NAME OF THE PROJECT PART C-COMPOSITE WORKS OF CNG COCO STATIONS & CNG STATIONS IN OMC ROS for

S for City Gas Distribution Project of GAIL Gas Limited Bengaluru.

MEASUREMENT PERIOD From : 01.07.2020 to 15.11.2020

CONTRACTOR LIKHITHA INFRASTRUCTURE LIMITED LOA NO. GAILGAS/BLR/C&P-1843/5600000496. DTD : 01.03.2019.

ABSTRACT OF PAYMENT FOR COCO CNG STATION HOSKOTE


As per Work Order % of Previous Bill Current bill Cummulative
SOR NO. SAP NO. Description of item RATE OF
PAYME PAYMENT Remarks
QTY UOM RATE AMOUNT NT QTY AMOUNT QTY AMOUNT QTY AMOUNT

PART - I : CIVIL WORKS


CIV-1 CIV-1 Site clerance and earth Work

Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as
well as 10 sqm on plan including disposal of excavated earth for all leads and lifts, Excavated
portion to be neatly rammed, leveled, dressed & compacted to receive bed concrete.Carting away
excess excavated earth / debris as directed by the project manager outside the premises to any
place designated by the local authority from site by mechanical transport.Item also include cutting
and removing of bushes /tress with 30m girth (to be measured at 1.0m above ground) etc.
(Approval of location of disposal from local authority is in scope of contractor.)

CIV-1A CIV-1 All kinds of soil

CIV-1A-(I) All kinds of soil 2250.00 M2 23.00 51750.00 90% 20.70 100.000 2,070.00 - - 100.000 2070.00
Felling of trees of the girth (measured at a height 1 m above ground level ) including cutting of
CIV-2 CIV-2 trunks and branches , removing the roots and stacking of serviceable materials and disposal
unserviceable material.
CIV-2A CIV-2A a) beyond 30 cm Girth upto and including 60 cm girth

CIV-2A-(I) On Completion of Work Including all Supply of 15.00 Each 92.00 1380.00 90% 82.80 1.000 82.80 - - 1.000 82.80

Earthwork in excavation and backfilling in layer of 200mm for foundations of buildings, basements,
pipe supports, equipments, tunnels, trenches,for pipes&sewers&storm water drains, culverts,
manholes, and in plinth etc., in ordinary and hard soils in both dry and wet conditions including
pumping and bailing out surface and subsoil water (dewatering), shoring, strutting, slush removal at all
heights and depths as per drawing and specifications wherever required , and backfilling in foundation pits
CIV-3 CIV-3 and other places with excavated suitable surplus earth, including reclaiming from soil heaps kept
elsewhere and dressing and levelling,watering and mechanical compaction etc.,transporting surplus
unserviceable soil to places within an initial lead of 500m and and spreading in layers as per specifications
or heaping up to any heights and as per the direction of Engineer Incharge. The Measurement for
payment shall be for the theoretical volume only i.e., the volume of the block of the excavation having
maximum bottom dimension of the foundation as per drawing .

(The Contractor shall take into account in his rate the provision for excess excavation for
necessary working space, slope etc., required for excavation and other allied works and refilling
the side slopes and working space as mentioned in the specification).
CIV-3A CIV-3A For depth upto & including 1.50 m

CIV-3A-(I) On Completion of Work Including all Supply of 750.00 M3 175.00 131250.00 90% 157.50 322.274 50,758.16 - - 322.274 50758.16

CIV-3B CIV-3B For depth beyond 1.50 m and upto & including 3.00 m

CIV-3B-(I) On Completion of Work Including all Supply of 225.00 M3 248.00 55800.00 90% 223.20 16.814 3,752.88 - - 16.814 3752.88

CIV-3C CIV-3C Extra for disposal of surplus earth beyond initial lead of 50m upto 5.0KM

CIV-3C-(I) On Completion of Work Including all Supply of 275.00 M3 230.00 63250.00 90% 207.00 480.248 99,411.34 - - 480.248 99411.34 AHR

Supplying and filling in foundation and plinth with river sand under floors for all leads and lifts,
CIV-8A CIV-8A including watering, ramming, consolidating and dressing complete.

CIV-8A-(I) On Completion of Work Including all Supply of 35.00 M3 2766.00 96810.00 90% 2,489.40 1.530 3,808.78 - - 1.530 3808.78 AHR

CEMENT CONCRETE

FOR LIPL Page 1 of 12 FOR GGL


FOR MECON
NAME OF THE PROJECT PART C-COMPOSITE WORKS OF CNG COCO STATIONS & CNG STATIONS IN OMC ROS for City Gas Distribution Project of GAIL Gas Limited Bengaluru.

MEASUREMENT PERIOD From : 01.07.2020 to 15.11.2020

CONTRACTOR LIKHITHA INFRASTRUCTURE LIMITED LOA NO. GAILGAS/BLR/C&P-1843/5600000496. DTD : 01.03.2019.

ABSTRACT OF PAYMENT FOR COCO CNG STATION HOSKOTE


As per Work Order % of Previous Bill Current bill Cummulative
SOR NO. SAP NO. Description of item RATE OF
PAYME PAYMENT Remarks
QTY UOM RATE AMOUNT NT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Supplying and laying plain cement concrete of the following proportions at all leads and lifts in all
levelling courses under foundations, floors, pipelines, trenches, pits etc. using graded stone
CIV-10 CIV-10 aggregate 20 mm max. size and down including by mechanical mixing, transporting, consolidation,
finishing, curing etc. complete, including shuttering, if required, as per specifications, drawings
and instructions of the Engineer Incharge.
CIV-10B CIV-10.B M-10 1:3:6

CIV-10.B-(I) On Completion of Work Including all Supply of 270.00 M3 5994.00 1618380.00 90% 5394.60 82.628 445,745.01 - - 82.628 445745.01

REINFORCED CEMENT CONCRETE


STEEL REINFORCEMENT

Supplying, fabricating and fixing in position TMT steel reinforcements of grade Fe 500 at all levels
and positions, all leads and lifts including the cost of transport, straightening, cutting, bending,
cranking, binding, fixing, tying in position with annealed binding wire, welding provision of
CIV-11 CIV-11 necessary chairs and spacers, including tying and bending dowel bars and their straightening
upon deshuttering (wherever necessary) as per drawings and specifications and including cost of
binding wire, labour, cover blocks in CM 1:2 etc., all complete for reinforced concrete as per
specifications, drawings and instructions of the Engineer Incharge.

a) Reinforcement conforming to Grade Fe-500 of IS : 1786-2008 ( TMT bars from SAIL or


CIV-11A CIV-11.A
equivalent from RINL/TATA STEEL)
CIV-11.A-(I) On Completion of Work Including all Supply of 38.00 TON 69165.00 2628270.00 90% 62248.50 15.386 957,755.42 - - 15.386 957755.42

Supplying and Laying of design mix,Reinforced Cement Concrete of following Grades at all
depths and heights in all types of Foundations, Footings, equipment foundations,columns,
pedestal,wall, lintels, ducts, beams, brackets, slabs of all shapes, sills, parapets,bands and any
CIV-12 CIV-12
other works both in sub and Superstructures all complete with all bye works as per Drawings,
Specification and instruction of Engineer. (The rates shall include the cost of necessary
shuttering but excluding the cost of steel reinforcement)

M-25 Grade Design Mix Concrete using ordinary portland cement (20 mm down graded coarse
CIV-12A CIV-12.A
aggregate.) UPTO PLINTH LEVEL

CIV-12.A-(I) On Completion of Work Including all Supply of 300.00 M3 7377.00 2213100.00 90% 6639.30 88.523 587,730.75 - - 88.523 587730.75
M-25 Grade Design Mix Concrete using ordinary portland cement (20 mm down graded coarse
CIV-12B CIV-12.B
aggregate.) ABOVE PLINTH LEVEL
CIV-12.B-(I) On Completion of Work Including all Supply of 150.00 M3 9222.00 1383300.00 90% 8,299.80 24.879 206,490.72 - - 24.879 206490.72

Providing, constructing and finishing of compound wall in RCC frame structure with
precast RCC wall panels of 100mm thickness mounted on in-situ RCC columns of
400mmx450mm size at an interval of 3.0 m or as specified in construction drawing and
height 3m, with 600 high Y angle frames with Concertina coils and RBT tape as specified as
CIV-13 CIV-13
per scope of work , including plastering, coping, painting, whitewash,concertina coil,
embossing of GAIL GAS logo on all columns, finishes all complete as per technical
specifications, tender drwaing and direction of the Engineer-In-Charge.

CIV-13-(I) On Completion of Work Including all Supply of 180.00 RM 12910.00 2323800.00 90% 11,619.00 55.500 644,854.50 - - 55.500 644854.50
Supplying & Grouting ( including tamping ) for Foundations, Structures, Equipments, Base plates,
Anchor holes etc., with Cement Concrete of the following Grades (includingShuttering wherever
necessary) at all levels and as per Drawings, Specifications and direction of the Engineer in
CIV-14 CIV-14 charge.

CIV-14A CIV-14A a) M-30 Grade Design Mix Concrete,using 12 mm down graded coarse aggregate

CIV-14A-(I) On Completion of Work Including all Supply of 3.00 M3 8760.00 26280.00 90% 7,884.00 0.575 4,533.30 - - 0.575 4533.30

FOR LIPL Page 2 of 12 FOR GGL


FOR MECON
NAME OF THE PROJECT PART C-COMPOSITE WORKS OF CNG COCO STATIONS & CNG STATIONS IN OMC ROS for City Gas Distribution Project of GAIL Gas Limited Bengaluru.

MEASUREMENT PERIOD From : 01.07.2020 to 15.11.2020

CONTRACTOR LIKHITHA INFRASTRUCTURE LIMITED LOA NO. GAILGAS/BLR/C&P-1843/5600000496. DTD : 01.03.2019.

ABSTRACT OF PAYMENT FOR COCO CNG STATION HOSKOTE


As per Work Order % of Previous Bill Current bill Cummulative
SOR NO. SAP NO. Description of item RATE OF
PAYME PAYMENT Remarks
QTY UOM RATE AMOUNT NT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Providing and laying roof screed with M-15 grade concrete (12 mm down graded coarse aggregate)
at all leads and lifts with wooden trowel finish and required slope including mixing of water
CIV-16 CIV-16 proofing compound as per manufacturer's specification, curing etc. (payment for water proofing
compound will be done under relevant item), as per drawings and direction of Engineer Incharge.

CIV-16-A-(I) On Completion of Work Including all Supply of 150.00 M3 461.00 69150.00 90% 414.90 6.151 2,552.05 - - 6.151 2552.05 AHR

CIV-17 CIV-17 CC BLOCK work

a) M-30 Grade Design Mix Concrete,using 12 mm down graded coarse aggregate :Upto
CIV-17A CIV-17.A
plinth level

CIV-17.A-(I) On Completion of Work Including all Supply of 75.00 M3 6455.00 484125.00 90% 5,809.50 5.740 33,346.53 - - 5.740 33346.53

CIV-17B CIV-17.B Upto floor V level

CIV-17.B-(I) On Completion of Work Including all Supply of 90.00 M3 7377.00 663930.00 90% 6,639.30 16.233 107,775.76 - - 16.233 107775.76

Providing and laying paving of pre cast concrete interlocking pavers made of M30 grade concrete
of 80 mm thickness of approved colour combination, pattern make, size, of compressive strength
CIV-23 CIV-23 300KG /sq cm. Paver blocks should be laid on sand cushion as required with a gap of 1.5mm
between the blocks filled with sand including paving and curb gap to be filled with concrete of
same grade of concrete pavers

CIV-23-(I) On Completion of Work Including all Supply of 1110.00 M2 553.00 613830.00 90% 497.70 486.871 242,315.70 - - 486.871 242315.70

Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm
CIV-24 CIV-24 including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per -
the direction of Engineer-In-charge. The cost of structural steel and PCC shall be paid separately.

CIV-24.A Made of G.I. wire of dia 3.1 mm -


CIV-24.A-(I) on completion of work including all supply 180.00 SQM 414.00 74520.00 90% 372.60 - - 67.578 25,179.56 67.578 25,179.56 AHR
Demolishing of Cement Concrete (PCC) of all grades manually/mechanical means including
CIV-25 CIV-25 disposal of debris as directed by the Engineer. Debris shall be disposed outside the site and this
shall be entirly Contractor's responsibility irrespective of any Lead.

CIV-25-(I) On Completion of Work Including all Supply of 38.00 M3 1383.00 52554.00 90% 1,244.70 1.219 1,517.29 - - 1.219 1517.29
a) DEMOLISHING OF RCC OF ALL GRADES MANUALLY/MECHANICAL MEANS INCLUDING
CIV-26 CIV-26
DISPOSAL OF DEBRIS…..
CIV-26-(I) On Completion of Work Including all Supply of 23.00 M3 1844.00 42412.00 90% 1,659.60 0.901 1,495.30 - - 0.901 1495.30

DISMANTLING/DEMOLISHING
Demolishing of CC block work/brick work / stone masonry of all grades manually/
mechanical means including disposal of debris as directed by the Engineer. Debris shall be
CIV-27 CIV-27
disposed outside the site and this shall be entirly Contractor's responsibility irrespective of
any Lead.

CIV-27-(I) On Completion of Work Including all Supply of 38.00 M3 461.00 17518.00 90% 414.90 24.050 9,978.35 - - 24.050 9978.35

SOAK PIT AND SEPTIC TANK

Providing and construction of septic tank in brick masonry and base and top slab in RCC
CIV-29 CIV-29 M25 complete in all respect as per scope of work, detailed construction drawings, technical
specifications and directions of the Engineer-in-charge.

CIV-29-(I) On Completion of Work Including all Supply of 2.00 NOS. 46110.00 92220.00 90% 41,499.00 1.000 41,499.00 - 1.000 41499.00

FOR LIPL Page 3 of 12 FOR GGL


FOR MECON
NAME OF THE PROJECT PART C-COMPOSITE WORKS OF CNG COCO STATIONS & CNG STATIONS IN OMC ROS for City Gas Distribution Project of GAIL Gas Limited Bengaluru.

MEASUREMENT PERIOD From : 01.07.2020 to 15.11.2020

CONTRACTOR LIKHITHA INFRASTRUCTURE LIMITED LOA NO. GAILGAS/BLR/C&P-1843/5600000496. DTD : 01.03.2019.

ABSTRACT OF PAYMENT FOR COCO CNG STATION HOSKOTE


As per Work Order % of Previous Bill Current bill Cummulative
SOR NO. SAP NO. Description of item RATE OF
PAYME PAYMENT Remarks
QTY UOM RATE AMOUNT NT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Making soak pit with 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb
CIV-30 CIV-30 shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per
standard design. With class7.5 bricks

CIV-30-(I) On Completion of Work Including all Supply of 2.00 NOS. 46110.00 92220.00 90% 41,499.00 1.000 41,499.00 - - 1.000 41499.00

PART - II : ELECTRICAL WORKS -

SUPPLY
27 27 Galvanised (GI) earth conductor . -
a) E-27-A GI Strip (50X6) mm
E-27-A-(I)S on placement of order 600 Mtr. 207.00 124200.00 5% 10.35 450.000 4,657.50 - - 450.000 4,657.50
E-27-A-(II)S on receipt of material at site 600 Mtr. 207.00 124200.00 65% 134.55 450.000 60,547.50 - - 450.000 60,547.50
E-27-A-(III)S on erection, alignment, welding, grouting, painting, installation, jointing, termination 600 Mtr. 207.00 124200.00 15% 31.05 136.300 4,232.12 27.200 844.56 163.500 5,076.68
E-27-A-(IV)S on testing and commissioning 600 Mtr. 207.00 124200.00 5% 10.35 - - 163.500 1,692.23 163.500 1,692.23
b) E-27-B GI Strip (25X3) mm -
E-27-B- (I)S on placement of order 1890 Mtr. 70.00 132300.00 5% 3.50 147.000 514.50 - - 147.000 514.50
E-27-B- (II)S on receipt of material at site 1890 Mtr. 70.00 132300.00 65% 45.50 147.000 6,688.50 - - 147.000 6,688.50
E-27-B- (III)S on erection, alignment, welding, grouting, painting, installation, jointing, termination 1890 Mtr. 70.00 132300.00 15% 10.50 86.500 908.25 59.800 627.90 146.300 1,536.15
E-27-B- (IV)S on testing and commissioning 1890 Mtr. 70.00 132300.00 5% 3.50 - - 146.300 512.05 146.300 512.05
Supply of following sizes of class 'B' G.I.Pipe including all material and labour as per
32 -
specification and drawings approved
a) E-32-A 40mm NB -
E-32-A-(I)S on placement of order 150 Mtr. 221.00 33150.00 5% 11.05 150.000 1,657.50 - - 150.000 1,657.50 AHR
E-32-A-(II)S on receipt of material at site 150 Mtr. 221.00 33150.00 65% 143.65 150.000 21,547.50 - - 150.000 21,547.50 AHR
E-32-A-(III)S on erection, alignment, welding, grouting, painting, installation, jointing, termination 150 Mtr. 221.00 33150.00 15% 33.15 149.400 4,952.61 0.600 19.89 150.000 4,972.50 AHR
E-32-A-(IV)S on testing and commissioning 150 Mtr. 221.00 33150.00 5% 11.05 - 150.000 1,657.50 150.000 1,657.50 AHR
b) E-32-B 50 mm NB -
E-32-B-(I)S on placement of order 1500 Mtr. 276.00 414000.00 5% 13.80 204.000 2,815.20 30.000 414.00 234.000 3,229.20
E-32-B-(II)S on receipt of material at site 1500 Mtr. 276.00 414000.00 65% 179.40 204.000 36,597.60 30.000 5,382.00 234.000 41,979.60
E-32-B-(III)S on erection, alignment, welding, grouting, painting, installation, jointing, termination 1500 Mtr. 276.00 414000.00 15% 41.40 204.000 8,445.60 30.000 1,242.00 234.000 9,687.60
E-32-B-(IV)S on testing and commissioning 1500 Mtr. 276.00 414000.00 5% 13.80 - - 234.000 3,229.20 234.000 3,229.20
c) E-32-C 80 mm NB -
E-32-C-(I)S on placement of order 600 Mtr. 507.00 304200.00 5% 25.35 12.000 304.20 - - 12.000 304.20
E-32-C-(II)S on receipt of material at site 600 Mtr. 507.00 304200.00 65% 329.55 12.000 3,954.60 - - 12.000 3,954.60
E-32-C-(III)S on erection, alignment, welding, grouting, painting, installation, jointing, termination 600 Mtr. 507.00 304200.00 15% 76.05 7.000 532.35 - - 7.000 532.35
E-32-C-(IV)S on testing and commissioning 600 Mtr. 507.00 304200.00 5% 25.35 - - 7.000 177.45 7.000 177.45
d) E-32-D 100 mm NB -
E-32-D-(I)S on placement of order 60 Mtr. 691.00 41460.00 5% 34.55 18.000 621.90 - - 18.000 621.90
E-32-D-(II)S on receipt of material at site 60 Mtr. 691.00 41460.00 65% 449.15 18.000 8,084.70 - - 18.000 8,084.70
E-32-D-(III)S on erection, alignment, welding, grouting, painting, installation, jointing, termination 60 Mtr. 691.00 41460.00 15% 103.65 15.000 1,554.75 3.000 310.95 18.000 1,865.70
E-32-D-(IV)S on testing and commissioning 60 Mtr. 691.00 41460.00 5% 34.55 - - 18.000 621.90 18.000 621.90

ERECTION
26 E-26 Galvanised (GI) earth conductor . - -

FOR LIPL Page 4 of 12 FOR GGL


FOR MECON
NAME OF THE PROJECT PART C-COMPOSITE WORKS OF CNG COCO STATIONS & CNG STATIONS IN OMC ROS for City Gas Distribution Project of GAIL Gas Limited Bengaluru.

MEASUREMENT PERIOD From : 01.07.2020 to 15.11.2020

CONTRACTOR LIKHITHA INFRASTRUCTURE LIMITED LOA NO. GAILGAS/BLR/C&P-1843/5600000496. DTD : 01.03.2019.

ABSTRACT OF PAYMENT FOR COCO CNG STATION HOSKOTE


As per Work Order % of Previous Bill Current bill Cummulative
SOR NO. SAP NO. Description of item RATE OF
PAYME PAYMENT Remarks
QTY UOM RATE AMOUNT NT QTY AMOUNT QTY AMOUNT QTY AMOUNT

a) E-26-A GI Strip (50X6) mm -

E-26-A-(I)E on completion of installation 1800 Mtr. 110.00 198000.00 80% 88.00 - - 163.500 14,388.00 163.500 14,388.00 AHR

E-26-A-(II)E on testing. 1800 Mtr. 110.00 198000.00 10% 11.00 - - 163.500 1,798.50 163.500 1,798.50 AHR

b) E-26-B GI Strip (25X3) mm

E-26-B- (I)E on completion of installation 3690 Mtr. 55.00 202950.00 80% 44.00 - - 146.300 6,437.20 146.300 6,437.20 AHR

E-26-B- (II)E on testing. 3690 Mtr. 55.00 202950.00 10% 5.50 - - 146.300 804.65 146.300 804.65 AHR
Installation of following sizes of class 'B' G.I.Pipe including all material and labour as per
31 E-31 specification and drawings approved
-

a) E-31-A 40mm NB -
E-31-A-(I)E on completion of installation 450 Mtr. 69.00 31050.00 80% 55.20 - - 172.100 9,499.92 172.100 9,499.92
E-31-A-(II)E on testing. 450 Mtr. 69.00 31050.00 10% 6.90 - - 172.100 1,187.49 172.100 1,187.49
b) E-31-B 50 mm NB -
E-31-B-(I)E on completion of installation 4500 Mtr. 101.00 454500.00 80% 80.80 - - 234.000 18,907.20 234.000 18,907.20
E-31-B-(II)E on testing. 4500 Mtr. 101.00 454500.00 10% 10.10 - - 234.000 2,363.40 234.000 2,363.40
c) E-31-C 80 mm NB -
E-31-C-(I)E on completion of installation 1800 Mtr. 138.00 248400.00 80% 110.40 - - 7.000 772.80 7.000 772.80
E-31-C-(II)E on testing. 1800 Mtr. 138.00 248400.00 10% 13.80 - - 7.000 96.60 7.000 96.60
d) E-31-D 100 mm NB -
E-31-D-(I)E on completion of installation 180 Mtr. 221.00 39780.00 80% 176.80 - - 18.000 3,182.40 18.000 3,182.40
E-31-D-(II)E on testing. 180 Mtr. 221.00 39780.00 10% 22.10 - - 18.000 397.80 18.000 397.80

PART - V : STEEL STRUCTURAL WORKS

ST-3 ST-3 Providing and fixing Fencing Gates


Supplying, fabricating & fixing fencing gates fabricated from pipes conforming to IS:1161 and
plates conforming to IS:2062 & fixing of GI weldmesh made from 3mm GI wire @ 75 mm
bothways to structural steel frame by means of welding/bolting, painting with enamel paint in
approved shade including supply of all raw materials, bolts, electrodes, transportation etc
complete as per enclosed sketch, technical specifications and directions of the Engineer-In-
Charge.

ST-3-A 4m Wide x 2.1m High

ST-3-A-(I) On Supply and Acceptance of Material at SI 8.00 Nos. 64554.00 516432.00 45% 29,049.30 1.000 29,049.30 - - 1.000 29049.30 AHR
ST-3-A-(II) on fabrication, erection, alignment, welding, painting 8.00 Nos. 64554.00 516432.00 45% 29,049.30 1.000 29,049.30 - - 1.000 29049.30 AHR
ST-3-B 1m Wide x 2.1m High

ST-3-B-(I) On Supply and Acceptance of Material at SI 8.00 Nos. 64554.00 516432.00 45% 29,049.30 2.000 58,098.60 - - 2.000 58098.60
ST-3-B-(II) on fabrication, erection, alignment, welding, painting 8.00 Nos. 64554.00 516432.00 45% 29,049.30 2.000 58,098.60 - - 2.000 58098.60
ST-4 ST-4 Providing and Fixing 6 O/P Chequered Plate Covers
Providing and fixing chequered plate in approved panel or over steel structure including cutting,
welding, hoisting, fixing in position, and applying two or more coats of approved quality synthetic
enamel over a priming coat of approved steel primer etc complete as per scope detailed
drawings , technical specifications and directions of the Engineer-In-Charge.

ST-4-(I) On Supply and Acceptance of Material at SI 1400.00 kgs 166.17 232638.00 45% 74.78 756.798 56,593.35 - - 756.798 56593.35
ST-4-(II) on fabrication, erection, alignment, welding, painting 1400.00 kgs 166.17 232638.00 45% 74.78 756.798 56,593.35 - - 756.798 56593.35
PART - V : ARCHITECTURAL WORKS

FOR LIPL Page 5 of 12 FOR GGL


FOR MECON
NAME OF THE PROJECT PART C-COMPOSITE WORKS OF CNG COCO STATIONS & CNG STATIONS IN OMC ROS for City Gas Distribution Project of GAIL Gas Limited Bengaluru.

MEASUREMENT PERIOD From : 01.07.2020 to 15.11.2020

CONTRACTOR LIKHITHA INFRASTRUCTURE LIMITED LOA NO. GAILGAS/BLR/C&P-1843/5600000496. DTD : 01.03.2019.

ABSTRACT OF PAYMENT FOR COCO CNG STATION HOSKOTE


As per Work Order % of Previous Bill Current bill Cummulative
SOR NO. SAP NO. Description of item RATE OF
PAYME PAYMENT Remarks
QTY UOM RATE AMOUNT NT QTY AMOUNT QTY AMOUNT QTY AMOUNT

FLOORING
Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS:15622 (thickness to be
specified by the manufacturer), of approved make,in all colours, shades except burgundy, bottle
green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados,
over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey
2 AR-2 cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of
matching shade complete.

AR-2- (I) On Comp of Work On Prorate Basis 45 Sqm 1198.00 53910.00 90% 1,078.20 28.470 30,696.35 - - 28.470 30696.35 AHR
Providing and laying rectified Glazed Ceramic floor tiles of size 600x600 mm or more (thickness to
be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in
approved colours, laid on 20 mm thick cement mortar 1:4 (1 Cement: 4 Coarse sand), including
3 AR-3 grouting the joints with white cement and matching pigments etc., complete.

AR-3-(I) On Comp of Work On Prorate Basis 45 Sqm 1106.00 49770.00 90% 995.40 6.720 6,689.09 - - 6.720 6689.09 AHR
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the
manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved
make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand),
4 AR-4 including grouting the joints with white cement and matching pigments etc., complete.Size of Tile
600 x 600 mm

AR-4-(I) On Comp of Work On Prorate Basis 113 Sqm 1198.00 135374.00 90% 1,078.20 27.685 29,849.97 - - 27.685 29849.97
STONE CLADDING WORKS
Providing and fixing granite stone gang saw cut mirror polished and cmachine cut of thickness
18mm for wall lining, dispenser pedestral, platform, counter, stair case etc….
9 AR-9

AR-9-(I) On Comp of Work On Prorate Basis 165 Sqm 922.00 152130.00 90% 829.80 24.885 20,649.57 - - 24.885 20649.57
ROOFING
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS :
13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for
thermal expansion complete with PVC moulded fittings and accessories like Couplers, Tees,
AR-13 Bends, Shoes, PVC pipe clamps & fastner complete in all respects and as directed by Engineer-in-
13 Charge

(i) 110 mm diameter

AR-13-(I) On Comp of Work On Prorate Basis 18 Rm 276.00 4968.00 90% 248.40 23.400 5,812.56 - - 23.400 5812.56
FINISHING
12 mm cement internal plaster on walls of all heights at all levels in perfect line and level
15 AR-15

AR-15-(I) On Comp of Work On Prorate Basis 585 Sqm 322.00 188370.00 90% 289.80 138.391 40,105.71 - - 138.391 40105.71
17 AR-17 6 mm cement plaster of mix :

AR-17-I (i) 1:3 (1 cement : 3 fine sand) in ceiling in perfect line and level at all levels

AR-17-I-(A) On Comp of Work On Prorate Basis 255 Sqm 276.00 70380.00 90% 248.40 36.960 9,180.86 - - 36.960 9180.86
AR-17-II (ii) 15mm thick Cement plaster 1:6 (1Cement : 6 coarse Sand) outer walls

AR-17-II-(A) On Comp of Work On Prorate Basis 28 Sqm 276.00 7728.00 90% 248.40 305.717 75,940.10 - - 305.717 75940.10
DOORS, WINDOWS, STRUCTURAL GLAZING AND FALSE CEILING

FOR LIPL Page 6 of 12 FOR GGL


FOR MECON
NAME OF THE PROJECT PART C-COMPOSITE WORKS OF CNG COCO STATIONS & CNG STATIONS IN OMC ROS for City Gas Distribution Project of GAIL Gas Limited Bengaluru.

MEASUREMENT PERIOD From : 01.07.2020 to 15.11.2020

CONTRACTOR LIKHITHA INFRASTRUCTURE LIMITED LOA NO. GAILGAS/BLR/C&P-1843/5600000496. DTD : 01.03.2019.

ABSTRACT OF PAYMENT FOR COCO CNG STATION HOSKOTE


As per Work Order % of Previous Bill Current bill Cummulative
SOR NO. SAP NO. Description of item RATE OF
PAYME PAYMENT Remarks
QTY UOM RATE AMOUNT NT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Wall painting with premium acrylic emulsion paint, having VOC (Volatile Organic Compound )
content less than 50 grams/ litre, of approved brand and manufacture, including applying two or
more coats wherever required, to achieve even shade and colour for all heights and levels.Item
18 AR-18
includes applying pop putty and one coat of primer.

AR-18-(I) ON Comp of Work On Prorate Basis 765 Sqm 92.00 70380.00 90% 82.80 161.351 13,359.86 - - 161.351 13359.86
Painting with APEX/Wheathershield make exterior paint with one coat of primer and two or more
20 AR-20 coat of approved paint on new work wherever required to achieve even shade and colour for all
heights and levels

AR-20-(I) ON Comp of Work On Prorate Basis 555 Sqm 92.00 51060.00 90% 82.80 468.385 38,782.28 - - 468.385 38782.28
WATER SUPPLY & SANITARY
Providing and fixing PVC water tank of approved make with ISI mark and conforming to IS 12701
and with GI fittings for inlet, outlet, Over flow, scour float valve, connections of required size and
dia. Including connections and hoisting/fixing the same tank on roof and other places at all heights
with all bye-works complete at all leads and lifts as per drawings, specifications and instructions
38 AR-38 of the Engineer Incharge. (Support of tank on brick/RCC/PCC will be paid under relevant items)

a) 1000 litres capacity

AR-38-(I) On Comp of Work On Prorate Basis 2 Nos. 18444.00 36888.00 90% 16,599.60 1.000 16,599.60 - - 1.000 16599.60
Providing and fixing white vitreous china extended wall mounting water closet of size 780x370x690
mm of approved shape including providing & fixing white vitreous china cistern with dual flush
fitting, of flushing capacity 3 litre/ 6 litre (adjustable to 4 litre/ 8 litres), including hydraulic seat
39 AR-39
cover, and cistern fittings, nuts, bolts and gasket etc complete.

AR-39-(I) On Comp of Work On Prorate Basis 2 Each 22132.00 44264.00 90% 19,918.80 2.000 39,837.60 - - 2.000 39837.60 AHR
Supplying and fixing CP brass soap container at all leads and lifts as per drawings, specifications
40 AR-40 and instructions of the Engineer Incharge.

AR-40-(I) On Comp of Work On Prorate Basis 2 Nos. 737.00 1474.00 90% 663.30 2.000 1,326.60 - - 2.000 1326.60 AHR
Providing & Fixing hand dryer automatic ABS body (Electric / Battery operated) with all
41 AR-41 accessories including cutting & making good the walls. (Model - 6910A, 290X163X216mm)

AR-41-(I) On Comp of Work On Prorate Basis 2 Nos. 5533.00 11066.00 90% 4,979.70 2.000 9,959.40 - - 2.000 9959.40 AHR
Supplying, fitting and fixing white glazed vitreous china wash basin of superior quality - HSW No.
10032 model or equivalant with ISI mark and size 550mm x 430mm, having single or double holes
with 15 mm CP brass pillar tap - JAQUAR Continental series No. 011, CP brass chain and plugs,
32mm CP brass waste coupling, PVC flexible waste pipe, 15mm PVC inlet water pipe connection,
CI cantilever brackets embedded in 1:2:4 concrete, 15 mm CP brass angle stopcock - JAQUAR
Continental series No. 053, etc. filling the gaps between basin and wall with white cement etc. all
42 AR-42 complete at all leads and lifts as per drawings, specifications and instructions of the Engineer-In-
charge.

AR-42-(I) On Comp of Work On Prorate Basis 2 Nos. 14755.00 29510.00 90% 13,279.50 2.000 26,559.00 - - 2.000 26559.00
Supplying, fabricating and laying UPVC pipes BS 5255 including collars, bends and specials,
taking out waste water and soil waste from toilets to the nearest gully trap or inspection chamber
including the cost of all material, labour, leads & lifts, transportation, taxes, duties, all as per
43 AR-43 specifications, drawings and directions of the Engineer-In-charge.

AR-43-A a) 75 mm dia

AR-43-A-(I) On Comp of Work On Prorate Basis 8 M 737.00 5896.00 90% 663.30 7.200 4,775.76 - - 7.200 4775.76

FOR LIPL Page 7 of 12 FOR GGL


FOR MECON
NAME OF THE PROJECT PART C-COMPOSITE WORKS OF CNG COCO STATIONS & CNG STATIONS IN OMC ROS for City Gas Distribution Project of GAIL Gas Limited Bengaluru.

MEASUREMENT PERIOD From : 01.07.2020 to 15.11.2020

CONTRACTOR LIKHITHA INFRASTRUCTURE LIMITED LOA NO. GAILGAS/BLR/C&P-1843/5600000496. DTD : 01.03.2019.

ABSTRACT OF PAYMENT FOR COCO CNG STATION HOSKOTE


As per Work Order % of Previous Bill Current bill Cummulative
SOR NO. SAP NO. Description of item RATE OF
PAYME PAYMENT Remarks
QTY UOM RATE AMOUNT NT QTY AMOUNT QTY AMOUNT QTY AMOUNT

AR-43-B b) 110 mm dia

AR-43-B-(I) On Comp of Work On Prorate Basis 38 M 1106.00 42028.00 90% 995.40 11.400 11,347.56 - - 11.400 11347.56
Supply and fixing of Floor trap with SS grating to waste water pipe connection.
44 AR-44

AR-44-(I) 1) 75mm dia of weight not less than 4.8 Kgs.

AR-44-(I)-A On Comp of Work On Prorate Basis 5 Nos. 922.00 4610.00 90% 829.80 2.000 1,659.60 - - 2.000 1659.60
Providing and fixing 15mm CP brass long body bib cock with wall flange - JAQUAR Continental
series No. CON-047KN or equivalant at all leads and lifts as per drawings, specifications and
47 AR-47 instructions of the Engineer-In-charge.

AR-47-(I) On Comp of Work On Prorate Basis 3 Nos. 922.00 2766.00 90% 829.80 2.000 1,659.60 - - 2.000 1659.60
Providing and fixing 15mm CP brass angular stop cock - JAQUAR Continental series No. CON-
059KN or equivalant at all leads and lifts as per drawings, specifications and instructions of the
49 AR-49
Engineer-In-charge.

AR-49-(I) On Comp of Work On Prorate Basis 3 Nos. 1106.00 3318.00 90% 995.40 4.000 3,981.60 - - 4.000 3981.60
Providing and fixing CP brass health faucet with 8mm dia, 1m long flexible tube and wall hook
with NRV- JAQUAR Allied series No. ALD-CHR-577 or equivalant at all leads and lifts as per
50 AR-50 drawings, specifications and instructions of the Engineer-In-charge.

AR-50-(I) On Comp of Work On Prorate Basis 3 Nos. 2213.00 6639.00 90% 1,991.70 2.000 3,983.40 - - 2.000 3983.40
Providing and fixing recessed toilet paper roll holder including roller white glazed vitreous china,
53 AR-53 HSW No. 40.025 or approved equivalent make

AR-53-(I) On Comp of Work On Prorate Basis 3 Nos. 737.00 2211.00 90% 663.30 2.000 1,326.60 - - 2.000 1326.60 AHR
Providing and fixing CP brass towel rail 600mm long, 20 mm dia with CP brackets fixed to wall with
54 AR-54 SS screws and TW guttas.

AR-54-(I) On Comp of Work On Prorate Basis 3 Nos. 922.00 2766.00 90% 829.80 2.000 1,659.60 - - 2.000 1659.60 AHR
Construction of brick masonry inspection chamber with full bricks, in CM 1:5, provided with a light
duty CI covers conforming to IS:1726, 610 x 455 mm, weight not less than 52 kg, embedding the CI
frame in 100 mm thick RCC top slab, neatly finished including 12mm thick plastering on both
faces in CM 1:6, rounding, float coat of neat cement finish on the inner side, PCC bedding etc., all
complete including excavtion and backfilling, shuttering, painting the frame and cover with two
55 AR-55
coats of approved anti corrosive paint etc., as per specifications and direction of Consultant.

AR-55-I (i) Internal size 450x450

AR-55-I-A On Comp of Work On Prorate Basis 5 Nos. 23055.00 115275.00 90% 20,749.50 2.000 41,499.00 - - 2.000 41499.00 AHR
Providing yard gully trap 150x100mm with CI grating 150 x 150mm and water tight light weight CI
covers conforming to IS:1726 of size 300x300mm including half-brick masonry in CM (1:4)
plastered neatly with CM (1:4) on both faces, 100mm thick PCC bed of mark M-10C, necessary
56 AR-56 excavation, complete as per direction of the Consultant

AR-56-(I) On Comp of Work On Prorate Basis 3 Nos. 16599.00 49797.00 90% 14,939.10 1.000 14,939.10 - - 1.000 14939.10 AHR

FOR LIPL Page 8 of 12 FOR GGL


FOR MECON
NAME OF THE PROJECT PART C-COMPOSITE WORKS OF CNG COCO STATIONS & CNG STATIONS IN OMC ROS for City Gas Distribution Project of GAIL Gas Limited Bengaluru.

MEASUREMENT PERIOD From : 01.07.2020 to 15.11.2020

CONTRACTOR LIKHITHA INFRASTRUCTURE LIMITED LOA NO. GAILGAS/BLR/C&P-1843/5600000496. DTD : 01.03.2019.

ABSTRACT OF PAYMENT FOR COCO CNG STATION HOSKOTE


As per Work Order % of Previous Bill Current bill Cummulative
SOR NO. SAP NO. Description of item RATE OF
PAYME PAYMENT Remarks
QTY UOM RATE AMOUNT NT QTY AMOUNT QTY AMOUNT QTY AMOUNT
Providing and laying in situ seven course water proofing treatment with APP (Atactic poly-
propylene) modified Polymeric memberane over roof consisting of first coat of bitumen primer @
0.40 Kg per sqm, 2nd, 4th & 6th courses of bonding material @ 1.20 Kg/sqm, which shall consist of
blown type bitumen of grade 85/25 conforming to IS : 702, 3rd and 5th layers of roofing membrane
APP modified Polymeric membrane 1.5 mm thick of 2.25 Kg/sqm weight consisting of five layers
prefabricated with centre core as 20 micron HMHDPE film sandwiched on both sides with
polymeric mix and the polymeric mix is protected on both side with 20 micron HMHDPE film. 7th,
58 AR-58 the top most layer shall be finished with brick tiles of class designation 10 grouted with cement
mortar 1:3 (1cement : 3 fine sand) mixed with 2% integral water proofing compound by weight of
cement over a 12 mm layer of cement mortar 1:3 (1 cement : 3 fine sand) and finished neat (item of
laying brick tiles shall be paid for separately).

AR-58-(I) On Comp of Work On Prorate Basis 113 Sq.m 1844.00 208372.00 90% 1,659.60 75.024 124,509.83 - - 75.024 124509.83 AHR

(A) TOTAL 4,521,762.23 101,747.15 4,623,509.38

CHECKED & VERIFIED BY

FOR ALKA INFRA FOR LIL

SIGN:

NAME:

DATE:

FOR LIPL Page 9 of 12 FOR GGL


FOR MECON
NAME OF THE
PROJECT PART A-COMPOSITE WORKS OF CNG COCO STATIONS & CNG STATIONS IN OMC ROS for City Gas Distribution Project of GAIL Gas Limited Bengaluru.

CLIENT GAIL GAS LIMITED MEASUREMENT PERIOD From : 01.04.2019 TO 31.05.2019

CONSULTANT MECON LIMITED INVOICE NO. & DATE LIPL/CMPST/GGL/MEC/19-20/RA-02 DTD : 24.06.2019.

CONTRACTOR LIKHITHA INFRASTRUCTURE PVT LTD LOA NO. GAILGAS/BLR/C&P-1843/5600000494. DTD : 01.03.2019.

ABSTRACT OF PAYMENT FOR STEEL STRUCTURAL WORKS

As per Work Order Previous Bill Current bill Cummulative


% of RATE OF
SOR NO. SAP NO. Description of item PAYMENT PAYMENT Remarks
QTY UOM RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

PART - V : STEEL STRUCTURAL WORKS

ST-1 ST-1 Structural Steel Works for Canopy & Other Allied Structures

Supply of steel consisting of Plates, Rolled steel joists, Channels, Angles, Tubes , Rectangular / Square Hollow
Steel sections, Fascia, Flashings , Rain water pipe & Gutter etc, straightening of raw steel if required .
Preparation of all necessary Fabrication drawings ( Based on MECON Design drawings ) including bill of
materials .The fabrication drgs are to be approved by purchaser
Fabrication of Steel structures as per Fabrication drawings (including preparation of supplementary sketches and
detailed bill of materials ) supply of bolts, nuts, washers , shims, packs, putty, gas, welding electrodes and all other
consumables, as required.
Cleaning and preparation of all steel surfaces by Mechanical Cleaning to St 3 of Swedish Standard for painting ,
Supply and application of One Coat of Primer Paint of Zinc Phosphate in Phenolic Alkyd medium 40 microns
ST-1 ST-1 DFT , Intermediate Primer Coat of Zinc Phosphate in Phenolic Alkyd medium 40 microns DFT, One Coat of
Intermediate Paint of Synthetic MIO ( ie: Micaceous Iron Oxide) 75 microns DFT , supply and application of 2
coats of Finishing paint Synthetic Enamel 25 microns DFT / coat . Finishing Coat shall be applied one Coat
before erection and one coat after erection . The total thickness of paint shall be 205 Microns.
Loading , Transportation and Unloading and Delivery at erection site of all fabricated structures up to height of
about 12 M, erection, alignment and welding of all structures true to line, level, plumb and dimension, including
rectification if any, splicing , site assembly all as per technical specifications and drawings, touch up painting,
including supply of paint, where paint is damaged.

ON SUPPLY & ACCEPTANCE OF


ST-1-(I) 128.00 MT 100000.00 12800000.00 45% 45000.00 0.000 0.00 47.435 2,134,575.00 47.435 2134575.000
MAT. AT S
ON FAB., ERCT. ALIGNT,
ST-1-(II) 128.00 MT 100000.00 12800000.00 45% 45000.00 0.000 0.00 0.000 - 0.000 0.000
WELDING PAINT

ST-1-(III) ON COMP & ACCEPTANCE. 128.00 MT 100000.00 12800000.00 10% 10000.00 0.000 0.00 0.000 - 0.000 0.000

ST-2 ST-2 Structure Steel Works for Miscellaneous Structures like Grating , Handrails , Hoardings etc
Supplying, Fabricating & Erecting in position steel structures fabricated out of MS Girders, channels,
Tees, angle, flats, plate, square hollow sections pipes etc. conforming to IS:2062 and/or from pipes
conforming to IS:1161 for structural purpose for cascade supporting structure, loading/unloading platform,
Gratings for platform, catladder,handrails, hoardings for sinages,Lcv stand, etc. of any size/dia for
required design including cutting, welding, bolting, hoisting, fixing in position, including application of one
ST-2 ST-2 coat of primer at shop and second coat of primer at site after erection and two coats of finishing paint at
site .The work is to be completed in all respect as per specification ,scope of work, detailed construction
drawings and directions of the Engineer-in-charge.

ON SUPPLY & ACCEPTANCE OF


ST-2-(I) 1400.00 Kgs 150.00 210000.00 45% 67.50 0.000 0.00 2301.850 155,374.88 2301.850 155374.875
MAT. AT S
ON FAB., ERCT. ALIGNT,
ST-2-(II) 1400.00 Kgs 150.00 210000.00 45% 67.50 0.000 0.00 0.000 - 0.000 0.000
WELDING PAINT

ST-2-(III) ON COMP & ACCEPTANCE. 1400.00 Kgs 150.00 210000.00 10% 15.00 0.000 0.00 0.000 - 0.000 0.000

GRAND TOTAL 0.000 2,289,949.88 2289949.875

CHECKED & VERIFIED BY

FOR LIPL FOR MECON FOR GGL/TPI

SIGN: SIGN: SIGN:

NAME: NAME: NAME:


DATE: DATE: DATE:
COCO CNG STATION HOSKOTE
Notes:
Certified quantities by MECON/GGL in RA-05 of PART-C (3rd
1 RA for M/s ALKA infra construction and land develophers of
CNG Station Hoskote)

Amount for work done as per PO issued from Head Office is


2 Rupees 20,81,422.41/- (Excluding GST)

Deduction of Rupees 326315.55/- for Interlocking Paver


3 Blocks supplied by LIL vide invoice no. DPT284, Dated:
24.11.2019 of Designer Paving & Tiles Pvt. Ltd.

4 Taxation and advanaces if any can be checked at HO.

For Structural Works rates not included in PO. So we had


5 deducted 13% of our Part-C SOR rates. If any corrections
please let me know.