NNEL EXCAVATION BOQ
QUANTITY RATE/UNIT AMOUNT
14883200.00
Project: BHAGALPUR BWSP02 ANNEXURE-B1 APPROACH CHANNEL EXCAVATION BOQ
SL NO ITEM DESCRIPTION UOM
Excavation/surfacing requirement for gabion wall installation. Manually or by
mechinical means complete in all repects. Preparation of levelled ground for
placing gabions of the first layer as per mentioned in the specifications or as per
2 instructions of Engineer-in-charge.Depth shall be 18-20 meter and lead of CUM
disposal upto 8 Km including protection area for sheet pile, driving and taking
out after work.
Backfilling the behind the gabion wall as per cross section drawing and as per
3 MoRTH specifications provided from borrowed area 8 Km away. CUM
Providing and fixing CE marked TechFab metal Gabion Wall. The gabion box
indigenously manufactured as per required section including boxes made of
mechanically woven hexagonal shaped wire mesh of type (10X12)cm, edges
mechanically selvedged made of heavily (Zinc + PVC) coated GI wire as per
BS:443, mesh wire 2.70/3.70 mm (ID/OD) of Techfab India type and filled with
20 to 50 Kg weighy trap stones including conveying with all leads and lifts and
4 placing at required places in required lines, level, slope, section as directed etc. CUM
and tied by 3% lacing wire 2.20/3.20 mm (ID/OD) as directed by Engineer in
charge complete. Specification : IS 16014, MoRTH 2500, excluding rubble.
Total
NNEL EXCAVATION BOQ
QUANTITY RATE/UNIT AMOUNT
55233680.00
Project: BHAGALPUR BWSP02 ANNEXURE-B2 APPROACH CHANNEL EXCAVATION BOQ
SL NO ITEM DESCRIPTION UOM
Installation by boring through soil,sand from working ground level upto the
founding level as per installation criteria. Cast in citu bored reinforced concrete
vertical piles, control of position and alignment, drilling mud, maintaining the
pile bore, cleaning the pile bore by bentonite flushing, including cost of
necessary layout, materials, plant and equipment, dewatering (if required)
bentonite slurry, provition of steeel tank or making of pakka tank (directed by
site engineer0 for bentonite slurry preparation, carriage and disposing of bored
spoil materials and contaminated mud etc. including drainage and collection of
slurry mud in pits and disposal there after, upto a lead of 1.5 Km outside the
plant boundery for all working conditions , preparation of scheme of boring etc.
8 complete with all labour, materials, equipments, handling, transportation, 0
drawings and instructions of site engineerfor piles of following diameters. The
rate shall include supply of concrete and supply of concrete pump for placing of
concrete if required. Before starting of the work designmix for concrete shall be
furnished and approved from client. Rates to be inclusive of of reinforcement
steel.
RM
Total
ANNEL EXCAVATION BOQ
QUANTITY RATE/UNIT AMOUNT
0 0 0