1 Demolition Works:
a Excavation
excavate to reduce levels for Service Block & other foundations for
i 93.6 Cu.m 35 3,276
boundary wall Foundations.
b Back Filling
filling with 250mm thk. Road Base -Service Block & other foundations for
i 19.5 Cu.m 196 3,822
boundary wall Foundations.
c Compaction
Compaction Works till 95% of MDD for All Excavated Areas & under
i 78 Sq.m 35 2,730
Slab on Grade
3 SUBSTRUCTURE WORKS
b 100mm thick blinding for boundary wall Footings 7 Cu.m 560 3,640
4 MASONRY WORKS
a 200mm thick Solid Block Work for super structure 59 Sq.m 149 8,717
200mm thick Hollow concrete masonry units bedded in mortar including
b 195 Sq.m 129 25,155
reinforcement and anchoring where necessary
d Bittuman paint production coat for below earth super structure. 65 RM 26 1,690
5 WALL FINISHES
a Plaster