineer-in-charge. kg 22680.00 100.00 2,268,000.00
F) Cable Trench, RCC Cable Trench , in any size,with 50mm/100mm
RCC Cover, all complete in all respect as per drawing and direction of -
the engineer-in-charge.
Earth work in excavation of all kinds of soils of foundation trenches
including leveling, ramming and preparing the base, bailing out water
1 and shoring if necessary, providing centre line and bench mark pillars, Cum 49.00 220.00 10,780.00
removing the spoils etc. to a lead not exceeding 60m. all complete as
per direction of the Engineer in charge.

Earth filling in trenches and plinth in 150 mm layer with earth


available within 90 m of the building site, watering, leveling and
2 consolidating each layer up to finished level etc. all complete as per Cum 49.00 140.00 6,860.00
direction of the engineer-in-charge.
Mass concrete (1:3:6) in foundation of Cable trench with cement,
sand (F.M. 1.2) and picked jhama chips including breaking chips,
screening, mixing, laying, compacting to levels and curing for at least 7
days including the supply of water, electricity and other charges and
3 costs of tools and plants etc. all complete and accepted by the Engineer. Cum 8.00 6,047.00 48,376.00
(Cement: CEM-II/A-M).Mass concrete in foundation (1:2:4) with brick
chips and local sand of F.M. 1.2

Providng and laying double layer polythene sheet weighing 1.00kg per
4 6.5 sqm under pile cap and pit bottom slab etc. all complete as per Sqm 108.00 40.00 4,320.00
direction of EIC.
Reinforcement cement concrete works using wooden material as
shutter , having specified compressive strength F'c = 3000psi at 28
days on standard cylinder , with with cement (Scan/Fresh) confirming
to BDS 232 & ASTM standard , best quality coarse sand , 20 mm
down well graded crushed stone chips including breaking chips and
screening through proper sieves , making , placing in position the
centering and shuttering , making shuttering water tight , placing of
5 reinforcement in ,position; concrete mixing with mixer machine , -
casting in forms , compacting by vibrator machine and curing at least
for 28 days , removing centering shuttering etc. all complete including
cost of water , electricity , testing of materials and and concrete & other
charges as per direction of the engineer in charge .

a) Casting (1:1.5:3) using Stone chips Cum 35.00 9,054.00 316,890.00


Supplying, fabrication and fixing to details as per design M.S
deformed bar as reinforcement of required size and length for all
types of RCC work in/c straightening the rod, removing rusts, cleaning,
cutting, hooking, bending, binding with 22 B.W.G. GI wire, placing the
6 bars in position, in/c lapping, spacing and securing them in position by -
concrete blocks, metal chairs, etc. complete as per specifications,
drawings and direction of the Engineer-in-charge.

60 grade (GPH/ AKS/KSRM) deformed bar with minimum fy = 412


Mpa Kg 5238.00 75.00 392,850.00
7 Formwork/shuttering (wooden),The formwork must be rigid &
flatness enough both in and out of plane, to make the concrete surface
true to the designed shape and size, and flat enough not need to
decorate, along with prop and necessary supports etc. all complete
approved and accepted by the Engineer. and removal of form after
hardening of the concrete & the concrete strength meets the design and
specification requirements. The formwork support design and sqm 309.00 406.00 125,454.00
calculation shall be submitted to the engineer for review in advance
before construction and construction in accordance with the approved
design.

Supplying, fabrication & Installation of HOT DIP GALVANISED Pre-


8 embedded iron kg 300.00 100.00 30,000.00

Total Amount 5,753,109.47


Price Offer For Brahmanbaria AIS Subtation

Client :BANGLADESH POWER DEVELOPMENT BOARD (BPDB)

ABSTRACT COST OF CIVIL WORKS OF GUARD POST


SECTION - 4
SL Description Unit Quantity Rate in Taka Total Amount Remarks
A) CIVIL WORKS
Conducting survey work for layout of structures
1 in accordance with design and drawings. sqm 12.81 24.00 307.44

Earth work in excavation of all kinds of soils


of foundation trenches including leveling,
ramming and preparing the base, bailing out
water and shoring if necessary, providing centre
2 line and bench mark pillars, removing the spoils Cum 11.00 220.00 2,420.00
etc. to a lead not exceeding 60m. all complete as
per direction of the Engineer in charge.

Earth filling in foundation trenches and plinth


in 150 mm layer with earth available within 90 m
of the building site, watering, leveling and
3 consolidating each layer up to finished level etc.
Cum 11.00 145.00 1,595.00
all complete as per direction of the engineer-in-
charge.
Sand filling in foundation trenches and plinth
with coarse sand having min. F.M 0.8 in 150 mm
layers including leveling, watering and
consolidating each layer up to finished level (to
4 be used when required as per design supplied by
Cum 0.56 500.00 280.00
the design office only) etc. all complete as per
direction of the engineer-in-charge.

One layer of brick flat soling in foundation or in


floor with first class or picked jhama bricks
5 including preparation of bed and filling the Sqm 7.50 360.00 2,700.00
interstices with local sand, leveling etc. complete
and accepted by the Engineer.
Mass concrete (1:3:6) in foundation or floor
with cement, sand (F.M. 1.2) and picked jhama
chips including breaking chips, screening,
mixing, laying, compacting to levels and curing
for at least 7 days including the supply of water,
6 electricity and other charges and costs of tools Cum 0.51 6,147.00 3,134.97
and plants etc. all complete and accepted by the
Engineer. (Cement: CEM-II/A-M).

Providng and laying double layer polythene


sheet weighing 1.00kg per 6.5 sqm under pile cap
and pit bottom slab etc. all complete as per
7 direction of EIC.
Sqm 18.45 40.00 738.00

Ramp proof course (1:2:4) with brick chips and


8 50% Sylhet sand (F.M. 2.2) and 50% local sand Sqm 1.00 1,095.00 1,095.00
(F.M. 1.2).
250 mm thick brick work in Super structure
with 1st class bricks in cement (Scan/Holcim)
mortar (1:6) including filling the interstices with
9 mortar, racking out joints, cleaning and soaking cum 5.94 6,200.00 36,828.00
the bricks before use, curing for at least 7 days
etc. complete as per direction of the Engineer-in-
charge.
125 mm thick brick work in Super structure
with 1st class bricks in cement mortar (1:4)
including filling the interstices with mortar,
10 racking out joints, cleaning and soaking the sqm 5.20 918.00 4,773.60
bricks before use, curing for at least 7 days etc.
complete as per direction of the Engineer-in-
charge.
Reinforcement cement concrete works using
wooden material as shutter , having specified
compressive strength f'c 20 Mpa at 28 days on
standard cylinder , with with cement
(Scan/Fresh) confirming to BDS 232 & ASTM
standard , best quality coarse sand , 20 mm down
well graded crushed stone chips including
breaking chips and screening through proper
sieves , making , placing in position the centering
11 and shuttering , making shuttering water tight ,
-
placing of reinforcement in ,position; concrete
mixing with mixer machine , casting in forms ,
compacting by vibrator machine and curing at
least for 28 days , removing centering shuttering
etc. all complete including cost of water ,
electricity , testing of materials and and concrete
& other charges as per direction of the engineer in
charge .
a) Footing (1:1.5:3) using Stone chips Cum 1.32 10,000.00 13,200.00
b) Column (1:1.5:3) using Stone chips Cum 1.20 10,000.00 11,970.00
c) Gread Beam (1:1.5:3) using Stone chips Cum 0.89 10,000.00 8,910.00
d) Beam (1:2:4) using Stone chips Cum 0.41 10,000.00 4,100.00
e) Slab (1:2:4) using Stone chips Cum 2.41 10,000.00 24,100.00
f) Lintel and Sunshad (1:2:4) using Brick
chips Cum 1.02 10,000.00 10,200.00
Supplying, fabrication and fixing to details as
per design M.S deformed bar as reinforcement
of required size and length for all types of RCC
work in/c straightening the rod, removing rusts,
cleaning, cutting, hooking, bending, binding with
22 B.W.G. GI wire, placing the bars in position, -
12 in/c lapping, spacing and securing them in
position by concrete blocks, metal chairs, etc.
complete as per specifications, drawings and
direction of the Engineer-in-charge.

60 grade (GPH/ AKS/KSRM) deformed bar with


minimum fy = 412 Mpa Kg 800.00 75.00 60,000.00
Formwork/shuttering (wooden) The formwork
must be rigid enough both in and out of plane, to
make the concrete surface true to the designed
shape and size, along with prop and necessary
supports etc. all complete approved and accepted
by the Engineer. and removal of form after
hardening of the concrete & the concrete strength
13 meets the design and specification requirements. sqm 60.60 416.00 25,209.60
The formwork support design and calculation
shall be submitted to the engineer for review in
advance before construction and construction in
accordance with the approved design.

Supplying, fitting and fixing mirror polished


floor tiles on 35 mm thick cement sand (F.M.1.2)
mortar (1:2) base and raking out the joints with
white cement and colored pigment including
cutting and laying tiles in proper way and -
13 finishing with care etc, all complete as per
direction of the engineer-in-charge.
13

a. Floor Tiles 600*600mm Sqm 4.50 2,413.00 10,858.50


b. Toilet Floor Tiles 300*300mm Sqm 2.50 1,526.00 3,815.00
Supplying, fitting and fixing Wall tiles on 35
mm thick cement sand (F.M.1.2) mortar (1:2)
base and raking out the joints with white cement
14 and colored pigment including cutting and laying Sqm 10.00 1,271.00 12,710.00
tiles in proper way and finishing with care etc, all
complete as per direction of the engineer-in-
charge.
Minimum 12 mm thick cement sand (F.M. 1.2)
plaster finishing to plinth wall (1:6) in/c
washing of sand, finishing the edges and corners
15 and curing at least for 7 days, . all complete in all Sqm 106.00 213.00 22,578.00
respect as per drawing and direction of the
engineer-in-charge.
Syppling & works of Plastic emulsion paint of
approved best quality and colour delivered from
authorized local agent of the manufacturer in a
sealed container, applying to wall and ceiling in
two coats over a coat of brand specified primer or
sealer elapsing specified time for
16 drying/recoating including cleaning drying, Sqm 39.00 210.00 8,190.00
making free from dirt, grease, wax, removing all
chalked & scaled materials, fungus, mending
good the surface defects, sand papering the
surface and necessary scaffolding, spreading by
brush/ roller/spray etc. all complete in all floor as
per direction of the engineer-in-charge.
Supply & Works of Wheather coat on out side
wall of approved quality and colour delivered
from authorized local agent of the manufacturer
in a sealed container, made from water based
powder mixed with water (1:1), applying first
coat, curing the same after six hours for 24 hours,
17 second coat applied and curing the same for 7 Sqm 57.00 250.00 14,250.00
(seven) days etc, taking care and cleaning the
surface fully from grease, oily substances, old
paints, lime wash, fungus, algae etc., sand
papering the surface before applying 1st and 2nd
coat, complete as per direction of the engineer-in-
charge.
Supplying, fitting and fixing of Aluminium
sliding window as per the U.S. Architectural
Aluminium Manufacturer’s Association (AAMA)
standard specification having 1.2 mm thick outer
bottom (size 75.50 mm, 32mm), 1.2 mm thick
outer top (size 75.50 mm, 16.80 mm), 1.2 mm
thick shutter top (size 33 mm.26.80, 22 mm), 1.2
mm thick shutter bottom (size 60mm, 24.40 mm),
1.2 mm thick outer side(size 75.50 mm,19.90
mm), 1.2 mm thick sliding fixed side (size 31
mm, 26 mm),1.2 mm thick shutter lock (size
18 49.20 mm 26.20 mm) & 1.2 mm thick inter lock Sqm 4.05 3220.00 13,041.00
(size 34.40 mm, 32.10 mm) sections all
Aluminium members (Total weight kg/sqm) will
be anodized to Aluminium Bronze/Silver color
with a coat not less than 15 micron in thickness
and density of 4 mg per square cm etc. including
all accessories like sliding door key lock, sliding
door wheel, sliding door mohiar, sliding door
neoprene, bolts & nuts in/c sealants, keeping
provision & fitting 5 mm thick Tai glass
including labour charge for fitting of accessories,
making grooves & mending good damages,
carriage, and electricity complete in all respect as
Supplying,
per drawing fitting and fixing
and direction of the window &
engineer-in-
verenda
charge. grills of any design made with 12 x12
19 mm sq bar in/c fabricating, welding cost of Sqm 4.05 2142.00 8,675.10
electricity & tools & plants etc. complete for all
floors as per direction of the engineer-in-charge.
Supplying, fitting and fixing Swing door
(1000*2100,wooden, Single shutter) with
20 necessary accessories, complete in all respect as Sqm 2.10 11,779.00 24,735.90
per approved drawing specification and accepted
by the Engineer-in-charge.
Supplying, fitting and fixing Swing door
(750*2100,pvc, Single shutter) with necessary
21 accessories, complete in all respect as per Sqm 1.58 6,194.94 9,757.03
approved drawing specification and accepted by
the Engineer-in-charge.
Supplying, fitting and fixing Poly vinyl
chloride ceiling (PVC) board ceiling of 9 mm
thick board laminated by mechanical hot press
with a milk white PVC membrane with
Aluminium T-bar frame in natural anodized
finish at 600 x 600 mm in grid suspended from
22 ceiling by 12 SWG double ply wire fixed to the sqm 2.10 2,130.00 4,473.00
ceiling by rowel plug, screws, hooks, nails etc.
maintaining straight lines and desired finished
level a bottom face with vertical wooden strut as
required including making holes in slab

LIME TERRACING
(2:2:7=LIME:SHURKI:75MM DOWN BRICK
CHIPS), MINIMUM THICKNESS SHALL BE
25MM AT THE LOWER POINT OF THE
ROOF WITH A SLOPE OF 1:50, THE
TOP OF THE TERRACING SHALL BE
COVERED WITH LAYER OF BITUMINOUS
PAINT
,sueki from 1st class brick and minimum lime
content 500kg per 2.83 cubic meter (stone lime
brounght at site ,not being pownered in open air
and to be slaked on presence of engineer-in-
charge and to be measured in volume three days
after slaking for using in the mix)in the
proportion 7:2:2(brick chip:surki:lime)including
preparation of the mix on the ground by making a
23 suitable platform under proper polythene sqm 18.00 325.00 5,850.00
cover,cutting the mix twice daily with limewater
(1:10)at least for 7 days until the mix attain
desirable consisttency laying the mix in proper
slope ,beating the same with standard "koppa"for
minimum 7 days to gain maximum
consoildation ,making ghoondy and neat
finishing with lime surki mortar (1:2)and curing
for 21 days providing polythene cover after each
day work and cleaning etc.complete in all respect
accepted by the enginner-in-charge.

Supply,installation and commisioning of


lighting System (including lamps, wires, buried
pipes, Switch & socket etc.) complete in all
24 respect as per design & direction of the engineer- sqm 10.00 2,700.00 27,000.00
in-charge. (Calculate according to the floor area
of the control building)

TOTAL COST 377,495.14


Price Offer For Brahmanbaria AIS Subtation
Client :BANGLADESH POWER DEVELOPMENT BOARD (BP
ABSTRACT COST OF CIVIL WORKS OF Boundary wa
SECTION - 5
SL Description Unit Quantity

Boundary wall Height 1.8~2.8 mm , Brick &


concrete mixing structure , RCC Foundation
including earthwork;
decorate : 12MM THICK CEMENT PLASTER
A WITH NEAT CEMENT FINISHING
(N..C.F.) ; 1 SEALER COAT PLUS , all complete
in accordance with approved drawings and accepted
by the Engineer.

Earth work in excavation of all kinds of soils of


foundation trenches including leveling, ramming and
preparing the base, bailing out water and shoring if
necessary, providing centre line and bench mark
1 pillars, removing the spoils etc. to a lead not Cum 128.00
exceeding 60m. all complete as per direction of the
Engineer in charge.

Earth filling in foundation trenches and plinth in


150 mm layer with earth available within 90 m of the
building site, watering, leveling and consolidating
2 each layer up to finished level etc. all complete as per Cum 128.00
direction of the engineer-in-charge.
Mass concrete (1:3:6) in foundation or floor with
cement, sand (F.M. 1.2) and picked jhama chips
including breaking chips, screening, mixing, laying,
compacting to levels and curing for at least 7 days
including the supply of water, electricity and other
3 Cum 6.00
charges and costs of tools and plants etc. all complete
and accepted by the Engineer. (Cement: CEM-II/A-
M).

Providng and laying double layer polythene sheet


weighing 1.00kg per 6.5 sqm under pile cap and pit
4 bottom slab etc. all complete as per direction of EIC. Sqm 230.00

Reinforcement cement concrete works , having


specified compressive strength f'c 22 Mpa at 28 days
on standard cylinder , with with cement
(Scan/Fresh) confirming to BDS 232 & ASTM
standard , best quality coarse sand , 20 mm down
well graded crushed stone chips including breaking
chips and screening through proper sieves , making ,
placing in position the centering and shuttering ,
making shuttering water tight , placing of
reinforcement in ,position; concrete mixing with
5 mixer machine , casting in forms , compacting by
vibrator machine and curing at least for 28 days ,
removing centering shuttering etc. all complete
including cost of water , electricity , testing of
materials and and concrete & other charges as per
direction of the engineer in charge .

a) Footing (1:1.5:3) using Stone chips Cum 19.54


b) Column (1:1.5:3) using Stone chips Cum 11.16
c) Beam (1:1.5:3) using Stone chips Cum 5.90
d) Coping (1:1.5:3) using Stone chips Cum 2.87
Supplying, fabrication and fixing to details as per
design M.S deformed bar as reinforcement of
required size and length for all types of RCC work
in/c straightening the rod, removing rusts, cleaning,
cutting, hooking, bending, binding with 22 B.W.G.
GI wire, placing the bars in position, in/c lapping,
spacing and securing them in position by concrete
6 blocks, metal chairs, etc. complete as per
specifications, drawings and direction of the
Engineer-in-charge.

60 grade (GPH/ AKS/KSRM) deformed bar with


minimum fy = 412 Mpa Kg 4000.00
Formwork/shuttering (wooden) The formwork
must be rigid enough both in and out of plane, to
make the concrete surface true to the designed
shape and size, along with prop and necessary
supports etc. all complete approved and accepted
7 sqm 228.57
by the Engineer. and removal of form after
hardening of the concrete & the concrete strength
meets the design and specification requirements.
The formwork support design and calculation
shall be submitted to the engineer for review in
advance before
Supplying, construction
fitting andØ construction
and fixing of 100 L=225mmin
8 accordance
PVC Pipe inwith the approved
the retaining wall design. nos 32.00

125 mm thick brick work


inside RCC frame with 1st class bricks in cement
mortar (1:4) including filling the interstices with
9 mortar, racking out joints, cleaning and soaking the sqm 103.33
bricks before use, curing for at least 7 days etc.
complete as per direction of the Engineer-in-charge.
Decorate of brickwall:
12MM THICK CEMENT PLASTER WITH NEAT
CEMENT FINISHING (N..C.F.) ;
10 sqm 206.67
1 SEALER COAT PLUS 2 FINISHING COATS OF
approved colored weather coat

Decorate of RCC frame:


6MM THICK CEMENT PLASTER WITH NEAT
CEMENT FINISHING(N..C.F.) ;
11 1 SEALER COAT PLUS 2 FINISHING COATS OF sqm 173.97
approved colored weather coat

MS L38X38X6mm with 12 BWG Barbed wire


12 spacing @ 150mm C/C both Horizontal & Vertical sqm 45.00
intalled in the top of boundary wall
Expansion joint (Wide: 25 mm,provided with double
13 culomn from bottom of Retaining wall to the top of m 8.00
Boundary wall, Bituminous hemp caulking)

B) Demolish part

Demolish, transporting & disposing of Existing old


Boundary wall ,,as per drawing and direction of the
engineer-in-charge, all complete approved and
1 accepted by the Engineer. m 75.00

Remove the old painting of existing Boundary wall


2 and renevate the existing Boundary wall sqm 100.00
TOTAL COST =
anbaria AIS Subtation
DEVELOPMENT BOARD (BPDB)
L WORKS OF Boundary wall
ON - 5
Rate in Taka Total Amount Remarks

220.00 28,160.00

140.00 17,920.00
5,000.00 30,000.00

40.00 9,200.00

9,000.00 175,824.00
9,000.00 100,440.00
9,000.00 53,142.48
9,000.00 25,833.15
-

75.00 300,000.00

300.00 68,570.04

450.00 14,400.00

800.00 82,666.08
850.00 175,665.42

850.00 147,877.73

900.00 40,500.00

450.00 3,600.00

1,800.00 135,000.00

2,200.00 220,000.00
TOTAL COST = 1,628,798.90