You are on page 1of 37

Project: Hotel Eastern Nepal Pvt. Ltd.

Location: Dhulabari , Jhapa


BOQ (Foundation to below plinth tie level)
Hotel Building
SN. DESCRIPTION Rate Unit
Quantity

1 SITE PREPARATION
Preparation of site including leveling ground , cutting trees, removing
away bushes, remains of old building like concrete by chipping,
removing loose earth, soil and brick- bats etc. Before and After Job 1.00
completion,as per direction, specification and instruction of the Site
engineer, all complete .
2 EARTH WORK IN EXCAVATION
Earth work in excavation in foundation including lift up to 1.5m
timbering, pumping out water from the foundation trench, stacking the
soil 1.5 m. minimum from the edge of the foundation trench, back
filling the excavated soil with clean and grub of soil up to a lead of cft 84,068.33
10m. as per direction, specification and instruction of the Site
engineer, all complete.

3 SOIL BACKFILLING
Back filling the excavated soil with clean and grub of soil up to a lead
of 10m. as per direction, specification and instruction of the Site cft 25,220.50
engineer, all complete.
4 BOULDER SOLING
Providing and laying, stone in floor and foundation as per direction,
cft 8,351.53
specification and instruction of the Site engineer, all complete.
5 PLAIN CEMENT CONCRETE

Providing and laying, plain cement concrete in foundation and floor


with cement, sand and stone ballast 19 mm. Gauge including mixing,
laying in panels providing proper slopes, lines and level and curing, as
per drawing, specification and instructions of the Site Engineer.

a) P.C.C.of (1:3:6) mix cft 2,087.87


b) P.C.C.of (1:2:4) mix for plinth floor
8 P.C.C. FOR R.C.C.

Providing and laying, plain cement concrete for R.C.C. columns,


beams, slabs, lintels, columns footings, and all kinds of R.C.C. works
with cement, sand and stone ballast 19 mm gauge including mixing,
laying, curing finishing etc. excluding reinforcement, centering and
shuttering as per drawings, specification and instruction of the Site
Engineer, all complete.

a) P.C.C.of M20 (1:1.5:3) mix cft 29,037.86


b) P.C.C.of M25 (1:1:2) mix
9 STEEL REINFORCEMENT

Providing and laying, steel reinforcement bar Fe 500 grade including


straightening, cleaning, cutting, bending, binding with 20 SWG
kg 112,135.08
annealed tying wire and fixing in positions as per drawings,
specifications and instructions of the Site Engineer, all complete.

10 FORMWORK
Hotel Building
SN. DESCRIPTION Rate Unit
Quantity

Providing and laying, centering and shuttering with approved materials


for all kinds RCC works including all necessary mild steel propping,
sft 14,086.66
scaffolding, staging, supporting, etc. all complete net as per drawings,
specifications and instructions of the Site Engineer, all complete.

TOTAL AMOUNT (Nrs.)=


Foundation to below plinth tie level)
Hotel Building

Amount

-
Hotel Building

Amount

-
Detail Estimate for Civil Works
Summary

S.N. Description No. Quantity Units Quantity Units


(ft) (m)
1 SITE PREPARATION LS LS

2 EARTH WORK IN EXCAVATION 1 84068.33 cf 2380.20 cum.

3 SOIL FILLING 1 25220.50 cf 714.06 cum.

4 BOULDER SOLING 1 8351.53 cf 236.45 cum.

5 PLAIN CEMENT CONCRETE


a) P.C.C.of (1:3:6) mix 1 2087.87 cf 59.11 cum.

6 P.C.C. FOR R.C.C.


P.C.C.of M20 1 29037.86 cf 822.14 cum.

7 STEEL REINFORCEMENT 1 112135.08 kg 112135.08 kg

8 FORMWORK 1 14086.66 sf 1308.56 sqm


Detail Estimate for Foundation Works
S.N. DESCRIPTION NO LENGTH BREADTH HEIGHT QUANTITY REMARKS

1.00 EARTHWORK EXCAVATION

a) TRENCH
i) raf 1.00 144.25 37.66 10.08 54,759.14
ii) raf 1.00 130.16 21.66 10.08 28,418.19
iii) lif pit 1.00 18.00 9.00 5.50 891.00
84,068.33 CFT
2 SOIL BACKFILLING
backfilling 1 25,220.50 CFT

3 BOULDER SOLING
i) raf 1.00 142.25 36.66 1.00 5,214.88
ii) raf 1.00 128.16 20.66 1.00 2,647.78
iii) lif pit slope 1.00 21.00 27.83 1.00 584.43
lif pit 1.00 -6.91 13.83 1.00 (95.56)
8,351.53 CFT

4 PLAIN CEMENT CONCRETE


(1:3:6)
i) raf 1.00 142.25 36.66 0.25 1,303.72
ii) raf 1.00 128.16 20.66 0.25 661.94
iii) lif pit slope 1.00 21.00 27.83 0.25 146.10
lif pit 1.00 -6.91 13.83 0.25 (23.89)
2,087.87 CFT
Detail Estimate for PCC for RCC Works
S.N. DESCRIPTION NO Floor LENGTH BREADTH HEIGHT QUANTITY
1 P.C.C. FOR R.C.C.
M20
RAFT
i) raf 1.00 1.00 142.25 36.66 2.83 14,758.12
ii) raf 1.00 1.00 128.16 20.66 2.83 7,493.23
iii) lif pit slope 1.00 1.00 21.00 27.83 2.83 1,653.93
lif pit 1.00 1.00 -6.91 13.83 2.83 (270.44)

COLUMN
from raf level to plinth level 37 1 2.00 2.00 9.59 1419.32
1 1 2.00 2.00 15.09 60.36
SHEAR WALL
lengthwise 2 1 136.25 0.84 9.59 2,195.15
widthwise 2 1 51.33 0.84 9.59 826.98

LIFT1
lengthwise 2 1 12.66 0.58 15.09 221.60
widthwise 3 1 6.91 0.58 15.09 181.43
dedn lif door -2 11 4.66 0.58 7.00 (37.83)
LIFT2
lengthwise 2 1 12.66 0.58 9.59 140.83
widthwise 3 1 6.91 0.58 9.59 115.30
slab pit 1 1 13.83 6.91 0.50 47.78

PARTITION 2 1 14.58 0.83 9.59 232.10


29,037.86

S.N. DESCRIPTION NO LENGTH BREADTH HEIGHT QUANTITY


PRIMARY BEAM
1 Grid 1-1 1 10 30.25 1.9685039 1.312336 781.45
2 Grid 2-2 1 9 51.33 1.9685039 1.312336 1,193.42
3 Grid 3-3 1 9 51.33 1.9685039 1.312336 1,193.42
4 Grid 4-4 1 9 51.33 1.9685039 1.312336 1,193.42
5 Grid 5-5 1 9 51.33 1.9685039 1.312336 1,193.42
6 Grid 6-6 1 10 51.33 1.9685039 1.312336 1,326.02
7 Grid 7-7 1 10 51.33 1.9685039 1.312336 1,326.02
8 Grid 8-8 1 10 51.33 1.9685039 1.312336 1,326.02
9 Grid 9-9 1 10 51.33 1.9685039 1.312336 1,326.02
10 Grid 10-10 1 10 51.33 1.9685039 1.312336 1,326.02
11 Grid A-A 1 9 136.25 1.312336 1.148294 1,847.89
12 Grid B-B 1 9 136.25 1.312336 1.148294 1,847.89
13 Grid C-C 1 9 136.25 1.312336 1.148294 1,847.89
14 Grid D-D 1 9 122.167 1.312336 1.148294 1,656.89
15 Grid 2-2 top 1 1 30.25 1.312336 1.148294 45.58
16 Grid A-A top 1 1 15.4167 1.312336 1.148294 23.23
17 Grid B-B top 1 1 15.4167 1.312336 1.148294 23.23
18 Grid C-C top 1 1 15.4167 1.312336 1.148294 23.23
19 Grid D-D top 1 1 15.4167 1.312336 1.148294 23.23
SECONDARY BEAM
1 Grid A'-A' 1 10 31.832 1.148294 0.82021 299.80
2 Grid B'-B' 1 9 123.1355 1.148294 0.82021 1,043.76
3 Grid C'-C' 1 9 122.167 1.148294 0.82021 1,035.55
4 Grid B'-B' top 1 1 61.417 1.148294 0.82021 57.84
5 Grid C'-C' top 1 1 61.4167 1.148294 0.82021 57.84
21,903.40

COLUMN
1 for columns of ground floor 38 8 2.00 2.00 12.00 14592
2 at Top floor 25 1 2 2 12 1200
15792
SLAB
Ground to 8th Floor
Area A-C in betn 1-10 1 9 136.667 30.25 0.42 15503.16
Area C-D im betn 2-10 1 9 122.583 22.667 0.42 10419.7
Lif voids 2 -2 9 6.92 13.83 0.42 -717.59
Stair Void grid 1-2 -1 9 6.67 7.00 0.42 -175
Stair Void grid 7-8 -1 9 13.08 11.00 0.42 -539.67
Top Floor
X dirn (1-10) A-C 1 1 14.083 30.25 0.42 177.5
X dirn (6-10) A-D 1 1 63.167 53.667 0.42 1412.49
26080.59
STAIRS
1 Stair grid 1-2 Flight 2 9 4.00 9.58 0.42 287.49
2 Stair grid 1-2 steps 16 9 4.00 0.67 0.42 160
3 Stair grid 7-8 flight 2 9 6.58 13.58 0.42 670.69
4 Stair grid 7-8 steps 22 9 6.58 1.00 0.25 325.89
1444.07

LIFT1 and LIFT2


lengthwise 4 9 12.67 0.58 12.00 3,191.90
widthwise 6 9 6.92 0.58 12.00 2,599.57
dedn lif door -4 9 4.66 0.58 12.00 (1,167.60)
4,623.87

SILL & LINTEL

69,843.93
REMARKS

365.20

303.91

cft

REMARKS S.N. DESCRIPTION NO LENGTH BREADTH HEIGHT


PRIMARY BEAM
1 Grid 1-1 (600*400) 1 1 30.25 1.97 0.90
2 Grid 2-2 (600*400) 1 1 51.33 1.97 0.90
3 Grid 3-3 (600*400) 1 1 51.33 1.97 0.90
4 Grid 4-4 (600*400) 1 1 51.33 1.97 0.90
5 Grid 5-5 (600*400) 1 1 51.33 1.97 0.90
6 Grid 6-6 (600*400) 1 1 51.33 1.97 0.90
7 Grid 7-7 (600*400) 1 1 51.33 1.97 0.90
8 Grid 8-8 (600*400) 1 1 51.33 1.97 0.90
9 Grid 9-9 (600*400) 1 1 51.33 1.97 0.90
10 Grid 10-10 (600*400) 1 1 51.33 1.97 0.90
11 Grid A-A (400*350) 1 1 136.25 1.31 0.73
12 Grid B-B (400*350) 1 1 136.25 1.31 0.73
13 Grid C-C (400*350) 1 1 136.25 1.31 0.73
14 Grid D-D (400*350) 1 1 122.17 1.31 0.73
SECONDARY BEAM
1 Grid A'-A' (350*250) 1 1 31.83 1.15 0.40
2 Grid B'-B' (350*250) 1 1 123.14 1.15 0.40
3 Grid C'-C' (350*250) 1 1 122.17 1.15 0.40

cft

COLUMN
1 from Plinth level to 8t 38 2 2 96

cft

cft

cft

cft

cft
400 350
1.312336 1.148294

304.8
QUANTITY REMARKS
1 0.083333 7 0.583333
53.33 2 0.166667 8 0.666667
90.50 3 0.25 9 0.75
90.50 4 0.333333 10 0.833333
90.50 5 0.416667 11 0.916667
90.50
90.50 2 4 711.2
90.50 2 6 762
90.50 1 6 457.2
90.50 2 0 609.6
90.50 1 4 406.4
130.81
130.81
130.81
117.29
14.75
57.05
56.61

1,505.96 cft

14592

14592 cft
Detail Estimate for Formwork
S.N. DESCRIPTION NO Floors LENGTH BREADTH HEIGHT QUANTITY REMARKS
RAFT
raf 1.00 1.00 357.82 2.83 1,012.63

COLUMN
from raf level to plinth level 37 1.00 8 9.59 2838.64
1 1.00 8 15.09 120.72
SHEAR WALL
lengthwise 4 1.00 136.25 9.59 5226.55
widthwise 4 1.00 51.33 9.59 1969.01

LIFT1
lengthwise 4 1.00 12.66 15.09 764.15
widthwise 6 1.00 6.91 15.09 625.63
dedn lif door -2 1.00 4.66 7 -65.24
side of door 2 1.00 18.66 1 37.32
LIFT2
lengthwise 4 1.00 12.66 9.59 485.63
widthwise 6 1.00 6.91 9.59 397.6
slab pit 1 1.00 13.83 6.91 95.56

PARTITION 4 1.00 14.58 9.59 559.28


2 1.00 1 9.59 19.18
14,086.66 Sft

S.N. DESCRIPTION NO LENGTH BREADTH HEIGHT QUANTITY REMARKS


PRIMARY BEAM
1 Grid 1-1 (600*400) 1 1.00 30.25 1.97 1.31 138.94
2 Grid 2-2 (600*400) 1 1.00 51.33 1.97 1.31 235.76
3 Grid 3-3 (600*400) 1 1.00 51.33 1.97 1.31 235.76
4 Grid 4-4 (600*400) 1 1.00 51.33 1.97 1.31 235.76
5 Grid 5-5 (600*400) 1 1.00 51.33 1.97 1.31 235.76
6 Grid 6-6 (600*400) 1 1.00 51.33 1.97 1.31 235.76
7 Grid 7-7 (600*400) 1 1.00 51.33 1.97 1.31 235.76
8 Grid 8-8 (600*400) 1 1.00 51.33 1.97 1.31 235.76
9 Grid 9-9 (600*400) 1 1.00 51.33 1.97 1.31 235.76
10 Grid 10-10 (600*400) 1 1.00 51.33 1.97 1.31 235.76
11 Grid A-A (400*350) 1 1.00 136.25 1.31 1.15 491.71
12 Grid B-B (400*350) 1 1.00 136.25 1.31 1.15 491.71
13 Grid C-C (400*350) 1 1.00 136.25 1.31 1.15 491.71
14 Grid D-D (400*350) 1 1.00 122.17 1.31 1.15 440.89

SECONDARY BEAM
1 Grid A'-A' (350*250) 1 1.00 31.83 1.15 0.82 88.77
2 Grid B'-B' (350*250) 1 1.00 123.14 1.15 0.82 343.38
3 Grid C'-C' (350*250) 1 1.00 122.17 1.15 0.82 340.68

4,949.63 Sft

COLUMN
1 for columns of ground floor 38 1.00 2.00 2.00 12.00 3,648.00

3648 Sft
SLAB

1 Grid CC-DD 1 1.00 122.17 20.67 2524.82


2 Lif voids 2 -2 1.00 6.92 13.83 -191.35
3 Stair Void grid 1-2 -1 1.00 6.67 7.00 -46.66
4 Stair Void grid 7-8 -1 1.00 13.08 11.00 -143.91
2142.9 Sft
STAIRS
1 Stair grid 1-2 Flight 2 1.00 4.00 9.58 76.66
2 Stair grid 1-2 Flight inclined 1 1.00 9.58 0.92 8.78
3 Stair grid 1-2 steps 16 1.00 4.00 0.67 0.42 42.66
4 Stair grid 7-8 flight 2 1.00 6.58 13.58 178.85
5 Stair grid 7-8 flight inclined 1 1.00 13.58 0.92 12.45
6 Stair grid 7-8 steps 22 1.00 6.58 1.00 0.25 144.84
464.24 Sft

LIFT1 and LIFT2 1.00


lengthwise 4 1.00 12.67 12.00 608.01
widthwise 6 1.00 6.92 12.00 498.00
dedn lif door -4 1.00 4.66 12.00 (223.68)
side of door 4 1.00 18.66 1 74.64
882.33 Sft

12,087.10 Sft
1361.86

978.79
1 Grid AA-CC 1 136.25 20.67 2815.87
Foundation

No of
S. Footing/c Spacing Spacing support Lap
Description Dia Length Length Breadth Breadth No of Bar Len(m) Len(m)
No ols/beam X dirn Y dirn length length
s
(mm) ft m ft m ft ft Astx Asty m m Astx Asty

0 i) raft
0 bottom bar 20 1 142.25 43.37 36.66 11.18 0.50 285 74 1.52 1.20 46.09 13.90
0 top bar 20 1 128.16 39.07 20.66 6.30 0.50 257 42 1.22 1.20 14.33 4.34
0
0 lift pit 20 2 13.00 3.96 14.00 4.27 0.50 26 28 1.20 2.41 2.50
Total length(m) Unit wt Quantity

Astx Asty (kg/m) (kg)

13136.59 1028.69 2.47 34945.74


3683.34 182.27 2.47 9536.47

62.62 70.04 2.47 654.51


45136.73 kg
Detail Estimate for Doors and windows
A WOODEN WORK FOR DOOR

Cross section
S.N. DESCRIPTION Symbols NO a b BREADTH HEIGHT QUANTITY REMARKS
Well seasoned salwood Frame
I (chaukhats) for fixed/openable
door.
1 Main Door DD 7 0.33 0.42 6.0 8.0 29.17
2 Main Door DD1 2 0.33 0.42 4.0 8.0 7.78
3 Door D1 137 0.25 0.33 3.3 8.0 219.77
4 Door D2 111 0.25 0.25 2.5 8.0 128.34
Total 385.06 Cft
Making and fitting fixing sal
wood Panelled door shutter
with 38 mm thick sal wood
frame.
II
1 Main Door DD 7 6.0 8.0 336.00
2 Main Door DD1 2 4.0 8.0 64.00
3 Door D1 137 3.3 8.0 3,562.00
4 Door D2 111 2.5 8.0 2,220.00
6,182.00 Sft

2 Aluminium Works
Cross section
S.N. DESCRIPTION Symbols NO a b BREADTH HEIGHT QUANTITY REMARKS
1 Window LW 1 4.0 96.3 385.00
2 Window W 271 9.0 7.0 17,073.00
3 Window W1 9 2.5 4.0 90.00
4 Window W2 2 3.0 2.0 12.00
5 Window W3 1 6.0 7.0 42.00
6 Sliding Door SD 121 7.0 8.0 6,776.00
Total 24,378.00 Sft
No of No of Lap
Description Dia floor No Col Bar Length Length length
ft m m
upto DPC
C1
Longitudinal Bar 20 1 3 16 19.66 5.99 1.20
Longitudinal Bar 16 1 3 4 19.66 5.99 0.96
Lateral ties (outer) 8 1 3 60 7.48 2.28
Lateral Ties (inner) 8 1 3 60 4.82 1.47
Lateral Ties (inner) 8 1 3 60 4.82 1.47
C2
Longitudinal Bar 25 1 1 12 19.66 5.99 1.50
Longitudinal Bar 20 1 1 8 19.66 5.99 1.20
Lateral ties (outer) 8 1 1 60 7.48 2.28
Lateral Ties (inner) 8 1 1 60 4.82 1.47
Lateral Ties (inner) 8 1 1 60 4.82 1.47
C3
Longitudinal Bar 25 1 1 20 19.66 5.99 1.50
Lateral ties (outer) 8 1 1 60 7.48 2.28
Lateral Ties (inner) 8 1 1 60 4.82 1.47
Lateral Ties (inner) 8 1 1 60 4.82 1.47
C4
Longitudinal Bar 20 1 1 20 25.16 7.67 1.20
Lateral ties (outer) 8 1 1 77 7.48 2.28
Lateral Ties (inner) 8 1 1 77 4.82 1.47
Lateral Ties (inner) 8 1 1 77 4.82 1.47
C5
Longitudinal Bar 20 1 1 12 19.66 5.99 1.20
Longitudinal Bar 16 1 1 8 19.66 5.99 0.96
Lateral ties (outer) 8 1 1 60 7.48 2.28
Lateral Ties (inner) 8 1 1 60 4.82 1.47
Lateral Ties (inner) 8 1 1 60 4.82 1.47
C6
Longitudinal Bar 20 1 22 4 19.66 5.99 1.20
Longitudinal Bar 16 1 22 16 19.66 5.99 0.96
Lateral ties (outer) 8 1 22 60 7.48 2.28
Lateral Ties (inner) 8 1 22 60 4.82 1.47
Lateral Ties (inner) 8 1 22 60 4.82 1.47
C7
Longitudinal Bar 25 1 1 16 19.66 5.99 1.50
Longitudinal Bar 16 1 1 4 19.66 5.99 0.96
Lateral ties (outer) 8 1 1 60 7.48 2.28
Lateral Ties (inner) 8 1 1 60 4.82 1.47
Lateral Ties (inner) 8 1 1 60 4.82 1.47
C8
Longitudinal Bar 20 1 1 12 19.66 5.99 1.20
Longitudinal Bar 16 1 1 8 19.66 5.99 0.96
Lateral ties (outer) 8 1 1 60 7.48 2.28
Lateral Ties (inner) 8 1 1 60 4.82 1.47
Lateral Ties (inner) 8 1 1 60 4.82 1.47
C9
Longitudinal Bar 25 1 4 12 19.66 5.99 1.50
Longitudinal Bar 16 1 4 8 19.66 5.99 0.96
Lateral ties (outer) 8 1 4 60 7.48 2.28
Lateral Ties (inner) 8 1 4 60 4.82 1.47
Lateral Ties (inner) 8 1 4 60 4.82 1.47
C10
Longitudinal Bar 25 1 1 12 19.66 5.99 1.50
Longitudinal Bar 16 1 1 8 19.66 5.99 0.96
Lateral ties (outer) 8 1 1 60 7.48 2.28
Lateral Ties (inner) 8 1 1 60 4.82 1.47
Lateral Ties (inner) 8 1 1 60 4.82 1.47
C11
Longitudinal Bar 25 1 1 12 19.66 5.99 1.50
Longitudinal Bar 16 1 1 8 19.66 5.99 0.96
Lateral ties (outer) 8 1 1 60 7.48 2.28
Lateral Ties (inner) 8 1 1 60 4.82 1.47
Lateral Ties (inner) 8 1 1 60 4.82 1.47
C12
Longitudinal Bar 25 1 1 12 19.66 5.99 1.50
Longitudinal Bar 16 1 1 8 19.66 5.99 0.96
Lateral ties (outer) 8 1 1 60 7.48 2.28
Lateral Ties (inner) 8 1 1 60 4.82 1.47
Lateral Ties (inner) 8 1 1 60 4.82 1.47

No of No of Lap
Description Dia floor No Col Bar Length Length length
From DPC to eight floor
C1
Longitudinal Bar 20 8 3 16 12.00 3.66 1.20
Longitudinal Bar 16 8 3 4 12.00 3.66 0.96
Lateral ties (outer) 8 8 3 37 7.48 2.28
Lateral Ties (inner) 8 8 3 37 4.82 1.47
Lateral Ties (inner) 8 8 3 37 4.82 1.47
C2 8
Longitudinal Bar 25 8 1 12 12.00 3.66 1.50
Longitudinal Bar 20 8 1 8 12.00 3.66 1.20
Lateral ties (outer) 8 8 1 37 7.48 2.28
Lateral Ties (inner) 8 8 1 37 4.82 1.47
Lateral Ties (inner) 8 8 1 37 4.82 1.47
C3 8
Longitudinal Bar 25 8 1 20 12.00 3.66 1.50
Lateral ties (outer) 8 8 1 37 7.48 2.28
Lateral Ties (inner) 8 8 1 37 4.82 1.47
Lateral Ties (inner) 8 8 1 37 4.82 1.47
C4 8
Longitudinal Bar 20 8 1 20 12.00 3.66 1.20
Lateral ties (outer) 8 8 1 37 7.48 2.28
Lateral Ties (inner) 8 8 1 37 4.82 1.47
Lateral Ties (inner) 8 8 1 37 4.82 1.47
C5 8
Longitudinal Bar 20 8 1 12 12.00 3.66 1.20
Longitudinal Bar 16 8 1 8 12.00 3.66 0.96
Lateral ties (outer) 8 8 1 37 7.48 2.28
Lateral Ties (inner) 8 8 1 37 4.82 1.47
Lateral Ties (inner) 8 8 1 37 4.82 1.47
C6 8
Longitudinal Bar 20 8 22 4 12.00 3.66 1.20
Longitudinal Bar 16 8 22 16 12.00 3.66 0.96
Lateral ties (outer) 8 8 22 37 7.48 2.28
Lateral Ties (inner) 8 8 22 37 4.82 1.47
Lateral Ties (inner) 8 8 22 37 4.82 1.47
C7 8
Longitudinal Bar 25 8 1 16 12.00 3.66 1.50
Longitudinal Bar 16 8 1 4 12.00 3.66 0.96
Lateral ties (outer) 8 8 1 37 7.48 2.28
Lateral Ties (inner) 8 8 1 37 4.82 1.47
Lateral Ties (inner) 8 8 1 37 4.82 1.47
C8 8
Longitudinal Bar 20 8 1 12 12.00 3.66 1.20
Longitudinal Bar 16 8 1 8 12.00 3.66 0.96
Lateral ties (outer) 8 8 1 37 7.48 2.28
Lateral Ties (inner) 8 8 1 37 4.82 1.47
Lateral Ties (inner) 8 8 1 37 4.82 1.47
C9 8
Longitudinal Bar 25 8 4 12 12.00 3.66 1.50
Longitudinal Bar 16 8 4 8 12.00 3.66 0.96
Lateral ties (outer) 8 8 4 37 7.48 2.28
Lateral Ties (inner) 8 8 4 37 4.82 1.47
Lateral Ties (inner) 8 8 4 37 4.82 1.47
C10 8
Longitudinal Bar 25 8 1 12 12.00 3.66 1.50
Longitudinal Bar 16 8 1 8 12.00 3.66 0.96
Lateral ties (outer) 8 8 1 37 7.48 2.28
Lateral Ties (inner) 8 8 1 37 4.82 1.47
Lateral Ties (inner) 8 8 1 37 4.82 1.47
C11 8
Longitudinal Bar 25 8 1 12 12.00 3.66 1.50
Longitudinal Bar 16 8 1 8 12.00 3.66 0.96
Lateral ties (outer) 8 8 1 37 7.48 2.28
Lateral Ties (inner) 8 8 1 37 4.82 1.47
Lateral Ties (inner) 8 8 1 37 4.82 1.47
C12 8
Longitudinal Bar 25 8 1 12 12.00 3.66 1.50
Longitudinal Bar 16 8 1 8 12.00 3.66 0.96
Lateral ties (outer) 8 8 1 37 7.48 2.28
Lateral Ties (inner) 8 8 1 37 4.82 1.47
Lateral Ties (inner) 8 8 1 37 4.82 1.47

No of No of Lap
Description Dia floor No Col Bar Length Length length
For top floor
C1
Longitudinal Bar 20 1 3 16 12.00 3.66 1.20
Longitudinal Bar 16 1 3 4 12.00 3.66 0.96
Lateral ties (outer) 8 1 3 37 7.48 2.28
Lateral Ties (inner) 8 1 3 37 4.82 1.47
Lateral Ties (inner) 8 1 3 37 4.82 1.47
C2
Longitudinal Bar 25 1 1 12 12.00 3.66 1.50
Longitudinal Bar 20 1 1 8 12.00 3.66 1.20
Lateral ties (outer) 8 1 1 37 7.48 2.28
Lateral Ties (inner) 8 1 1 37 4.82 1.47
Lateral Ties (inner) 8 1 1 37 4.82 1.47
C3
Longitudinal Bar 25 1 1 20 12.00 3.66 1.50
Lateral ties (outer) 8 1 1 37 7.48 2.28
Lateral Ties (inner) 8 1 1 37 4.82 1.47
Lateral Ties (inner) 8 1 1 37 4.82 1.47
C4
Longitudinal Bar 20 1 1 20 12.00 3.66 1.20
Lateral ties (outer) 8 1 1 37 7.48 2.28
Lateral Ties (inner) 8 1 1 37 4.82 1.47
Lateral Ties (inner) 8 1 1 37 4.82 1.47
C5
Longitudinal Bar 20 1 1 12 12.00 3.66 1.20
Longitudinal Bar 16 1 1 8 12.00 3.66 0.96
Lateral ties (outer) 8 1 1 37 7.48 2.28
Lateral Ties (inner) 8 1 1 37 4.82 1.47
Lateral Ties (inner) 8 1 1 37 4.82 1.47
C6
Longitudinal Bar 20 1 9 4 12.00 3.66 1.20
Longitudinal Bar 16 1 9 16 12.00 3.66 0.96
Lateral ties (outer) 8 1 9 37 7.48 2.28
Lateral Ties (inner) 8 1 9 37 4.82 1.47
Lateral Ties (inner) 8 1 9 37 4.82 1.47
C6 parapet
Longitudinal Bar 20 1 13 4 4.00 1.22 1.20
Longitudinal Bar 16 1 13 16 4.00 1.22 0.96
Lateral ties (outer) 8 1 13 13 7.48 2.28
Lateral Ties (inner) 8 1 13 13 4.82 1.47
Lateral Ties (inner) 8 1 13 13 4.82 1.47
C7
Longitudinal Bar 25 1 1 16 12.00 3.66 1.50
Longitudinal Bar 16 1 1 4 12.00 3.66 0.96
Lateral ties (outer) 8 1 1 37 7.48 2.28
Lateral Ties (inner) 8 1 1 37 4.82 1.47
Lateral Ties (inner) 8 1 1 37 4.82 1.47
C8
Longitudinal Bar 20 1 1 12 12.00 3.66 1.20
Longitudinal Bar 16 1 1 8 12.00 3.66 0.96
Lateral ties (outer) 8 1 1 37 7.48 2.28
Lateral Ties (inner) 8 1 1 37 4.82 1.47
Lateral Ties (inner) 8 1 1 37 4.82 1.47
C9
Longitudinal Bar 25 1 4 12 12.00 3.66 1.50
Longitudinal Bar 16 1 4 8 12.00 3.66 0.96
Lateral ties (outer) 8 1 4 37 7.48 2.28
Lateral Ties (inner) 8 1 4 37 4.82 1.47
Lateral Ties (inner) 8 1 4 37 4.82 1.47
C10
Longitudinal Bar 25 1 1 12 12.00 3.66 1.50
Longitudinal Bar 16 1 1 8 12.00 3.66 0.96
Lateral ties (outer) 8 1 1 37 7.48 2.28
Lateral Ties (inner) 8 1 1 37 4.82 1.47
Lateral Ties (inner) 8 1 1 37 4.82 1.47
C11
Longitudinal Bar 25 1 1 12 12.00 3.66 1.50
Longitudinal Bar 16 1 1 8 12.00 3.66 0.96
Lateral ties (outer) 8 1 1 37 7.48 2.28
Lateral Ties (inner) 8 1 1 37 4.82 1.47
Lateral Ties (inner) 8 1 1 37 4.82 1.47
C12
Longitudinal Bar 25 1 1 12 12.00 3.66 1.50
Longitudinal Bar 16 1 1 8 12.00 3.66 0.96
Lateral ties (outer) 8 1 1 37 7.48 2.28
Lateral Ties (inner) 8 1 1 37 4.82 1.47
Lateral Ties (inner) 8 1 1 37 4.82 1.47

No of No of Lap
Description Dia floor No Col Bar Length Length length
For top floor
Column
Longitudinal Bar 12 1 4 12 37.83 11.53 0.72
Lateral ties (outer) 8 1 4 116 5.00 1.52
Lateral Ties (inner) 8 1 4 116 3.50 1.07
Lateral Ties (inner) 8 1 4 116 3.50 1.07

SUMMARY OF STEEL FOR COLUMN


Total length Unit wt Quantity
m kg/m kg

345.31 2.47 851.87 3.94


83.45 1.58 131.76
410.60 0.40 162.19
264.29 0.40 104.40
264.29 0.40 104.40

89.93 3.85 346.58


57.55 2.47 141.98
136.87 0.40 54.06
88.10 0.40 34.80
88.10 0.40 34.80

149.88 3.85 577.63


136.87 0.40 54.06
88.10 0.40 34.80
88.10 0.40 34.80

177.41 2.47 437.68


175.64 0.40 69.38
113.06 0.40 44.66
113.06 0.40 44.66

86.33 2.47 212.97


55.63 1.58 87.84
136.87 0.40 54.06
88.10 0.40 34.80
88.10 0.40 34.80

633.06 2.47 1561.77


2447.77 1.58 3865.03
3011.05 0.40 1189.36
1938.15 0.40 765.57
1938.15 0.40 765.57

119.90 3.85 462.10


27.82 1.58 43.92
136.87 0.40 54.06
88.10 0.40 34.80
88.10 0.40 34.80

86.33 2.47 212.97


55.63 1.58 87.84
136.87 0.40 54.06
88.10 0.40 34.80
88.10 0.40 34.80

359.71 3.85 1386.31


222.52 1.58 351.37
547.46 0.40 216.25
352.39 0.40 139.19
352.39 0.40 139.19

89.93 3.85 346.58


55.63 1.58 87.84
136.87 0.40 54.06
88.10 0.40 34.80
88.10 0.40 34.80

89.93 3.85 346.58


55.63 1.58 87.84
136.87 0.40 54.06
88.10 0.40 34.80
88.10 0.40 34.80

89.93 3.85 346.58


55.63 1.58 87.84
136.87 0.40 54.06
88.10 0.40 34.80
88.10 0.40 34.80
16762.17 kg

Total length Unit wt Quantity

233.21 2.47 4602.63 3.94


55.42 1.58 700.10
253.20 0.40 800.12
162.98 0.40 515.02
162.98 0.40 515.02

61.90 3.85 1908.58


38.87 2.47 767.10
84.40 0.40 266.71
54.33 0.40 171.67
54.33 0.40 171.67

103.17 3.85 3180.96


84.40 0.40 266.71
54.33 0.40 171.67
54.33 0.40 171.67
97.17 2.47 1917.76
84.40 0.40 266.71
54.33 0.40 171.67
54.33 0.40 171.67

58.30 2.47 1150.66


36.95 1.58 466.73
84.40 0.40 266.71
54.33 0.40 171.67
54.33 0.40 171.67

427.55 2.47 8438.15


1625.72 1.58 20536.16
1856.81 0.40 5867.53
1195.19 0.40 3776.80
1195.19 0.40 3776.80

82.54 3.85 2544.77


18.47 1.58 233.37
84.40 0.40 266.71
54.33 0.40 171.67
54.33 0.40 171.67

58.30 2.47 1150.66


36.95 1.58 466.73
84.40 0.40 266.71
54.33 0.40 171.67
54.33 0.40 171.67

247.61 3.85 7634.30


147.79 1.58 1866.92
337.60 0.40 1066.82
217.31 0.40 686.69
217.31 0.40 686.69

61.90 3.85 1908.58


36.95 1.58 466.73
84.40 0.40 266.71
54.33 0.40 171.67
54.33 0.40 171.67

61.90 3.85 1908.58


36.95 1.58 466.73
84.40 0.40 266.71
54.33 0.40 171.67
54.33 0.40 171.67

61.90 3.85 1908.58


36.95 1.58 466.73
84.40 0.40 266.71
54.33 0.40 171.67
54.33 0.40 171.67
87873.45 kg

Total length Unit wt Quantity

290.81 2.47 717.43 3.94


66.94 1.58 105.70
253.20 0.40 100.01
162.98 0.40 64.38
162.98 0.40 64.38

79.90 3.85 307.94


48.47 2.47 119.57
84.40 0.40 33.34
54.33 0.40 21.46
54.33 0.40 21.46

133.17 3.85 513.24


84.40 0.40 33.34
54.33 0.40 21.46
54.33 0.40 21.46

121.17 2.47 298.93


84.40 0.40 33.34
54.33 0.40 21.46
54.33 0.40 21.46

72.70 2.47 179.36


44.63 1.58 70.47
84.40 0.40 33.34
54.33 0.40 21.46
54.33 0.40 21.46

218.11 2.47 538.07


803.31 1.58 1268.43
759.61 0.40 300.04
488.94 0.40 193.13
488.94 0.40 193.13

188.21 2.47 464.33


653.02 1.58 1031.12
385.51 0.40 152.27
248.14 0.40 98.02
248.14 0.40 98.02
106.54 3.85 410.59
22.31 1.58 35.23
84.40 0.40 33.34
54.33 0.40 21.46
54.33 0.40 21.46

72.70 2.47 179.36


44.63 1.58 70.47
84.40 0.40 33.34
54.33 0.40 21.46
54.33 0.40 21.46

319.61 3.85 1231.78


178.51 1.58 281.87
337.60 0.40 133.35
217.31 0.40 85.84
217.31 0.40 85.84

79.90 3.85 307.94


44.63 1.58 70.47
84.40 0.40 33.34
54.33 0.40 21.46
54.33 0.40 21.46

79.90 3.85 307.94


44.63 1.58 70.47
84.40 0.40 33.34
54.33 0.40 21.46
54.33 0.40 21.46

79.90 3.85 307.94


44.63 1.58 70.47
84.40 0.40 33.34
54.33 0.40 21.46
54.33 0.40 21.46
11213.83 kg

Total length Unit wt Quantity

622.73 0.89 552.98


707.32 0.40 279.39
495.12 0.40 195.57
495.12 0.40 195.57
1,223.52
S. Description Size of Dia No of No of Len Len Lap length Dev length Total length Unit wt
No Beam floor Bar/stirr at end
ups junction

mm Nos Nos ft m m m m kg/m


A Widthwise
a Grid 1-1 upto 5th floor, Section 1-2 ### ###
1 Bottom /Top main Bar 20 6 8 30.25 9.22 1.20 2.40 615.48 2.47
2 Bottom Bar 16 6 2 30.25 9.22 0.96 1.92 145.23 1.58
3 Top Extra Bar 16 6 2 22.75 6.94 0.96 1.92 117.79 1.58
4 Skin Bar 12 6 2 30.25 9.22 0.72 1.44 136.59 0.89
5 Stirrups 8 6 62 2.45 911.40 0.40
Grid 1-1 6th to top floor,Section 3-4 ### ###
1 Bottom /Top main Bar 20 4.74932 3 30.25 9.22 1.20 2.40 182.70 2.47
2 Bottom /Top main Bar 16 4.74932 5 30.25 9.22 0.96 1.92 287.39 1.58
3 Top Extra Bar 16 4.74932 2 22.75 6.94 0.96 1.92 93.24 1.58
4 Skin Bar 12 4.74932 2 30.25 9.22 0.72 1.44 108.12 0.89
5 Stirrups 8 4.74932 62 2.05 603.64 0.40

b Grid 2-2 upto 7th floor, Section 8-9-10 ### ###


1 Bottom /Top main Bar 20 8 7 51.33 15.65 1.20 2.40 1,077.97 2.47
2 Bottom Bar 16 8 1 51.33 15.65 0.96 1.92 148.24 1.58
3 Top Extra Bar 20 8 2 38 11.59 1.20 2.40 242.97 2.47
3 Skin Bar 12 8 2 51.33 15.65 0.72 1.44 284.95 0.89
4 Stirrups 8 8 105 2.05 1,722.00 0.40
Grid 2-2 8th Floor, Section 5-6-7 ### ###
1 Bottom /Top main Bar 20 1 4 51.33 15.65 1.20 2.40 77.00 2.47
2 Bottom /Top main Bar 16 1 4 51.33 15.65 0.96 1.92 74.12 1.58
3 Top Extra Bar 20 1 2 38 11.59 1.20 2.40 30.37 2.47
4 Skin Bar 12 1 2 51.33 15.65 0.72 1.44 35.62 0.89
5 Stirrups 8 1 105 2.05 215.25 0.40
Grid 2-2 Top Floor, Section 3-4 ### ###
1 Bottom /Top main Bar 20 1 3 51.33 15.65 1.20 2.40 57.75 2.47
2 Bottom /Top main Bar 16 1 5 51.33 15.65 0.96 1.92 92.65 1.58
3 Top Extra Bar 16 1 2 16 4.88 0.96 1.92 15.52 1.58
4 Skin Bar 12 1 2 51.33 15.65 0.72 1.44 35.62 0.89
5 Stirrups 8 1 105 2.05 215.25 0.40
c Grid 3,4,5 Section 5-6 ### ###
1 Bottom /Top main Bar 20 27 4 51.33 15.65 1.20 2.40 2,078.93 2.47
2 Bottom /Top main Bar 16 27 4 51.33 15.65 0.96 1.92 2,001.17 1.58
3 Top Extra Bar 20 27 2 38 11.59 1.20 2.40 820.01 2.47
4 Skin Bar 12 27 2 51.33 15.65 0.72 1.44 961.71 0.89
5 Stirrups 8 27 105 2.05 5,811.75 0.40
d Grid 6-6 upto 8th Floor, Section 7-6-7 ### ###
1 Bottom /Top main Bar 20 9 4 51.33 15.65 1.20 2.40 692.98 2.47
2 Bottom /Top main Bar 16 9 4 51.33 15.65 0.96 1.92 667.06 1.58
3 Top Extra Bar 20 9 2 38 11.59 1.20 2.40 273.34 2.47
4 Skin Bar 12 9 2 51.33 15.65 0.72 1.44 320.57 0.89
5 Stirrups 8 9 105 2.05 1,937.25 0.40
Grid 6-6 Top Floor, Section 3-4 ### ###
1 Bottom /Top main Bar 20 1 3 51.33 15.65 1.20 2.40 57.75 2.47
2 Bottom /Top main Bar 16 1 5 51.33 15.65 0.96 1.92 92.65 1.58
3 Top Extra Bar 16 1 2 38 11.59 0.96 1.92 28.93 1.58
4 Skin Bar 12 1 2 51.33 15.65 0.72 1.44 35.62 0.89
5 Stirrups 8 1 105 2.05 215.25 0.40
e Grid 7,8,9,10 upto 8th Floor, Section 7-6-7 ### ###
1 Bottom /Top main Bar 20 36 4 51.33 15.65 1.20 2.40 2,771.91 2.47
2 Bottom /Top main Bar 16 36 4 51.33 15.65 0.96 1.92 2,668.23 1.58
3 Top Extra Bar 20 36 2 38 11.59 1.20 2.40 1,093.35 2.47
4 Skin Bar 12 36 2 51.33 15.65 0.72 1.44 1,282.28 0.89
5 Stirrups 8 36 105 2.05 7,749.00 0.40
Grid 7,8,9,10 Top Floor, Section 3-4 ### ###
1 Bottom /Top main Bar 20 4 3 51.33 15.65 1.20 2.40 230.99 2.47
2 Bottom /Top main Bar 16 4 5 51.33 15.65 0.96 1.92 370.59 1.58
3 Top Extra Bar 16 4 2 38 11.59 0.96 1.92 115.72 1.58
4 Skin Bar 12 4 2 51.33 15.65 0.72 1.44 142.48 0.89
5 Stirrups 8 4 105 2.05 861.00 0.40

B lengthwise
a Grid A-A upto 8th floor, for Section 14-15 ### ###
1 Bottom /Top main Bar 20 9 2 122.5 37.35 1.20 2.40 737.06 2.47
2 Bottom Bar 16 9 5 122.5 37.35 0.96 1.92 1,810.24 1.58
3 Top Extra Bar 20 9 2 83.334 25.41 1.20 2.40 522.12 2.47
4 Stirrups 8 9 249 1.55 3,473.55 0.40
Grid A-A upto 8th floor, for Section 16-17 ### ###
1 Bottom /Top main Bar 20 8 9 17.083 5.21 1.20 2.40 634.19 2.47
2 Top Extra Bar 20 8 4 8 2.44 1.20 2.40 193.25 2.47
3 Skin Bar 12 8 2 122.5 37.35 0.72 1.44 632.12 0.89
4 Stirrups 8 8 35 1.95 546.00 0.40
Grid A-A top floor, for Section 12-13 ### ###
1 Bottom /Top main Bar 16 1 6 78.75 24.01 0.96 1.92 161.33 1.58
2 Top Extra Bar 20 2 2 53.334 16.26 1.20 2.40 79.44 2.47
3 Stirrups 8 1 161 1.55 249.55 0.40
b Grid B-B upto 8th floor, Section 14-15 ### ###
1 Bottom /Top main Bar 20 9 2 136.25 41.54 1.20 2.40 812.51 2.47
2 Bottom Bar 16 9 5 136.25 41.54 0.96 1.92 1,998.88 1.58
3 Top Extra Bar 20 9 2 91.334 27.85 1.20 2.40 566.02 2.47
4 Stirrups 8 9 277 1.55 3,864.15 0.40
Grid B-B top floor, for Section 12-13 ### ###
1 Bottom /Top main Bar 16 1 6 78.75 24.01 0.96 1.92 161.33 1.58
2 Top Extra Bar 20 2 2 53.334 16.26 1.20 2.40 79.44 2.47
3 Stirrups 8 1 161 1.55 249.55 0.40
c Grid C, D upto 8th floor, Section 14-15 ### ###
1 Bottom /Top main Bar 20 9 2 122.167 37.25 1.20 2.40 735.23 2.47
2 Bottom Bar 16 9 5 122.167 37.25 0.96 1.92 1,805.67 1.58
3 Top Extra Bar 20 9 2 91.334 27.85 1.20 2.40 566.02 2.47
4 Stirrups 8 9 249 1.55 3,473.55 0.40
Grid C-C top floor, for Section 12-13 ### ###
1 Bottom /Top main Bar 16 1 6 122.167 37.25 0.96 1.92 240.76 1.58
2 Top Extra Bar 20 2 2 53.334 16.26 1.20 2.40 79.44 2.47
3 Stirrups 8 1 249 1.55 385.95 0.40
Secondary Beam
d Grid B'-B' upto 8th floor, Section 18 ### ###
1 Bottom /Top main Bar 20 9 4 136.25 41.54 1.20 2.40 1,625.03 2.47
2 Bottom Bar 16 9 6 136.25 41.54 0.96 1.92 2,398.66 1.58
3 Stirrups 8 9 277 1.25 3,116.25 0.40
e Grid C'-C' upto 8th floor, Section 18 ### ###
1 Bottom /Top main Bar 20 9 4 136.25 41.54 1.20 2.40 1,625.03 2.47
2 Bottom Bar 16 9 6 136.25 41.54 0.96 1.92 2,398.66 1.58
3 Stirrups 8 9 277 1.25 3,116.25 0.40
Portico
A Widthwise
Stap Beam ### ###
1 Bottom /Top main Bar 20 2 6 27.5 8.38 1.20 2.40 143.81 2.47
4 Skin Bar 12 2 2 27.5 8.38 0.72 1.44 42.18 0.89
5 Stirrups 8 2 68 2.25 306.00 0.40
Lower Tie Beam ### ###
1 Bottom /Top main Bar 16 2 6 30.167 9.20 0.96 1.92 144.93 1.58
5 Stirrups 8 2 62 1.15 142.60 0.40
Plinth Beam ### ###
1 Bottom /Top main Bar 20 2 6 57.667 17.58 1.20 2.40 254.18 2.47
5 Stirrups 8 2 118 1.45 342.20 0.40
Floor Beam ### ###
1 Bottom /Top main Bar 20 2 6 57.667 17.58 1.20 2.40 254.18 2.47
2 Skin Bar 12 2 2 57.667 17.58 0.72 1.44 78.97 0.89
3 Top Extra Bar 12 2 2 28.8335 8.79 0.72 1.44 43.80 0.89
4 Stirrups 8 2 118 1.85 436.60 0.40
a Ribbed Beam ### ###
1 Bottom /Top main Bar 12 5 4 57.667 17.58 0.72 1.44 394.83 0.89
2 Bottom /Top main Bar 16 5 2 57.667 17.58 0.96 1.92 204.61 1.58
4 Skin Bar 12 5 2 28.8335 8.79 0.72 1.44 109.51 0.89
5 Stirrups 8 5 118 1.25 737.50 0.40

SUMMARY OF STEEL FOR BEAM

Description 8 dia 10 dia 12 dia 16 dia 20 dia 25 dia 32 dia Total


Foundation beam/Tie beam & beam 15293.05 0.00 3530.39 28254.73 45783.25 0.00 0.00 92861.42
Total 15293.05 3530.39 92861.42

Total quantity of steel for beam= 92861.42 kg


Quantity

kg

1518.40
229.32
185.99
121.29
360.00

450.71
453.80
147.22
96.01
238.44

2659.34
234.06
599.40
253.04
680.19

189.95
117.03
74.92
31.63
85.02

142.46
146.29
24.50
31.63
85.02

5128.73
3159.85
2022.96
854.00
2295.64

1709.58
1053.28
674.32
284.67
765.21

142.46
146.29
45.68
31.63
85.02

6838.31
4213.14
2697.29
1138.66
3060.86

569.86
585.16
182.73
126.52
340.10

1818.32
2858.37
1288.07
1372.05

1564.55
476.74
561.32
215.67

254.75
195.98
98.57

2004.47
3156.24
1396.38
1526.34

254.75
195.98
98.57

1813.81
2851.16
1396.38
1372.05

380.15
195.98
152.45

4008.94
3787.48
1230.92

4008.94
3787.48
1230.92

354.78
37.45
120.87

228.84
56.33

627.05
135.17

627.05
70.12
38.90
172.46

350.61
323.09
97.24
291.31
No of No of Length Length Height Height
S.No Description Dia Spacing No of Bar Len(m) Len(m) Lap Len(m) Total length(m)
grid sides
(mm) f m f m m Astx Asty Astx Asty Astx Asty
A shear wall

Retaining wall vertical


bar binded in L
1 shaped 12 1 2.00 344.57 105.05 17.33 5.28 0.15 690 5.28 0.72 4142.57
Retaining wall binder
1 bothside 8 1 2.00 136.25 41.54 12.83 3.91 0.150 27 41.54 0.48 1134.53

1 8 1 2.00 51.33 15.65 12.83 3.91 0.150 27 15.65 0.48 435.50

1 8 1 2.00 122.25 37.27 12.83 3.91 0.150 27 37.27 0.48 1019.29

1 8 1 2.00 20.66 6.30 12.83 3.91 0.150 27 6.30 0.48 183.03

1 8 1 2.00 14.08 4.29 12.83 3.91 0.150 27 4.29 0.48 128.87


1
1 lift retaining wall 1
Retaining wall vertical
bar binded in L
1 shaped 12 10 2.00 48.39 14.75 22.83 6.96 0.15 97 6.96 0.72 745.01
Retaining wall binder
1 bothside 8 10 2.00 13.83 4.22 18.33 5.59 0.150 38 4.22 0.48 178.47
1 8 10 2.00 13.83 4.22 18.33 5.59 0.150 38 4.22 0.48 178.47
1 8 10 6.00 6.91 2.11 18.33 5.59 0.150 38 2.11 0.48 98.30
1 dedn 12 10 2.00 -4.66 -1.42 7.00 2.13 0.150 -10 2.13 0.72 -28.54
1 8 10 2.00 -4.66 -1.42 7.00 2.13 0.150 15 -1.42 0.48 -14.11
1
1 lift retaining wall 2
Retaining wall vertical
bar binded in L
1 shaped 12 10 2.00 48.39 14.75 17.33 5.28 0.15 97 5.28 0.72 582.36
Retaining wall binder
1 bothside 8 10 2.00 13.83 4.22 12.83 3.91 0.150 27 4.22 0.48 126.81
1 8 10 2.00 13.83 4.22 12.83 3.91 0.150 27 4.22 0.48 126.81
1 8 10 6.00 6.91 2.11 12.83 3.91 0.150 27 2.11 0.48 69.84
1 lift pit slab 12 10 2.00 13.83 4.22 6.91 2.11 0.15 28 14 4.22 2.11 0.72 69.11 79.15
1
1 Partition 12 2 2.00 14.58 4.45 17.33 5.28 0.15 30 5.28 0.72 180.11
8 2 2.00 14.58 4.45 12.83 3.91 0.150 27 4.45 0.48 132.98

Total quantity (Kg)=

footing
column
shear wall
Total
add 5% wastage
Grand Total
Unit wt Quantity

(kg/m) (kg)

0.89 7357.20

0.40 896.28

0.40 344.04

0.40 805.24

0.40 144.59

0.40 101.80

0.89 13231.44

0.40 1409.92
0.40 1409.92
0.40 2329.70
0.89 -506.93
0.40 -111.46

0.89 10342.73
0.40 1001.78
0.40 1001.78
0.40 1655.31
0.89 2633.20

0.89 639.76
0.40 210.11

44896.42

45136.73
16762.17
44896.42
106795.32
5339.77
Grand Total 112135.08