Strengthening work at Sector -63 Noida

S.No. Description Unit Qty Rate Amount Rs.

A Column Jacketing Work

Scaffolding : Providing and erecting self support


steel scaffolding double row type using steel pipes
for vertical horizontal etc wherever so as to make it
1 Sqm 1 200 200
rigid frame complete in all respect including
removing of scaffolding as per direction of E-I-C.

Chipping : Chipping of unsound weak concrete


over slab, column, beams and walls or as per site
2 requirement by chiseling and preparation of Sqm 1 150 150
surface with the held of grinding machine.

Reinforcement Steel : Providing and Laying high


yield strength Thermo- mechanically treated bars
for reinforcement RCC work including
3 straightening, cutting, bending and placing in Kg 1 85 85
position, binding with 18 gauge annealed steel
wire and cost of binding wire complete.

Providing leak-proof shuttering/formwork using


plywood with necessary supports/scaffolding to
4 pour concrete for the damaged RCC beam,column Sqm 1 650 650
and slab.Including shuttering Oil & nails at any
height
Providing, mixing and applying epoxy bonding coat
on chipped portion of RCC for micro concrete/new
5 concrete as per manufactures specifications and Sqm 1 450 450
direction of Engineer-in-charge complete in all
respects.
Micro Concrete : Providing, mixing and placing in
position cement based, non-shrink free flow micro-
concrete as per manufacturer specification in
6 Cum 1.0 42000 42 000
beams, columns. (Aggretates shall be restricted to
25 % maximum and 6mm & down aggregates shall
be used)
Rebaring : Introducing new reinforcement bars for
structural connections in RCC, including power
drilling holes of appropriate diameters in reinforced
or plain cement concrete to a minimum depth as
per drawings and as per manufacturer
specification, fixing the reinforcement in position
7 using Hilti HY-500 / FISV 360S chemical or
equivalent (Rate shall include cost of labour, T & P
for power drilling in concrete, epoxy cartridges,
plastic nozzle etc complete including cleaning the
drilled holes of loose dust by blowing air. (The cost
of reinforcement shall be payable separately)

a 8 mm dia x 80 mm depth Nos 1 70 70


b 10 mm dia x 100 mm depth Nos 1 90 90
c 12 mm dia x 120 mm depth Nos 1 135 135

Page 1 of 3
Strengthening work at Sector -63 Noida

S.No. Description Unit Qty Rate Amount Rs.


d 16 mm dia x 160 mm depth Nos 1 270 270
e 20 mm dia x 200 mm depth Nos 1 480 480
f 25 mm dia x 250 mm depth Nos 1 950 950
Curing Compound : Providing and applying water
based curring compound on the RCC surface
8 Sqm 1 150 150
after of form work ( Sika make Antisol EWP or
equivalent)

Total [ A ] 45 680

B Carbon Wrapping Work (FRP)


Carbon Fiber Wrapping (Single Layer) :
Providing & applying carbon Fiber 430GSM
reinforcement system over existing surface with
the following applications 1. Grinding the surface if
required repair the surface using the polymer
modified mortar (PMM) application 2. Application
of epoxy primer Masterbrace 3500. 3. Application
of epoxy adhesive Masterbrace 4500 4.
Application of Single layer of Carbon fiber Master
brace Fib 230/400 430GSM as per the direction of
1 structural engineer/consultant in accordance with Sqm 5.50 5000 27 500
manufacture's specifications including application
of laminating roller until the resin is squeezed out
between the ravings 5. Application of second coat
of epoxy adhesive Masterbrace 4500. The rates
shall include final application of bond coat with 6
mm down aggregate and sprinkling as to receive
the protective plaster. (Overlap of carbon fiber
sheet shall be measured for payment) (Material
Make BASF/SIKA)

Nozzle Fixing:
Drilling holes inside the damaged or honeycombed
concrete are at spacing mentioned in drawing or
as per guidance of E.I.C. Cleaning the holes by air
blower or jet of water.Insert NRV (12mm) nipples
2 into pre-drilled holes and sealing peripherally with Nos 1 80 80
polimer modified mortar and after execution cut
the nozzzle by cut of wheel after completion of
grouting without structural elements and its repair
complete in all respects as per the instruction of
Engineer in charge.

Page 2 of 3
Strengthening work at Sector -63 Noida

S.No. Description Unit Qty Rate Amount Rs.


PU Injection Grout at seepage areas :
Providing and applying Injection grouting using
Sika 202H or equivalent, vinyl metha-acrylate, Low
viscosity, hydro-swelling, thermosetting resin for
crack injection by drilling the hole upto 75-100mm
deep and fixing the nozzles using fast setting
3 Kg 1 1,950 1 950
Randoc Plug - plugging compound or polymer mix
mortar, along the construction joints at a distance
@500mm c/c all in complete as per the directions
of the engineer-in charge and manufacturer’s
specification. (Rates shall exclude the cost of
Fixing of NRV Nozzle for grout)

Total [ B ] 29 530

Total [ A + B ] 75 210

Note : 1) All applicable taxes shall be charged extra.


2) For FRP work minimum qty should be required 50 Sqm. If the quantity less than 50 sqm then
rate should Rs. 10000/- Per Sqm consider.