You are on page 1of 5

Omega Villas (Pvt) Ltd Lahore

Wajid Associates Lahore


Cost Summary Sheet
Ground Floor Duplex Covered Area = 0000 Sft
First Floor Duplex Covered Area = 0000 Sft 3 Marla (Duplex)
Total Duplex Covered Area = 1846 Sft

A- BILL OF QUANTITY-GREY STRUCTURE Date:-


Amount
S.No Description Unit Quantity Rate
(Rs.)
Excavation in any type of soil including compaction of
excavated bed to 95% of M.D.D, stacking of serviceable
and un-serviceable materials separately with in project
1 boundary ,upholding the sides of the excavation,
keeping excavation free from water, Backfill as directed
by the Engineer , as per drawings and all in accordance
with the specifications. Cft 1,583.56 0.00
TERMITE CONTROL
Providing and carrying out termite proofing of approved
chemical as per manufacturer's specifications (F.M.C )
or Equivalent. The work will be done by a pecialist sub-
contractor who will required to give a life time warranty
2 acceptable to the Engineer for this work will be deemed
to cover all works under this item complete in all
respects as pre drawings and in accordance with the
specifications.
a) Bottom and Sides of Excavated area Sft 2,162.64 0.00
b) Under Floor Sft 1,011.62 0.00
SAND FILLING
Supplying / filling local ravi sand i/c watering &
Compaction from approved outside sources of all leads
and lifts including, digging, loading and unloading and
filling. including watering and consolidation by
ramming in layers with compaction, (compacted
3 measurement), as per drawings and all in accordance
with the specifications.

a) Under Foundation 2" thick Cft 0.00


b) Under Floor 6" thick Cft 579.43 0.00
LEAN CEMENT CONCRETE (1:4:8)
Providing and Laying P.C.C. (1:4:8) Machine Mixed
using Bajar (Sargodha), approved local sand including
4 leveling, compacting and curing, in foundations etc.
complete in all respects as per drawings and in
accordance with the specifications.
a) Under Stair & Foundation 6" thick Cft 403.81
0.00
Omega Villas (Pvt) Ltd Lahore
Wajid Associates Lahore
Cost Summary Sheet
Ground Floor Duplex Covered Area = 0000 Sft
First Floor Duplex Covered Area = 0000 Sft 3 Marla (Duplex)
Total Duplex Covered Area = 1846 Sft

A- BILL OF QUANTITY-GREY STRUCTURE Date:-


Amount
S.No Description Unit Quantity Rate
(Rs.)
BRICK MASONRY IN SUB STRUCTURE

Providing and laying first class solid standard burnt


brick masonry set in cement mortar 1:6 in straight or
curved walls including! scaffolding, raking out joints
5
and curing etc. complete in all respects per drawings,
Technical Provisions and or as directed by the Engineer
Incharge (prior approval of Bricks,Sand and Cement
quality is must).
Cft 1,862.44 0.00
DAMP PROOF COURSE-HORIZENTAL

Providing and laying 2" thick damp proof course with


cement concrete 1:1.5:3 cast in situ using graded
6 screened bajri of ¾ inches and down gauge (Sargodha
Washed) and cleaned sand with 5% pudlo powder
including compacting, curing, forms work and its
removal etc.
Sft 287.73 0.00
DAMP PROOF COURSE-VERTICAL

Providing and laying 2" thick damp proof course with


cement concrete 1:1.5:3 cast in situ using graded
7 screened bajri of ¾ inches and down gauge (Sargodha
Washed) and cleaned sand with 5% pudlo powder
including compacting, curing, forms work and its
removal etc.
Sft 184.44 0.00
GHASSU FILLING

Supplying / filling ghassu (without Clay lumps/Particles)


under floor from approved outside sources of all leads
and lifts including, digging, loading and unloading and
8 filling. including watering and consolidation by
ramming in layers with compaction, (compacted
measurement), as per drawings and all in accordance
with the specifications.
Cft 8,475.49 0.00
Omega Villas (Pvt) Ltd Lahore
Wajid Associates Lahore
Cost Summary Sheet
Ground Floor Duplex Covered Area = 0000 Sft
First Floor Duplex Covered Area = 0000 Sft 3 Marla (Duplex)
Total Duplex Covered Area = 1846 Sft

A- BILL OF QUANTITY-GREY STRUCTURE Date:-


Amount
S.No Description Unit Quantity Rate
(Rs.)
BRICK MASONRY IN SUPER STRUCTURE

Providing and laying first class solid standard burnt


brick masonry set in cement mortar 1:6 in straight or
9 curved walls including! scaffolding, raking out joints
and curing etc. complete in all respects as per drawings,
Technical Provisions and or as directed by incharge
(prior approval of Bricks,Sand and Cement quality is
must).
Cft 2,739.00 0.00
R.C.C CONCRETE (1:2:4)
Providing and laying reinforced cement concrete cast in-
situ having 3000 psi cylinder strength using screened
graded washed Sargodha crushed aggregate 3/4" down,
approved Ravi Sand & Chanab 50% including vibrating,
curing, Water tight Steel Form Work and its removal but
excluding cost of reinforcement complete in all respects
10 as per drawings and in accordance with the
specifications.

a) Beams & Slab 5" thick & Lintels & Shades Cft 873.25 0.00
b) Parapet Wall Cft 254.96 0.00
c) Stair with Foundation Cft 242.52 0.00
d) Kitchen Shelfs Cft 14.19 0.00

STRUCTURAL STEEL / REINFORCEMENT


Providing and laying reinforcement bars including
the cost of straightening, cutting, bending, binding,
wastage, and such overlaps as are not shown in the
drawings, placing in position on cement Concrete
11 1:2:4 precast spacer or M.s. chairs and tying with
binding wire etc.complete in all respects as per
drawings and in accordance with the specifications. :-
(Horizontal and Vertical members) Deformed bars
Grade - 40 (40000 PSI) Model Steel or Equivalent
Kg 2,648.00 0.00
Omega Villas (Pvt) Ltd Lahore
Wajid Associates Lahore
Cost Summary Sheet
Ground Floor Duplex Covered Area = 0000 Sft
First Floor Duplex Covered Area = 0000 Sft 3 Marla (Duplex)
Total Duplex Covered Area = 1846 Sft

A- BILL OF QUANTITY-GREY STRUCTURE Date:-


Amount
S.No Description Unit Quantity Rate
(Rs.)
INTERNAL PLASTER
Providing and applying 1/2" to 3/4" thick cement Sand
(Cleaned/Screened) plaster 1:4 on internal sides of
walls, columns, beams exposed concrete surfaces
including nicking of concrete surface, making edges,
12 corners, grooves, 22 SWG expanded metal 9" wide over
brick masonry and concrete joints, curing and
scaffolding etc. complete in all respect as per drawings
and in accordance with the specifications.(in
Plumb/Right angle)
Sft 5,267.15 0.00
CEILING PLASTER
Providing and applying 3/8" to 1/2" thick cement Sand
(Cleaned/Screened) plaster 1:3 on ceiling, sides and
13 soffit of beams, etc. including making edges, corners,
grooves, curing, and scaffolding complete in all respect
as per drawings and in accordance with the
specifications.in Straight Edge
Sft 1,541.76 0.00
EXTERNAL PLASTER

Providing and applying 1/2" to 3/4" thick cement


Sand (Cleaned/Screened) plaster 1:4 on external sides
of walls, concrete, parapet etc. including making edges,
14 corners, grooves, 22 SWG expanded metal 9"
wide over brick masonry and concrete joints, curing
and scaffolding etc. at any height as directed by
Engineer Incharge. in Plumb & Right angle

Sft 1,945.45 0.00


BRICK BALLAST
Providing and laying watering and ramming 3" to
6" thick brick ballast (Hard) 1-1/2" to 2" . complete
15 in all respect as per drawings,Technical Provisions
and or as directed by the Engineer Incharge.
a) Under Floor 3" to 9" thick Cft 758.47 0.00
Omega Villas (Pvt) Ltd Lahore
Wajid Associates Lahore
Cost Summary Sheet
Ground Floor Duplex Covered Area = 0000 Sft
First Floor Duplex Covered Area = 0000 Sft 3 Marla (Duplex)
Total Duplex Covered Area = 1846 Sft

A- BILL OF QUANTITY-GREY STRUCTURE Date:-


Amount
S.No Description Unit Quantity Rate
(Rs.)
P.C.C.(1:2:4) 2" THICK
Providing and laying Cement Concrete (1:2:4) 2" thick
under Floor using screened, wahed,graded crushed
aggregate 3/4" down (Sargodha) , approved local sand
(Cleaned/Screened) including leveling, compacting and
16
curing, etc. complete in all respects as per drawings and
in accordance with the specifications.

a) Under Floor Sft 1,875.03 0.00


ROOF WATER PROOFING
Providing and Laying Roof waterproofing system
consisting of 2 caot of hot bitumen, 1 Layer of polythene
17 sheet,4" thick Mud, Brick Tile size 9"x4.5"x1.5" with
1/2" to 3/4" mortor backing, complete in all respect as
per drawings and in accordance with the specifications.

Sft 606.42 0.00


18 Khuras on roof (P.C.C 1:2:4) 2'x2'x6" (600 x 600 x 150
mm) Each 2 0.00
ELECTRICAL WORK
19 Electrical Pipe Conduting(Popular or Equivalent) as per
drawing/Design
L.S 2 0.00
PLUMBING WORK
Plumbing Work Include Sewerage and Water Supply
20 Pipes, etc(Popular or Equivalent) as per
Drawing/Design.
L.S 2 0.00
SEPTIC TANK
Septic Tank, Size: 7'-9" x 5'-0" x 5'-0" high including
21 Manholes as per Drawing/Design and Standard
Specifications.
Item 2 0.00
OVERHEAD WATER TANK
22 Tank, Size: 5'-0" x 5'-0" x 5'-0" high (Popular)
L.S 2 0.00

Total Amount (Rs.) -

Per Sft 0.00