You are on page 1of 9

of Structure- RCC Retaining Wall

me of contractor- Ajay Sharma


Bill No - Final Bill
sl no Item unit No L B H

Earthwork in excavation for foundation of


structures in all types of soil as per drawing
and technical specification Clause 305 and
1104 of MoRD includding setting out,
construction of shoring and bracing,
1 removal of stumps and other deleterious cum 1.000 47.000 3.470 1.650
material and disposal upto all lead & lift,
dressing of sides and bottom and back
filling with excavated suitable material
upto 3mt. as per direction of Engineer-in-
Charge.

Sand filling in foundation & trenches as per


2 approved drawing & technical specification cum 1.000 46.400 3.470 0.150
etc complete.

Plain/reinforced cement concrete in sub-


structure complete as per drawings and
3 MORD technical specification Clauses cum 1.000 46.400 3.470 0.150
800,1200 and as per direction of the
Engineer in charge (1:3:6)

RCC M20 in sub-structure complete as per


4 cum 1.000 46.100 3.170 0.450
drawing and technical specification

5 RCC M20 in super-structure complete as cum 1.000 46.100 1.025 4.450


per drawing and technical specification

providing weep holes in brick


masonary/plain/reinforced concrete
abutment, wing wall,/ return wall with
6 Rmt 2.000 44.000 1.025
100mm dia AC pipe extending through full
width of structure
providing & laying of filter media with
granular materials/stone crushed
aggregates satisfying the requirements laid
down in clause 2504.2.2 of MORTH
7 specification to a thickness of not less than cum 0.000 0.000 0.000 0.000
600mm over the entire surface behind
abutment, wing wall, and return wall
complete as per drawing and technical
specification.

supplying, fitting and placing HYSD bar


reinforcement in foundation sub-structure,
8 Qtl
super-structure, complete as per drawing
and technical specification.

Bottam mat 308.000 6.940 0.890


Bottam mat distrubution bar 46.000 46.000 0.617
Bottam mat distrubution bar over lap 184.000 0.500 0.617
chair 92.000 1.400 0.890
wall main bar 308.000 12.000 0.890
wall distrubution bar 66.000 46.000 0.617
wall distrubution bar over lap 264.000 0.500 0.617
Spacer bar 153.000 1.250 0.617
Total weight in qtl
Total bill Amount
TWENTY THREE LAKHS FOURTYSEVEN THOUSAND TWO HUNDRED THIRTY SIX RU
Qnty Rate Amount Remarks

Height is
269.099 160.000 43055.760 taken from
site MTS
Average

24.151 450.000 10868.040

24.151 3723.130 89918.057

65.762 4611.390 303252.615

Bottom &
210.274 6430.150 1352090.950 tope width
Average

Two lane
weep hole
90.200 300.000 27060.000 provide in
this
structure
Back filling
0.000 0.000 requird for
filter media

1902.393
1305.572
56.764
114.632
3289.440
1873.212
81.444
118.001
87.415 5960.000 520990.900
2347236.32
WO HUNDRED THIRTY SIX RUPEES
NAME OF AGENCY- AJAY SHARMA
JHARSUGUDA , MANGALBAZAAR
CONT-+917894563560
E-MAIL- ajaysharma817@gmail.com
Aggregment Rate
Name of Agency-Ajay Sharma
Project Details- RCC Retaining wall construction 46.10 m
Project Location- Kaintara Bridge
Sl No Items Unit

Earthwork in excavation for foundation of structures in all types of soil as


per drawing and technical specification Clause 305 and 1104 of MoRD
1 includding setting out, construction of shoring and bracing, removal of cum
stumps and other deleterious material and disposal upto all lead & lift,
dressing of sides and bottom and back filling with excavated suitable
material upto 3mt. as per direction of Engineer-in-Charge.

2 Sand filling in foundation & trenches as per approved drawing & technical cum
specification etc complete.

Plain/reinforced cement concrete in sub-structure complete as per


3 drawings and MORD technical specification Clauses 800,1200 and as per cum
direction of the Engineer in charge (1:3:6)

RCC M20 in sub-structure complete as per drawing and technical


4 cum
specification

5 RCC M20 in super-structure complete as per drawing and technical cum


specification

providing weep holes in brick masonary/plain/reinforced concrete


abutment, wing wall,/ return wall with 100mm dia AC pipe extending
6 Rmt
through full width of structure
providing & laying of filter media with granular materials/stone crushed
aggregates satisfying the requirements laid down in clause 2504.2.2 of
7 MORTH specification to a thickness of not less than 600mm over the entire cum
surface behind abutment, wing wall, and return wall complete as per
drawing and technical specification.

supplying, fitting and placing HYSD bar reinforcement in foundation sub-


8 structure, super-structure, complete as per drawing and technical Qtl
specification.
Rate

160.000

450.000

3723.130

4611.390

6430.150

300.000
5960.000

You might also like