Strengthening work at Sector -63 Noida
Total [ A ] 45 680
Nozzle Fixing:
Drilling holes inside the damaged or honeycombed
concrete are at spacing mentioned in drawing or
as per guidance of E.I.C. Cleaning the holes by air
blower or jet of water.Insert NRV (12mm) nipples
2 into pre-drilled holes and sealing peripherally with Nos 1 80 80
polimer modified mortar and after execution cut
the nozzzle by cut of wheel after completion of
grouting without structural elements and its repair
complete in all respects as per the instruction of
Engineer in charge.
Page 2 of 3
Strengthening work at Sector -63 Noida
Total [ B ] 29 530
Total [ A + B ] 75 210